• Title/Summary/Keyword: power test

검색결과 10,126건 처리시간 0.04초

LOSS OF OFFSITE POWER TEST EXPERIENCE FOR YGN 4

  • Chi, Sung-Goo;Sung, Kang-Sik;Kim, Se-Chang;Kim, Eul-Ki;Eom, Young-Meen;Park, Young-Boo
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1995년도 추계학술발표회논문집(1)
    • /
    • pp.230-234
    • /
    • 1995
  • The loss of offsite power test was successfully performed on YGN 4 to demonstrate that the reactor can be shutdown and the RCS can be maintained in a hot standby condition following a loss of all offsite Alternating Current (AC) power. Following the loss of main generator and all offsite AC power, the ensile emergency diesel generators were automatically started and the plant was stabilized via natural circulation. Plant conditions were maintained in hot standby for at least 30 minutes before offsite power was restored. Thus, the capability of equipment, controls and instrumentation necessary to remove decay heat from the core using only ensile emergency power was demonstrated, thereby satisfying all objectives and acceptance criteria of the test.

  • PDF

분산전원이 연결된 22.9[kV] 배전계통의 양방향 보호기기 실증시험 연구 (The Study on the Actual Examination of the Bidirectional Protection Device in the 22.9[kV] Distribution Power System Interconnected with the DG)

  • 이흥재;최명호
    • 조명전기설비학회논문지
    • /
    • 제25권10호
    • /
    • pp.102-108
    • /
    • 2011
  • The existing power flow has a single direction to the line end but the bidirectional power flow will possibly occur depending on the output capacity in the 22.9[kV] distribution power system connected with the dispersed generation(DG). So these characteristics would influence the power system management. The DG have many advantages such as assistance source, Load share etc. So the utility must apply the bidirectional protection system so as to maximize an advantage of DG. This paper describes the field test case of bidirectional protective device in order to investigate the device performance when applied to bidirectional power system. We have tested in the power system test site of KEPCO and these tests provide the basis for performance verification test of bidirectional protective device in the power system.

테스트 데이터와 전력소비 단축을 위한 저비용 SOC 테스트 기법 (Low Cost SOC(System-On-a-Chip) Testing Method for Reduction of Test Data and Power Dissipation)

  • 허용민;인치호
    • 대한전자공학회논문지SD
    • /
    • 제41권12호
    • /
    • pp.83-90
    • /
    • 2004
  • 본 논문은 SOC의 테스트 데이터 압축과 전력소비를 단축시키기 위한 효율적인 스캔 테스트 방법을 제안한다. 제안된 테스트 방법은 deterministic 테스트 데이터와 그 출력응답을 분석하여 출력응답의 일부분이 차기에 입력될 테스트 데이터로 재사용될 수 있는지를 결정한다. 실험결과, 비압축된 deterministic 입력 테스트 데이터와 그 응답간에 높은 유사도가 있음을 알 수 있다. 제안된 테스트 방법은 ISCAS'89 벤치마크 회로를 대상으로 소요되는 클럭 시간을 기준으로 평균 29.4%의 전력소비단축과 69.7%의 테스트 데이터 압축을 가져온다.

발전설비의 성능진단 적용 무선계측 기술 (Wireless Measurement Technology for Power Plant Performance Diagnosis)

  • 김의환;이응곤;홍은기
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제3권1호
    • /
    • pp.9-16
    • /
    • 2017
  • The performance test is conducted for the purpose of determining the accurate thermal performance of the power generation facility or deriving the factors of thermal efficiency degradation. Compared to the acquisition method of power plant thermal performance test data by compensating cable or transmission cable, performance test using wireless instrument can acquire digital data in order to shorten the period due to installation and demolition of instrument and enhance safety of workers and relatively accurate data can be acquired thereby improving work efficiency. Wireless instruments have already been introduced to the market a long time ago, and some of them are used in industry such as petrochemical industry. However, there is no example which has been conducted for performance test of power generation facilities. In order to apply power generation facilities, a reliable system capable of acquiring performance data smoothly without affecting the control system is required. The wireless measurement system can eliminate the measurement defects and errors such as the damage due to the movement of the connecting cable, the extension due to the extension of the shield wire, the contact failure at the contact point between the measuring sensor and the connecting wire, This method has the advantage of collecting relatively accurate performance test data.

집중력, 청각반응속도, 순발력이 민첩성에 미치는 영향 (The effects of a concentration, an auditory reaction time and a muscle power on an agility)

  • 김미경;남지윤;노수영;한동욱
    • 대한물리치료과학회지
    • /
    • 제19권3호
    • /
    • pp.17-22
    • /
    • 2012
  • Background : The purpose of this study was to investigate the relationship between an agility and a concentration, an auditory reaction time and a muscle power. Methods : Twenty one healthy female college students who were 20-21 years participated in the experiment; after being introduced to the methods, they voluntarily signed a consent form. And they received several test related with this study; side step test for an agility, Harris & Harris test for a concentration, brain auditory evoked potential test for an auditory reaction time and vertical jump test for a muscle power. Result : There was no relationship between the agility and the concentration and the auditory reaction time. However, the muscle power related with the agility significantly. Conclusion : In conclusion, these findings suggest that a muscle power training is a good way to promote an agility. So, we can find out that, in an player who requires an agility, a muscle power training is the most important way for promoting an agility than a concentration training or an auditory reaction time training.

  • PDF

도시철도 직류 전력량 계측을 위한 직류용 스마트미터링 시스템 개발 및 성능시험 (Development and Performance Test of DC Smart Metering System for the DC Power Measurement of Urban Railway)

  • 정호성;신승권;김형철;박종영
    • 전기학회논문지
    • /
    • 제63권5호
    • /
    • pp.713-718
    • /
    • 2014
  • DC urban railway power system consists of DC power network and AC power network. The DC power network supplies electric power to railway vehicles and the AC power network supplies electric power to station electric equipment. Recently, because of power consumption reduction and peak load shaving, intelligent measurement of regenerative energy and renewable energy adapted on DC urban railway is required. For this reason, DC smart metering system for DC power network shall be developed. Therefore, in this paper, DC voltage sensor, current sensor, and DC smart meter were developed and evaluated by performance test. DC voltage sensor was developed for measuring standard voltage range of DC urban railway, and DC current sensor was developed as hall effect split core type in order to install in existing system. DC smart meter possesses function of general intelligent electric power meter, such as measuring electricity and wireless communication etc. And, DC voltage sensor showed average 0.17% of measuring error for 2,000V/50mA, and current sensor showed average 0.21% of measuring error for ${\pm}2,000V/{\pm}4V$ in performance test. Also DC smart meter showed maximum 0.92% of measuring error for output of voltage sensor and current sensor. In similar environment for real DC power network, measuring error rate was under 0.5%. In conclusion, accuracy of DC smart metering system was confirmed by performance test, and more detailed performance will be verified by further real operation DC urban railway line test.

Correlation between Uni-standing Balance Ability, Jumping Ability, and Anaerobic Lower Extremity Muscle Power of High School Taekwondo Players

  • Jeong, Mo-beom
    • Physical Therapy Rehabilitation Science
    • /
    • 제10권4호
    • /
    • pp.457-462
    • /
    • 2021
  • Objective: This study analyzed the correlation between uni-standing balance ability, jumping ability, and anaerobic lower extremity power of high school Taekwondo players. Design: Cross-sectional study Methods: Two high schools recruited 36 taekwondo players, but 5 were dropped due to personal circumstances and preparations for the tournament, so the number was counted as 31. In order to test uni-standing balance ability, the Romberg test was performed using Biorescue to measure the sway area. In order to test jumping ability, standing long jump and standing highjump were measured. For anaerobic lower extremity muscle power test, the peak power and average power were measured through 30-second pedaling using a Wingate system bicycle. Results: Participants did not show any correlation with other measures in the uni-standing balance ability test (p>0.05). Looking at the correlation in the standing long jump, standing high jump (r=0.892, p<0.05), anaerobic peak power (r=0.698, p<0.05), anaerobic average leg power (r=0.662, p<0.05) showed a positive correlation. Looking at the correlations in the standing high jump, anaerobic peak power (r=0.663, p<0.05), anaerobic average power (r=0.697, p<0.05) showed a positive correlation. Looking at the correlation in the anaerobic peak power, average power (r=0.785, p<0.05) showed a positive correlation. Conclusions: This study shows that balance ability and anaerobic leg strength are independent of each other. The results of this study can be used as basic data for the training plan of high school taekwondo players in the future.

전력 HILs를 활용한 스마트 인버터의 LVRT 시험 (Low Voltage Ride Through Test for Smart Inverter in Power Hardware in Loop System)

  • Sim, Junbo
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권1호
    • /
    • pp.101-105
    • /
    • 2021
  • Encouragement of DER from Korean government with several policies boosts DER installation in power system. When the penetration of DER in the grid is getting high, loss of generation with break-away of DER by abnormal grid conditions should be considered, because loss of high generation causes abnormal low frequency and additional operations of protection system. Therefore, KEPCO where is Korean power utility is preparing improvement in regulations for DERs connected to the grid to support abnormal grid conditions such as low and high frequencies or voltages. This is called 'Ride Through' because the requirement is for DER to maintain grid connection during required periods when abnormal grid conditions occur. However, it is not easy to have a test for ride through capability in reality because emulation of abnormal grid conditions is not possible in real power system in operation. Also, it is not easy to have a study on grid effect when ride through capability fails with the same reason. PHILs (Power Hardware In the Loop System) makes it possible to analyze power system and hardware performance at once. Therefore, this paper introduces PHILs test methods and presents verification of ride through capability especially for low voltage grid conditions.

TTCN-3를 이용한 전력 IT Protocol Conformance Test 기법 (Conformance Test Technique for the Electric Power IT Protocol based on TTCN-3)

  • 송병권;장용기;정태의;김건웅;김진철;김영억
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.373-375
    • /
    • 2008
  • TTCN-3(Testing & Test Control Notation Version 3) defined in EISI(2001) are the standardized test specification and test implementation language of applicable for all kinds of black-box testing for reactive and distributed system, telecom systems, Mobile system, Internet, CORBA based system, java, XML, etc. This paper using the TTCN-3 on an Electric Power IT Protocol DLMS(Device Language Message Specification) standards for the implementation of the device equipment test the suitability of the protocol.

  • PDF

PQM 및 PQMS 성능검증을 위한 실증시험 (The field-test of Power Quality Meter and Power Management System in order to verify the performance)

  • 최선규;송일근;권태호;한재욱
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2005년도 춘계학술대회논문집
    • /
    • pp.235-239
    • /
    • 2005
  • This paper gives a field-test method and result of PQM(Power Quality Meter) and PQMS(Power Quality Management System). The field-test was carried out as our own method. So, the test method has several kinds of improvement in this paper because it is first time to try the field-test of the equipment. However, we expect that the test result of PQM & PQMS has been used as a reference data which makes a scheme of evaluating performance of the equipment that has been used or is developed.

  • PDF