• Title/Summary/Keyword: project performance evaluation

Search Result 616, Processing Time 0.028 seconds

A Simulation Model Construction for Performance Evaluation of Public Innovation Project

  • Koh, Chan
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.87-109
    • /
    • 2006
  • The purpose of this paper is to examine the present performance evaluation methods and to make Monte Carlo Simulation Model for the IT-based Government innovation project. It is suggested the proper ways in applying of Monte Carlo Simulation Model by integration of present evaluation methods. It develops the theoretical framework for this paper, examining the existing literature on proposing an approach to the key concepts of the economic impact analysis methods. It examines the actual conditions of performance evaluation focusing on the It-based Government Innovation project. It considers how the simulation model is applied to the performance management in the public innovation project focusing on the framework, process and procedure of performance management.

  • PDF

A Case Study on Efficiency Evaluation of DMUs Performances for Digital Pioneer Project by Data Envelopment Analysis Model (DEA를 활용한 차세대첨단콘텐츠육성사업 참여 DMU의 효율성 평가에 관한 사례 연구)

  • Shin, Jae-Shig;Yang, Hae-Sool
    • Journal of Information Technology Services
    • /
    • v.6 no.1
    • /
    • pp.65-81
    • /
    • 2007
  • Recently, the affiliates of the Ministry of Information and Communication have been conducting a performance evaluation study on IT policy projects, based on the performance evaluation model of the U.S. Office of Management and Budgets, with regard to investment in computerization. The performance evaluation model for the policy project could provide the objective information required for the planning, development, and operation of the policy project. However, the performance of the most policy project is likely to be evaluated using the subjective evaluation criteria of evaluators. Therefore, this case study evaluates the relative efficiency using DEA (Data Envelopment Analysis) in order to improve the performance evaluation method of the digital pioneer' project implemented by the Korea IT Industry Promotion Agency. The improvement value of inefficient Decision Making Units (DMUs) was measured by a static efficiency analysis. The measured value will suggest a objective viewpoint of the performance between DMUs to evaluators. In doing so, it will show an appropriate direction for the policy project to be evaluated successfully.

Evaluation System for Defense IT Project in Korea: Post-Implementation Stage

  • Lee, Sangho;Song, Chong-Hyun
    • Journal of Multimedia Information System
    • /
    • v.5 no.4
    • /
    • pp.291-297
    • /
    • 2018
  • Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.

A Study of Status and Alternative System on Six Sigma Project Evaluation System (6시그마 프로젝트 평가시스템 현황과 대안연구)

  • Yang, Jong-Gon
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.13 no.5
    • /
    • pp.124-132
    • /
    • 2008
  • Most companies in Korea that are implementing six sigma programs evaluate belt's project performance based on their own evaluation systems. Financial performance is a major criterion to evaluate project performance. New project evaluation systems which are based on not only financial performance but also non-financial performance need to be presented for better performance system. The study presents the integration system of balanced scorecard and six sigma project evaluation systems to show balanced view points of performance. Each evaluation index of four view points are presented in the study and could be utilized for alternative project evaluation systems.

  • PDF

A Case on the Evaluation of the Information System Project to Enhance the Performance of DIMS(Defense Material Information System) (국방물자정보시스템 성능개선 사업평가에 대한 사례)

  • Cho, Sung-Rim;Lim, Gyoo-Gun;Lee, Dae-Chul
    • Journal of Information Technology Services
    • /
    • v.11 no.1
    • /
    • pp.109-123
    • /
    • 2012
  • There are many evaluation models to measure the informatization level of an organization and information system project in the ministry of National Defense of Korea. A information system has to keep up with the environment change as well as the advanced recent information technology (IT). Therefore, the evaluation of an information system project to enhance the performance of the information system should be different from the existing evaluation methods. This study suggests an evaluation case of information system projects to enhance the performance of an information system. In order to achieve the objective of this study, the following steps are taken. First, it reviews the background and the scope of the project to enhance the performance of the Defense Material Information System (DMIS). And it sets up the evaluation logic and develops performance indexes. Then it applies these newly developed performance indexes to the information system project and measures the performance. From this study, we found that both the diffusion and the experience accumulation by its continuous use are significant factors in such evaluations.

A Study on Advanced Analysis of Construction Project Performance Evaluation (건설사업 수행성과평가에 대한 분석 고도화 연구)

  • Kim, Kyong hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

A Study on the Development and Application of Performance Evaluation Model for Defense Standard Improvement Projects (국방규격 개선사업의 성과평가모형 개발 및 적용방안 연구)

  • Lee, Min Cheol;Kim, Young Hyun;Ahn, Young Jun;Kim, Jun Su
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.2
    • /
    • pp.185-202
    • /
    • 2023
  • Purpose: The purpose of this study is to identify key performance evaluation items and factors that are effective and practical for project management of defense standard standard improvement projects, and to develop a quantitative performance evaluation model. Methods: For the development of a performance evaluation model for defense standard improvement projects, we analyzed past major project performance and derived evaluation items and factors. To increase the objectivity and efficiency of project evaluation, we developed an evaluation index that enables relative evaluation of evaluation targets, and calculated the main importance of evaluation items using the Analytic Hierarchy Process (AHP) method based on the main opinions of expert groups. Results: The study resulted in the identification of main performance items for defense standard improvement projects, which were classified into defense standard conformity review performance and defense standard improvement performance items. We also simplified the evaluation model by integrating various evaluation items into similar evaluation factors. Additionally, we developed a quantitative evaluation index that enables relative evaluation of the targets and verified the objectivity and validity of the suggested performance evaluation model by reevaluating it using performance data from past commissioned professional institutions Conclusion: Developing a quantitative evaluation model for defense standard improvement projects is expected to provide a means of measuring the effectiveness of the project, and to be used as a tool to determine the appropriateness and effectiveness of medium and long-term project plans.

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

Evaluation Method of Technology Development Project based on Decomposition Approach and Options Thinking (분해접근과 옵션사고에 기반한 기술개발 프로젝트의 평가방법)

  • Cho Kyu-Kab;Moon Byung-Keun
    • Journal of Korea Technology Innovation Society
    • /
    • v.8 no.3
    • /
    • pp.1117-1138
    • /
    • 2005
  • Due to the increasing importance of technology development project evaluation, many evaluation methods have been developed. However, most project evaluation methods are not directly applicable for evaluating performance improvement projects in a manufacturing system. It is due to the fact that the existing project evaluation methods do not deal with the performance evaluation of the system. This paper deals with performance measurement model of a manufacturing system based on decomposition method and evaluation method for technology development project based on options thinking. A case example is discussed to illustrate the process of the proposed evaluation method.

  • PDF

An Exploratory Study on the Relationship with Previous Project Risk Evaluation and Project Performance (사전 프로젝트 리스크 평가와 프로젝트 성과와의 관계에 관한 탐색적 연구)

  • Hosnag, Kim;Kyungsik Yang
    • Journal of Service Research and Studies
    • /
    • v.12 no.3
    • /
    • pp.70-92
    • /
    • 2022
  • Project risk assessment is the most important activity performed at the beginning of a project because it can judge the performance of the project in advance. In this study, We were evaluated risk with traditional risk factors such as technology and schedule, etc, and Indirect risks factors such as financial, strategic, and special risks. and then, we analyzed what kind of relationship these risk evaluation factors have on business performance and customer satisfaction. As a result of the research, it was found that the risk evaluation items had a relationship with performance and customer satisfaction. However, It is possible that the performance may differ depending on how risks are managed after risk assessment. Therefore, follow-up studies should be conducted, including information on risk management practices. This study is meaningful that presenting practical risk evaluation items and at the same time identifying the relationship with performance. We plan to further the study in future studies including the evaluation of risk management process.