• Title/Summary/Keyword: project cost

Search Result 2,412, Processing Time 0.029 seconds

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

An Estimation of the Standard Cost of Project Management of Empowerment Sector in Comprehensive Rural Village Development Project (일반농산어촌개발 지역역량강화사업비의 적정요율 산정)

  • Choi, Young-Wan;Park, Hyun-Yong;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.3
    • /
    • pp.131-144
    • /
    • 2013
  • The existing standard cost of project management of empowerment sector in general rural development project has problems with standard cost system without considering characteristics of empowerment project and unclear division of works. These problems are a lot of trouble to fulfill the project. Thus, it needs an arrangement of standard cost considering detailed characteristics of project management in the empowerment sector. The contents and results of this study can be summarized as follows. 1) To set accurate standard cost, we carried out three-step processes, such as elicitation of standard works, calculation of workload and determination of standard cost. (1) In an investigation of 30 rural area dividing 8 parts about an workload of empowerment project, an average workload is 1,499 hours. (2) Based on this results, the standard cost is calculated at 15% of project cost in over 600 million won, at 28.75% of project cost in under 500 million won, by standards of empowerment project cost. 2) It set the responsibility management cost to 15% of empowerment project cost considering existing awareness, workload and work professionalism of project management. Based on the results, It suggested the practical use as basis for efficient management of the future empowerment projects. To achieve this, It needs to promote maximizing results on the whole project through the legalization processes including amendment of existing regulations.

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

A Study on the Development of PMO Cost Estimation Model (PMO 대가 산정모형의 개발)

  • Seo, Yong Won;Lee, Duck Hee
    • Journal of Information Technology Services
    • /
    • v.13 no.4
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

Prediction Model of Final Project Cost using Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem

  • Yoo, Wi Sung;Hadipriono, FAbian C.
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.191-200
    • /
    • 2007
  • This paper introduces a tool for predicting potential cost overrun during project execution and for quantifying the uncertainty on the expected project cost, which is occasionally changed by the unknown effects resulted from project's complications and unforeseen environments. The model proposed in this stuff is useful in diagnosing cost performance as a project progresses and in monitoring the changes of the uncertainty as indicators for a warning signal. This model is intended for the use by project managers who forecast the change of the uncertainty and its magnitude. The paper presents a mathematical approach for modifying the costs of incomplete work packages and project cost, and quantifying reduced uncertainties at a consistent confidence level as actual cost information of an ongoing project is obtained. Furthermore, this approach addresses the effects of actual informed data of completed work packages on the re-estimates of incomplete work packages and describes the impacts on the variation of the uncertainty for the expected project cost incorporating Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem. For the illustration purpose, the Introduced model has employed an example construction project. The results are analyzed to demonstrate the use of the model and illustrate its capabilities.

Integrating Deep Learning with Web-Based Price Analysis to Support Cost Estimation

  • Musa, Musa Ayuba;Akanbi, Temitope
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.253-260
    • /
    • 2022
  • Existing web-based cost databases have proved invaluable for construction cost estimating. These databases have been utilized to compute approximate cost estimates using assembly rates, unit rates, and etc. These web-based databases can be used independently with traditional cost estimation methods (manual methods) or used to support BIM-based cost estimating platforms. However, these databases are rigid, costly, and require a lot of manual inputs to reflect recent trends in prices or prices relative to a construction project's location. To address this gap, this study integrated deep learning techniques with web-based price analysis to develop a database that incorporates a project's location cost estimating standards and current cost trends in generating a cost estimate. The proposed method was tested in a case study project in Lagos, Nigeria. A cost estimate was successfully generated. Comparison of the experimental results with results using current industry standards showed that the proposed method achieved a 98.16% accuracy. The results showed that the proposed method was successful in generating approximate cost estimates irrespective of project's location.

  • PDF

Suggestions on Efficient Cost Management for Public Construction Projects - Focused on Total Project Cost Management System- (공공건설사업 사업비 관리의 문제점 및 개선방안 - 총사업비관리제도를 중심으로-)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.12-21
    • /
    • 2013
  • Total Project Cost Management System(TPCMS) was introduced with the purpose of increasing the efficiency of cost control for public construction project in 1994. In this paper, general perception of participants of the public construction project on the TPCMS was examined, and the problems in implementing the TPCMS was figured out through expert interviews and survey. Then better ways to implement the system were drawn based on the problems. To effectively manage the cost of public construction project, basically project cost should be estimated accurately in planning stage and managed based on it to have a project complete within the budget. In addition, the cost need to be managed in more systematic ways in terms of data collection and analysis, and the autonomy in managing the project cost given to the project owner needs to be expanded. Most of all, proper budget should be provided to prevent a project from delay through setting the priority of projects and proper budget allocation based on the priority.

Quantifying Risk Factors on Cost Performance By Characterizing Capital Facility Projects

  • Jang, Myung-Hoon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.177-183
    • /
    • 2006
  • Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.

A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique (서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구)

  • Shin, Jae-Min;Kim, Gwang-Hee
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.11 no.3
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.