Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants  

Sung, Hongsuk (School of Industrial Engineering and Naval Architecture, Changwon National University)
Jung, Jong-yun (School of Industrial Engineering and Naval Architecture, Changwon National University)
Park, Chulsoon (School of Industrial Engineering and Naval Architecture, Changwon National University)
Publication Information
Journal of Korean Society of Industrial and Systems Engineering / v.39, no.4, 2016 , pp. 72-80 More about this Journal
Abstract
The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.
Keywords
EPC Project; Exception Prediction; Sensitivity Analysis; Bayesian Network;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 AgenaRisk, Bayesian Network and Simulation Software Tool, http://www.agena.co.uk.
2 Arditi, D. and Gutierrez, A.E., Factors affecting U.S. contractors performance overseas, Journal of Construction Engineering and Management, 1991, Vol. 117, No. 1, pp. 27-46.   DOI
3 Bayes, T., An Essay Towards Solving a Problem in the Doctrine of Chances, Philosophical Transaction of the Royal Society of London, 1763, Vol. 53, pp. 370- 418.   DOI
4 Bing, L. and Tiong, L.K., Risk management model for international construction joint ventures, Journal of Construction Engineering and Management, 1999, Vol. 125, No. 5, pp. 337-384.
5 Cook, M.S., Real-World Monte Carlo Analysis, Proceeding of PMI Annual Seminars and Symposium, Nashville, 2001.
6 Han, S.H. and Diekmann, J.E., Approaches for making risk-based Go/No-Go decision for international projects, Journal of Construction Engineering and Management, 2001, Vol. 127, No. 4, pp. 300-308.   DOI
7 Han, S.H., Kim, D.Y., Kim, H., and Jang, W-S., A webbased integrated system for international project risk management, Automation in Construction, 2008, Vol. 17, No. 3, pp. 342-356.   DOI
8 Jensen, F.V., Bayesian Networks and Decision Graphs, New York, United States., Springer-Verlag, 2001.
9 Jung, H.S., Lee, D.W., and Lee, M.K., A case study of Six Sigma Project for Reducing the Project Costs through Project Risk Management, Journal of the Korean Society for Quality Management, 2005, Vol. 33, No. 3, pp. 135-148.
10 Kerur, S. and Marshall, W., Identifying and managing risk in international construction projects, International Review of Law, 2012.
11 Kuchta, D., Use of Fuzzy Numbers in Project Risk (Criticality) Assessment, International Journal of Project Management, 2001, Vol. 19, No. 5, pp. 305-310.   DOI
12 PMI, A Guide to the Project Management Body of Knowledge, 5th Ed., , 14 Campus Blvd., Newtown Square, PA 19073-3299, USA, 2013, pp. 309-354.
13 Luu, V.T., Kim, S.Y., Tuan, N.V., and Ogunlana, S.O., Quantifying Schedule Risk in Construction Projects Using Bayesian Belief Networks, International Journal of Project Management, 2009, Vol. 27, No. 1, pp. 39-50.   DOI
14 Monga, A., 5 Common Reasons for Shipping Delays from China 10 Causes of Shipping Delays from China-Part 1 and Part 2, The Sourcing Blog, http://www.thesourcingblog.com/10-causes-of-shipping-delays-fromchina/ Accessed November 2016.
15 Odeh, A.M. and Battaineh, U.T., Causes of construction delay : traditional contracts, International Journal of Project Management, 2002, Vol. 20, No. 2, pp. 67-73.   DOI
16 Purtell, M.I., Problems in administering overseas projects, Issues in Engineering, Journal of Professional Activities, 1982, Vol. 108, No. 2, pp. 140-144.
17 Sung, H. and Park, C., Project Schedule Risk Assessment Based on Bayesian Nets, Journal of Society of Korea Industrial and Systems Engineering, 2016, Vol. 39, No. 1, pp. 9-16.   DOI
18 Van Dorp, J.R. and Duffey, M.R., Statistical Dependence in Risk Analysis for Project Networks Using Monte Carlo Methods, International Journal of Production Economics, 1999, Vol. 58, No. 1, pp. 17-29.   DOI
19 Ward, S.C. and Chapman, C.B., Risk-management perspective on the project lifecycle, International Journal of Project Management, 1995, Vol. 13, No. 3, pp. 145-149.   DOI
20 Williams, T., Why Monte Carlo Simulations of Project Networks Can Mislead, Project Management Journal, 2004, Vol. 35, No. 3, pp. 53-61.
21 Yang, H., Analysis of Weights Given Observations in the Bayeian Reliability Prediction, Journal of Society of Korea Industrial and Systems Engineering, 1999, Vol. 22, No. 51, pp. 53-61.