1 |
Abu-Hijileh, S. F. and C. W. Ibbs (1989), "Schedule-based construction incentives", Journal of Construction Engineering and Management, 115(3): 430-443.
DOI
|
2 |
American Association of State Highway and Transportation Officials (AASHTO) (2006), Primer on Contracting for the Twenty-first Century, Contract Administration Section of the AASHTO Subcommittee on Construction, Fifth Edition, Washington, D.C.
|
3 |
Anderson, S. and I. Damnjanovic (2008), Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion, National Cooperative Highway Research Program(NCHRP), NCHRP synthesis 379, Transportation Research Board, National Research Council, Washington, D.C.
|
4 |
Choi, K., Y. Kwak, J. Pyeon and K. Son (2012), "Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects", Journal of Construction Engineering and Management, 138(3): 323-330.
DOI
|
5 |
Christiansen, D. L. (1987), "An analysis of the Use of incentive/disincentive contracting provisions for early project completion", Transportation Management for Major Highway Reconstruction, Special Report 212, Transportation Research Board, Washington, D.C.
|
6 |
Ellis, R. and J. Pyeon (2005), "A study of simulation-based contract incentives and disincentives usage", Construction Research Congress: Broadening Perspectives, American Society of Civil Engineers, San Diego, CA.
|
7 |
Ellis, R., J. Pyeon, Z. Herbsman, E. Minchin and K. Molenaar (2007), Evaluation of Alternative Contracting Techniques on FDOT Construction Projects, Final Report, Florida Department of Transportation, Tallahassee, Florida.
|
8 |
Federal Highway Administration (FHWA) (1989), Incentive/Disincentive for Early Contract Completion, FHWA Technical Advisory T5080.10, Washington, D.C. (November 2, 2019).
|
9 |
Hasan, A. and K. N. Jha (2016), "Acceptance of the incentive/disincentive contracting strategy in developing construction markets:Empirical study from India", Journal of Construction Engineering and Management, 142(2): 04015064.
DOI
|
10 |
Minnesota Department of Transportation (MnDOT) (2005), Innovative Contracting in Minnesota 2000 to 2005, Office of Construction and Innovative Contracting, MnDOT, Minnesota.
|
11 |
Pyeon, J. (2005), "Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance", Ph.D. Dissertation, Department of Civil and Coastal Engineering, University of Florida, Gainesville, Florida.
|
12 |
Sillars, D. and J. Leray (2007), "Incentive/Disincentive contracting practices for transportation projects", Alternative Project Delivery Procurement and Contracting Methods for Highways, The Construction Institute of ASCE, Construction Research Council, ISBN-13: 978-0-7844-0886-5, pp. 129-152, Reston, VA.
|