• Title/Summary/Keyword: priority of the improvement plans

Search Result 42, Processing Time 0.029 seconds

Presumed Influence Factors of User Satisfaction of Seoul Digital Industrial Complex using PLS-Regression Model (PLS 회귀분석을 통한 서울디지털산업단지 이용자 만족도 영향요인 규명)

  • Jeong, Gwang-Seop;Park, Gyu-Yong;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.6
    • /
    • pp.3931-3943
    • /
    • 2014
  • Domestic industrial complexes have more loss competitiveness due to their deterioration length and environmental problems. Therefore, it is necessary to suggest the direction of realignment as advanced industrial estates and establish new alternative plans for improving the quality of public and environmental designs as well as reinforcing the competitive power. This study examined the design planning factors affecting the service users' satisfaction in the Seoul Digital Industrial Complex through a PLS regression model. The research result showed that 12 crucial design planning factors out of a total 31 planning factors have a more than 1.0 VIP. In addition, 8 comparatively important planning aspects that were measured between 0.9 and 1.0 were also investigated. These factors were the strategic design planning factors estimating the quantitative priority while enforcing the design improvement project and they should be considered as a useful material for strengthening the competitive power of the Seoul Digital Industrial Complex.

A Study on the Improvement of New Growth Engine Fund Management Ways by PEF Vehicle (사모투자펀드 기구를 이용한 신성장동력투자펀드 운용방식의 개선에 관한 연구)

  • Chung, Ki-Yun;Lee, Cheol-Gyu
    • Journal of Korea Technology Innovation Society
    • /
    • v.13 no.3
    • /
    • pp.538-557
    • /
    • 2010
  • Korean Government has supplied small-medium enterprises with various technology financing programs such as R&D grant." loans, equities, guarantees since 1980's. The purpose of this study is to render policy suggestions for policy makers by analysing problems with regard to regulations. The suggestions of this study are such as the following. First, the current three months of the fund formation period should be extended within six months for general partners to have enough time to raise funds in the current tough capital market situation. Second, the government's non priority loss devotion system should keep going to prevent general partner's moral hazard. Third, in order to fulfill the policy purpose that is to create globally well-known companies, the government investment ratio should scale up from the current 20% to 30% of the total fund size in that the stable capital supply for core technology commercialization, industrialization and globalization of companies is achieved. Finally, general partners of the New Growth Engine Fund should showoff their investment abilities to the potential investors such as institutional investors by accumulating all track records and know-hows that prove their specialities and implementing action plans to achieve the best result of their investment. This study provides general considerations of the selection procedure, the government investment ratio, the government priority loss devotion system and so on when formating the public funds.

  • PDF

A Study on the Systematic Improvement of Civil Aviation Safety (민간항공 안전의 체계적 개선에 관한 연구)

  • Kim, Maeng-Sern
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.6
    • /
    • pp.17-33
    • /
    • 2004
  • Korea's economic development plans instituted in the 1970's, affected by the growth centered policy and rapid industrialization, have prevailed without having aviation safety management system, along with the safety of the other various means of transportation, settled in its place, and subsequently, the aviation accidents occurred until the beginning of year 2000 have incurred an enormous social expense, not to say of a massive loss of human lives. Especially, with regard to the causal factors of accidents, most of recent accidents have been associated with human factor of airmen, thus, only if this can be detected in advance and prevented, the aircraft accident rate will be reduced by a large margin. Therefore, in order to develope improvement methods on the safety system of civil aviation, in this study, safety management system has been divided into three stages: an advance preventive system, a handling system at an accident's occurrence and a post accident handling system, and thereby improvement methods on aviation safety have been suggested for each stage. The threatening factors agatinst aviation safety have been found to be the absence of management standards and regulations, the indifference to or the lack of the law abiding apirit as major factors, and in order to improve on which, it is required that the settlement of the institutional safety management system should precede, and that the Government and the aviation industry should also make a continuous effort to identify the threatening factors against aviation safety, and to provide incentives for the law abiding spirit and the attitude of giving top priority to safety to spread among all the employees.

Analysis of Priorities of Policy Implementation Tasks for Revitalizing Virtual Reality(VR) and Augmented Reality(AR) Industries (가상현실(Virtual Reality)및 증강현실(Augmented Reality) 산업 활성화를 위한 정책추진 과제의 우선순위 분석)

  • Jung, Hyunseung;Kim, Kiyoon;Hyun, Daiwon
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.9
    • /
    • pp.12-23
    • /
    • 2021
  • This study organizes policy tasks currently being promoted by the government to revitalize the domestic VR and AR industries, which are evaluated to be stagnant compared to major overseas countries, and aims to derive priorities through analysis of an AHP survey for experts in the VR/AR field, and to seek countermeasures based on the analysis results. As a result of classification based on various previous studies, press releases, and policy data, it was divided into 5 major categories and 16 sub-categories: technical issues, awareness improvement, legal/institutional improvement, government support, and manpower development. As a result of the AHP analysis, in the major category, the "government support" appeared as the top priority policy task, followed by the "manpower development". In the sub-categories, "training new manpower" was the most important policy implementation task, followed by "enhancing technological competitiveness". This study is meaningful in that it selects and presents prioritized policy tasks that clearly reflect the position and perspective of the industry on the policy-making situation exposed to the limitations of time and resources, while also presenting practical improvement plans.

A Study on Major Safety Problems and Improvement Measures of Personal Mobility (개인형 이동장치의 안전 주요 문제점 및 개선방안 연구)

  • Kang, Seung Shik;Kang, Seong Kyung
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.1
    • /
    • pp.202-217
    • /
    • 2022
  • Purpose: The recent increased use of Personal Mobility (PM) has been accompanied by a rise in the annual number of accidents. Accordingly, the safety requirements for PM use are being strengthened, but the laws/systems, infrastructure, and management systems remain insufficient for fostering a safe environment. Therefore, this study comprehensively searches the main problems and improvement methods through a review of previous studies that are related to PM. Then the priorities according to the importance of the improvement methods are presented through the Delphi survey. Method: The research method is mainly composed of a literature study and an expert survey (Delphi survey). Prior research and improvement cases (local governments, government departments, companies, etc.) are reviewed to derive problems and improvements, and a problem/improvement classification table is created based on keywords. Based on the classification contents, an expert survey is conducted to derive a priority improvement plan. Result: The PM-related problems were in 'non-compliance with traffic laws, lack of knowledge, inexperienced operation, and lack of safety awareness' in relation to human factors, and 'device characteristics, road-drivable space, road facilities, parking facilities' in relation to physical factors. 'Management/supervision, product management, user management, education/training' as administrative factors and legal factors are divided into 'absence/sufficiency of law, confusion/duplication, reduced effectiveness'. Improvement tasks related to this include 'PM education/public relations, parking/return, road improvement, PM registration/management, insurance, safety standards, traffic standards, PM device safety, PM supplementary facilities, enforcement/management, dedicated organization, service providers, management system, and related laws/institutional improvement', and 42 detailed tasks are derived for these 14 core tasks. The results for the importance evaluation of detailed tasks show that the tasks with a high overall average for the evaluation items of cost, time, effect, urgency, and feasibility were 'strengthening crackdown/instruction activities, education publicity/campaign, truancy PM management, and clarification of traffic rules'. Conclusion: The PM market is experiencing gradual growth based on shared services and a safe environment for PM use must be ensured along with industrial revitalization. In this respect, this study seeks out the major problems and improvement plans related to PM from a comprehensive point of view and prioritizes the necessary improvement measures. Therefore, it can serve as a basis of data for future policy establishment. In the future, in-depth data supplementation will be required for each key improvement area for practical policy application.

Comprehensive Diagnosis and Improvement Plans on Agricultural Production Cost Survey Statistics (농축산물생산비조사 통계의 종합적 품질 진단 및 개선 방안)

  • Koo, Seung-Mo;Kim, Sounghun;Lee, Kay-O;Sohn, Chang-Soo;Han, Suk-Ho
    • Journal of agriculture & life science
    • /
    • v.45 no.6
    • /
    • pp.291-301
    • /
    • 2011
  • This study is based on the diagnosis process on agricultural production cost survey, which is one of the most representative public statistics of agricultural sector in Korea. The diagnosis were performed by employing the quantitative and qualitative approaches with the official guideline provided by the Ministry of Statistics. The various results were produced from the aspects of exactness, relevance, timeliness, accessibility, and comparability, which were based on the qualitative approaches including focus group interview (FGI) with professional users. The results from statistical portfolio analysis implies that the first priority to improve the statistics is given to 'satisfaction level corresponding to user cost' and 'offering sufficient explanation'. The comprehensive results, discussed with the administrative office, are summarized into the following two major points. First, classification of the detailed items should be improved to avoid users' confusion. However, the re-classification need to be professionally reviewed with the relevant administrative office such as Rural Development Administration, producing similar statistics. Second, the KOSIS system is found to be constantly upgraded to improve the users' convenience.

A Study on Priority Analysis of Improvements for Success Factors in Steps of Formation Process of Cooperation Network (산학협력 네트워크 형성 과정의 단계별 성공 요인에 대한 실행 개선 요구 분석 연구)

  • Ahn, Jae-Yeong;Lee, Byung-Wook
    • Journal of vocational education research
    • /
    • v.36 no.1
    • /
    • pp.77-103
    • /
    • 2017
  • The purposes of this study are 1) to analyse the importance and performance of the success factors in steps of Formation process Of Cooperation NetWork(FoCNW) of educational institutions and businesses, and 2) to draw the success factors that need improvement. To achieve these purposes a survey research was conducted with a group of 1,098 (professors, teachers and workers in charge of cooperation at universities, technical colleges, vocational high schools and businesses which are equipped with a cooperation system), and 339 questionnaires were analyzed. The major results of the study are as follows. Firstly, while cooperation workers showed high recognition on the importance of success factors in steps of FoCNW, their performance of those factors was relatively low. Secondly, both the recognition of importance and performance of success factors in steps of FoCNW was higher in educational institutions than in businesses. Thirdly, the success factors in need of improvements from both educational institutions and businesses are 'collecting outer information and consulting' and 'publicizing cooperation competency', 'setting cooperative activities (programs) and contents of agreements', 'managing cooperation quality formally', 'drawing plans for sustainable cooperation improvement' and 'diffusing cooperation network'. The success factors in need of improvements from educational institutions are 'perceiving necessity of and forming consensus on cooperation' and 'deciding and supporting the worker in charge of cooperation', and 'participating and sharing of organization members'. The success factors in need of improvements from businesses are 'deciding goals and performance strategies', 'developing mutual understanding and checking possibility of cooperation with potential partners', and 'evaluating cooperation activities and their outcomes and providing feedback' and 'adjusting contents of agreements and deciding whether to maintain cooperation'. Therefore, efforts from each partner to improve those factors and support from related organizations are necessary.

A Study on the Crisis Management Standard Manual for Large-scale Human Accident at Workplace for Efficiency of Disaster Response (재난대응 효율화를 위한 사업장 대규모 인적사고 위기관리 표준매뉴얼 개정방안 연구)

  • Woo Sub Shim;Sang Beam Kim
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.656-664
    • /
    • 2023
  • Purpose: The Ministry of Employment and Labor manages disasters based on the standard manual for risk management of large-scale human accidents in workplaces when large-scale disasters such as fires and collapses occur in workplaces. We are going to check the standard manual currently in operation and suggest improvement plans for the insufficient items. Method: Accordingly, the standard manual was checked together with internal and external experts in the disaster management manual and disaster management staff at headquarters and local government offices, and items to be improved were identified with priority. Result: In case of a collapse accident, it is necessary for the Ministry of Public Administration and Security to accurately present the selection criteria in order to eliminate the controversy over the selection of the disaster management department. In addition, it seems necessary to supplement the details of the disaster safety communication network operation and evacuation guidelines. Conclusion: In the future, in order to improve the disaster management system that meets the public's eye level, it is expected to prepare a standard manual for risk management of large-scale human accidents in workplaces that guarantees the lives and safety of workers through the collection of opinions from experts in the relevant field, disaster management personnel, and the general public.

Analysis on the Trends of Studies Related to the National Competency Standard in Korea throughout the Semantic Network Analysis (언어네트워크 분석을 적용한 국가직무능력표준(NCS) 연구 동향 분석)

  • Lim, Yun-Jin;Son, Da-Mi
    • 대한공업교육학회지
    • /
    • v.41 no.2
    • /
    • pp.48-68
    • /
    • 2016
  • This study was conducted to identify the NCS-related research trends, Keywords, the Keywords Networks and the extension of the Keywords using the sementic network analysis and to seek for the development plans about NCS. For this, the study searched 345 the papers, with the National Competency Standards or NCS as a key word, among master's theses, dissertations and scholarly journals that RISS provides, and selected a total of 345 papers. Annual frequency analysis of the selected papers was carried out, and Semantic Network Analysis was carried out for 68 key words which can be seen as key terms of the terms shown by the subject. The method of analysis were KrKwic software, UCINET6.0 and NetDraw. The study results were as follows: First, NCS-related research increased gradually after starting in 2002, and has been accomplishing a significant growth since 2014. Second, as a result of analysis of keyword network, 'NCS, development, curriculum, analysis, application, job, university, education,' etc. appeared as priority key words. Third, as a result of sub-cluster analysis of NCS-related research, it was classified into four clusters, which could be seen as a research related to a specific strategy for realization of NCS's purpose, an exploratory research on improvement in core competency and exploration of college students' possibility related to employment using NCS, an operational research for junior college-centered curriculum and reorganization of the specialized subject, and an analysis of demand and perception of a high school-level vocational education curriculum. Fourth, the connection forming process among key words of domestic study results about NCS was expanding in the form of 'job${\rightarrow}$job ability${\rightarrow}$NCS${\rightarrow}$education${\rightarrow}$process, curriculum${\rightarrow}$development, university${\rightarrow}$analysis, utilization${\rightarrow}$qualification, application, improvement${\rightarrow}$plan, operation, industry${\rightarrow}$design${\rightarrow}$evaluation.'

A Study on the Problem Analysis of Designation and Management of the Zone of Urban Nature Park (도시자연공원구역 지정 및 관리상의 문제점 분석)

  • Lee, Jeoung-Suk;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.3
    • /
    • pp.98-106
    • /
    • 2011
  • This study was performed with the purpose of providing basic data for the improvement of zoning regulations of urban nature park by analyzing the present problem which occurred during last 6 years from the year of 2005 when the program was introduced for the first time. The study was processed first by the analysis of the cases of problems evoked by citizens, second the other problems was delineated by interviews of officials, at last the validity of all of the problems was verified by a group of professionals through delphi method. The results can be summarized as follows. 1. In relation to the designation and management of urban national park areas, designation criteria, designation process, maintenance, laws and regulations and 20 other items were found to be problematic. After Delphi method, 5 items were removed and 2 added. The results showed that there were 17 problematic items in total. 2. Regarding the problem of criteria for designation, which are, lack of priority(weights), lack of objectivity due to the difficulty to use quantitative evaluation method, incompatibility for contaminated land environmental impact assessment, incompatibility of land suitability assessment, lack of detailed field survey standards, lack of national park area standards, and 6 other items. 3. Regarding the problem of designation process, which are, the occurrence of civil appeals for designating a new national park, the needs of feasibility study on the urban national park areas constructed before urban national park guidelines came out, lack of a comprehensive review of the boundaries set when determining national park area management plan, poor temporal and financial conditions for an accurate field survey, and 4 other items. 4. Regarding the problem of maintenance management, which are, lack of management system in each space, lack of effectiveness of Urban Nature Park Area Management Plan among master plans for park and green areas, the occurrence of dual managers due to dual natures such as purpose area and city park, lack of professional manpower to manage park areas, and 4 other items. 5. Regarding the problems of regulation guidelines, which are, lack of separate urban park area management plan, incompatibility of the permitted facilities in the park to the park area standards, lack of feasibility study on urban park areas, and 3 other items.