• 제목/요약/키워드: maintenance schedule

검색결과 162건 처리시간 0.022초

예방(예지) 정비의 필요성 (Not Preventive Maintenance, But Predictive Maintenance)

  • 전형식
    • 소음진동
    • /
    • 제4권4호
    • /
    • pp.459-467
    • /
    • 1994
  • Various maintenance programs and techniques have been implemented for roating machineries, since machines were invented for commerical use. The earliest type of maintenance was run-to-failure, where the machine was run until a fault caused to fail in service. It was obviously an expensive approach due to the unpredictability of the machine condition. Another type is the periodic maintenance, where machines are disassembled and overhauled on regular schedules. With the advent of reliable data collectors including FFT analyzer and developing of versatile supporting software such as ExpertALERT system, the predictive maintenance is known to be the most feasible maintenance type these days. The vibration analysis enables for a maintenance crew to find the exact cause of fault on a machine and to make a proper maintenance schedule with a trend analysis. The predicitive maintenance is considered to be the most important part of pro-active maintenance.

  • PDF

Evaluating Schedule Uncertainty in Unit-Based Repetitive Building Projects

  • Okmen, Onder
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권2호
    • /
    • pp.21-34
    • /
    • 2013
  • Various risk factors affect construction projects. Due to the uncertainties created by risk factors, actual activity durations frequently deviate from the estimated durations in either favorable or adverse direction. For this reason, evaluation of schedule uncertainty is required to make decisions accurately when managing construction projects. In this regard, this paper presents a new computer simulation model - the Repetitive Schedule Risk Analysis Model (RSRAM) - to evaluate unit-based repetitive building project schedules under uncertainty when activity durations and risk factors are correlated. The proposed model utilizes Monte Carlo Simulation and a Critical Path Method based repetitive scheduling procedure. This new procedure concurrently provides the utilization of resources without interruption and the maintenance of network logic through successive units. Furthermore, it enables assigning variable production rates to the activities from one unit to another and any kind of relationship type with or without lag time. Details of the model are described and an example application is presented. The findings show that the model produces realistic results regarding the extent of uncertainty inherent in the schedule.

ILOG를 이용한 항공기 운항 일정계획 시스템 개발에 관한 연구 (A Study on Development of the Aircraft Scheduling System Using ILOG)

  • 윤종준;이장춘;이화기
    • 산업경영시스템학회지
    • /
    • 제24권65호
    • /
    • pp.89-102
    • /
    • 2001
  • In this paper, the aircraft route scheduling consists of two steps; the pairing generation and the aircraft assignment. The pairing generation is heuristic approach how flights construct pairings from and to the main base. The aircraft resource assignment which is to establish a aircraft route schedule is constructed by constraint satisfaction problem technique. ILOG solver and schedule is used to solve this problem. In addition, a aircraft route reschedule process against departure-arrival delay or aircraft maintenance schedule change is added by partial constraints satisfaction problem technique. Also, Gantt chart made by ILOG views is used to show aircraft route schedule results more easily.

  • PDF

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

수리일정계획(修理日程計劃)과 보수반원(補修班圓)크기의 동시적(同時的) 결정(決定)에 관한 연구(硏究) (On the Simultanously Determining the Schedule and Crew Size for Optimal Preventive Maintence)

  • 김길동;조암;이진규
    • 품질경영학회지
    • /
    • 제15권1호
    • /
    • pp.76-81
    • /
    • 1987
  • Past treatment of the single machine maintenance problem has shown that preventive maintenance may be desirable for equipment for which failures are caused at least partially by wear-out factors. In all previous treatment, however, the size of the maintenance-repair crew has been held constant and the optimal maintenance period has then been determined. This paper suggests a simultaneous solution for the maintenance-repair crew size and the optimal maintenance period. The optimal maintenance period is seen to shift as the size of the maintenance-repair crew varies.

  • PDF

Optimal Schedules of Periodic Preventive Maintenance Model with Different PM Effect

  • Lim, Jae-Hak
    • International Journal of Reliability and Applications
    • /
    • 제9권1호
    • /
    • pp.113-122
    • /
    • 2008
  • In this paper, we consider a periodic preventive maintenance policy in which each preventive maintenance reduces the hazard rate of amount proportional to the failure intensity, which increases since the system started to operate. And the effect of preventive maintenance at each preventive maintenance epoch is different. The expected cost rate per unit time for the proposed model is obtained. We discuss the optimal number N of the periodic preventive maintenance and the optimal period x, which minimize the expected cost rate per unit time and obtain the optimal preventive maintenance schedule for given cost structures of the model. A numerical example is given for the purpose of illustrating our results when the failure time distribution is Weibull distribution.

  • PDF

교대근무 항공정비사의 피로관리 연구 (A Study on Fatigue Management of Aviation Maintenance Mechanics-Focusing on Shift Workers)

  • 김천용;최세종
    • 항공우주의학회지
    • /
    • 제30권2호
    • /
    • pp.61-65
    • /
    • 2020
  • In the case of aviation maintenance work, several kinds of shift works are performed during day and night, and a lot of works are performed on the ramp due to the characteristics of the aircraft flight schedule. Maintenance workers are often exposed to the sun or in cold temperatures for aircraft maintenance works. The fatigue risk of the maintenance workers will be weighted. In particular, the work at night shift under normal biological rhythms can make maintenance workers feel sleepy during daytime work. It can also affect the safety of aircraft and individual workers. Accordingly, this study will consider fatigue-related previous researches in the field of aviation maintenance, review the effects of shift work, and how fatigue affects aviation mechanics during the day/night shifts. Considering these factors, we tried to present a plan that can minimize the fatigue of aviation workers through this study.

작업분류체계(WBS)를 이용한 안전해체공사 시스템 개발에 관한 연구 (A Study on the Development of Safety Demolition Work System by using Work Breakdown Structure)

  • 김광서;양극영;이용수;윤여완;김천학
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제2권3호
    • /
    • pp.176-187
    • /
    • 1998
  • The Dismantlement and Construction of the buildings have the characteristic of floating change with repetition within a Time Schedule which has fixed resources, that is, Manpower, Materials and Equipments, and involve many disaster factors in performing each processes. But as these factors are variable, a work supervisor should be able to understand data analysed distinctive factors of each activities systematically, organizationally, and scientifically, and diagrammatic information media so that he can control any complex and situation beyond forecast. Thus this study is intended to be a barometer of weighing if the existing process schedule has taken security into consideration by making the characteristics of organization and action of Work package per process in a building field with more factors like these into a network system and is intended to minimize construction disasters by systematizing this into a Transformational Network.

  • PDF

사회적 총비용을 고려한 발전기 장기 보수계획수립에 관한 연구 (Multi-Year Maintenance Scheduling of Generators with Considering Total Cost)

  • 차준민;송길영;김용하
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.701-703
    • /
    • 1996
  • Maintenance scheduling plays an important role in evaluating the supply reliability of power systems. Since generating units must be maintained and inspected, the generation planner must schedule planned outages during the year. Several factors entering into this scheduling analysis include: seasonal load-demand profile, amount of maintenance to bo done on all generating units, size of the units, elapsed time from last maintenance, and availability of maintenance crews. This paper proposes a new algorithm to decide the multi-year maintenance scheduling with considering the total cost. We adjust the maintenance scheduling to levelize the reliability over all period. The proposed algorithm is applied to a real size power system and the developed reliability results are obtained.

  • PDF

컨테이너 크레인의 예방정비 일정에 관한 연구 (A Study on Preventive Maintenance of Container Cranes)

  • 윤원영;손범신;최용석
    • 한국항해항만학회지
    • /
    • 제33권6호
    • /
    • pp.429-436
    • /
    • 2009
  • 컨테이너터미널에서 사용되는 컨테이너 크레인은 컨테이너 선박의 컨테이너를 양적하하는 주요 장비이다. 크레인이 고장이 나면, 컨테이너터미널의 생산성을 감소시킬 것이다. 본 논문은 컨테이너 크레인에 대한 예방정비 일정을 다룬다. 컨테이너 크레인은 많은 부품으로 구성되고 3개의 모델을 사용하여 컨테이너 크레인의 구조를 분석한다. 그리고 최적의 예방정비 일정을 결정하기 위하여 유전자 알고리즘을 적용하고 시뮬레이션 시스템을 통해서 제안된 방법의 성능을 평가한다. 마지막으로 작업일정에 기초하여 산업체에서 발견된 예방정비 일정을 조정하는 방법을 설명한다.