• Title/Summary/Keyword: long-term repair program

Search Result 11, Processing Time 0.021 seconds

Establishment of the Repair Cycle of the Components of the Apartment Housing

  • Lee, KangHee;Ahn, YongHan;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.14 no.2
    • /
    • pp.69-75
    • /
    • 2014
  • Building has been deteriorated over the year after construction. The deterioration has caused to hinder the living condition and to decrease the building value. Thus, it is important to prevent or delay the building deterioration as well as to proceed the maintenance. The long-term repair program for the apartment in Korea plays a key role to make the repair plan after construction and to assure the function decent. This is not flexible to the change of the material and component because the program is provided by the Korean-law. Many items are omitted in the long-term program so that the maintenance experts face many difficulties to make a repair plan. In this paper, it aimed at providing the repair cycle and repair ratio according to the repair scope, which are not provided in the current program. This study shows that the repair ratio is presented with quartile range in 25%, 50%, 75% and 100%. This has an advantage to take an overall look in repair items. Under this presentation of the repair ratio, each item has a unique repair value. Second, the repair scope is divided into partly repair, fully repair, partly alteration and fully alteration. If a fully repair has a repair ratio close to 100%, it would mean that a fully repair is a fully alteration. Third, the short repair cycle means that it requires to maintain the function or performance of the components in a short term.

Determining Major Items of Scheduled Maintenance for Apartment through Case Data: Focused on Improving the Establishment Standard for Long-term Repair Program (사례 데이터 분석을 통한 공동주택 계획수선 주요 항목 도출: 법령 상의 장기수선계획 수립기준 현실화를 중심으로)

  • Song, Sanghoon;Lee, Seok-Je;Park, Seong-Sik
    • Land and Housing Review
    • /
    • v.7 no.1
    • /
    • pp.43-51
    • /
    • 2016
  • The long-term repair program is significant as the execution standard for apartment in repair construction, and provides the basis for effective facility management through appropriation reserve and preventive maintenance. Considering its importance, the government legislates the items, cycle, and ratio for long-term repair. However, the frequent changes, controversies on repair, and difficulties in using appropriation reserve are caused as the items have not been revised on time reflecting up-to-date construction technologies. In order to resolve these problems, it is required to improve the standard by evaluating the appropriateness of repair items throughout the analysis of actual conditions. This study aims to suggest the revision plan for the criteria with the major items based on the status identified by the actual long-term repair programs and historical repair construction data. To do this, the adoption ratios of items to program are reviewed by collecting the real cases of the long-term repair programs. Developing improvement plan was approached in two ways such as "exclusion method" deleting minimum unnecessary items and "selection method" sorting out items with high adoption ratio and evidence of repair in a positive manner. Aa a result, the major items were identified as 118 items and 73 items by exclusion method and selection method respectively from the current 147 items. The outcomes of this study are expected to contribute enhancing the practicality of the standard in that the regulation for long-term repair program should periodically reflect the status of currently applied construction methods and materials.

Identification of Core Items for Repair Works of Apartment Housing by Evaluating Necessity of Repair Work and Buren of Repair Cost (수선필요도와 비용부담도 평가를 통한 공동주택 수선공사 핵심항목 도출방안)

  • Song, Sanghoon;Lee, Seok-Je;Park, Seong-Sik
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.79-86
    • /
    • 2016
  • Purpose: Frequently, the apartment management offices have difficulties in effective repair works due to their insufficient technological capability to operate long-term repair program. There also have been many cases of failure in executing urgent repairs mainly because the repair allowance has not accumulated enough for the repair works on time. This study aimed to determine core items in apartment maintenance in order to reduce the confusion and unnecessary efforts for the management office by suggesting simple list of repair items. Method: Core items are defined using several indicators. The degrees of necessity for repair work(NRW) are calculated combining the impacts to living, safety, and aesthetics. Then the degrees of burden of repair cost(BRC) are estimated by analyzing actual long-term repair program of three apartment complexes. Lastly the degrees of accumulation demand for repair allowance(AD) are calculated with NRW and BRC. Result: The core items and essential items are suggested for three apartment types as case studies based on the indicators of NRW, BRC, and AD. Then, the required accumulated allowance per $m^2$ was calculated to effectively implement repair works.

The Forecasting Model of the Repair Cost in Apartment Housing - Focused roof water proofing and Elevator work - (공동주택 공종별 수선비용 예측모델 연구 - 옥상방수 공사와 승강기 공사를 중심으로 -)

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.63-68
    • /
    • 2015
  • Purpose: Most if buildings need various repair works for preventing or delaying the deterioration which gives rise to affect the living condition or function after constructed. Therefore, a long-term repair schedule should be planned and a repair cost is required. In this paper, it aimed at providing the statistical forecast model for a repair cost in roof water-proofing work and elevator work using statistical approach with three variables such as number of household, management area and a elapsed year. Data are collected in apartment housings which are located in Seoul area and conducted with interview and questionnaire sheet. Each analyzed work is divided into a partly work and fully work. Results of this study are shown that, first, the regression model takes a multiplying type like a Cobb-Douglas function and is changed into the log-linear type to include the three variable simultaneously. Second, the goodness-of-fit of the repair cost forecasting model has a good statistics in determinant's coefficient and Dubin-Watson value. Third, the management area is stronger factor than other the number of household and an elapsed year in roof water-proofing work and elevator work.

Successful management of absent sternum in an infant using porcine acellular dermal matrix

  • Semlacher, Roy Alfred;Nuri, Muhammand A.K.
    • Archives of Plastic Surgery
    • /
    • v.46 no.5
    • /
    • pp.470-474
    • /
    • 2019
  • Congenital absent sternum is a rare birth defect that requires early intervention for optimal long-term outcomes. Descriptions of the repair of absent sternum are limited to case reports, and no preferred method for management has been described. Herein, we describe the use of porcine acellular dermal matrix to reconstruct the sternum of an infant with sternal infection following attempted repair using synthetic mesh. The patient was a full-term male with trisomy 21, agenesis of corpus callosum, ventricular septal defect, patent ductus arteriosus, right-sided aortic arch, and congenital absence of sternum with no sternal bars. Following removal of the infected synthetic mesh, negative pressure wound therapy with instillation was used to manage the open wound and provide direct antibiotic therapy. When blood C-reactive protein levels declined to ${\leq}2mg/L$, the sternum was reconstructed using porcine acellular dermal matrix. At 21 months postoperative, the patient demonstrated no respiratory issues. Physical examination and computed tomography imaging identified good approximation of the clavicular heads and sternal cleft and forward curvature of the ribs. This case illustrates the benefits of negative pressure wound therapy and acellular dermal matrix for the reconstruction of absent sternum in the context of infected sternal surgical site previously repaired with synthetic mesh.

Material degradation and its management of reactor internals in PWR (원자로 내부구조물 재료열화이력 및 관리방안)

  • Hwnag, Seong Sik;Kim, Sung Woo;Kim, Dong Jin;Choi, Min Jae;Lim, Yun Soo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.12 no.1
    • /
    • pp.1-10
    • /
    • 2016
  • The number of nuclear power plants operating in Korea was 24 as of year 2015. Nine units out of 24 units have been operated for a period over 20 years. Kori unit 1 has been in operation for 40 years, and an extended operation for Wolsong unit 1 was decided in 2015. There has been reported some crackings in reactor internals in PWR have been reported in Europe, USA, Japan and Korea, and some of them were replaced with new one. Repair and replacement technologies for the reactor internals have been developing in order to meet the regulatory requirements for long term operation in Korea. The technologies will also be used for the exported nuclear units. It is required to review degradation history of the reactor internals worldwide as a part of the degradation management program development. Schematics of reactor internals designed and supplied by Westinghouse, Framatome and Combustion Engineering are described herein. Materials degradation history of reactor internals of PWR plants in USA, Japan and Europe is surveyed and summarized. Some events from Korean plants are also described. Aging management strategy for the internals is suggested.

Damage-based stress-strain model of RC cylinders wrapped with CFRP composites

  • Mesbah, Habib-Abdelhak;Benzaid, Riad
    • Advances in concrete construction
    • /
    • v.5 no.5
    • /
    • pp.539-561
    • /
    • 2017
  • In this study, the effects of initial damage of concrete columns on the post-repair performance of reinforced concrete (RC) columns strengthened with carbon-fiber-reinforced polymer (CFRP) composite are investigated experimentally. Four kinds of compression-damaged RC cylinders were reinforced using external CFRP composite wraps, and the stress-strain behavior of the composite/concrete system was investigated. These concrete cylinders were compressed to four pre-damaged states including low -level, medium -level, high -level and total damage states. The percentages of the stress levels of pre-damage were, respectively, 40, 60, 80, and 100% of that of the control RC cylinder. These damaged concrete cylinders simulate bridge piers or building columns subjected to different magnitudes of stress, or at various stages in long-term behavior. Experimental data, as well as a stress-strain model proposed for the behavior of damaged and undamaged concrete strengthened by external CFRP composite sheets are presented. The experimental data shows that external confinement of concrete by CFRP composite wrap significantly improves both compressive strength and ductility of concrete, though the improvement is inversely proportional to the initial degree of damage to the concrete. The failure modes of the composite/damaged concrete systems were examined to evaluate the benefit of this reinforcing methodology. Results predicted by the model showed very good agreement with those of the current experimental program.

Thermal Stability Test Evaluation of Applying the Artificial-Crack of Water-Leakage Repair Materials Used in the Maintenance of Concrete Structure (콘크리트 구조물의 유지보수에 사용되는 누수보수재료의 인공 균열을 이용한 온도 안정성 시험평가)

  • Kim, Soo-Youn;Kim, Byoung-ll;Oh, Sang-Keun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.3
    • /
    • pp.322-329
    • /
    • 2016
  • This study is about the method to control the quality of material used to repair leakage and crack of concrete structure and suggests the "Temperature Stability Test Method" as a follow-up study. In the result of performance evaluation for 45 samples of 15 types in 5 series, the temperature stability test showed different material changes including rolling down, volume change, and color change as they are frozen and melt repeatedly in the somewhat extreme conditions at low($-20^{\circ}C$) and high($60^{\circ}C$) temperatures, where 13 samples (approx. 29%) and 32 samples (approx. 71%) showed leakage, respectively, in the permeability test to evaluate leakage. This result shows the enough importance of setting the quality control criteria of leakage repair material currently used to maintain concrete structures considering the temperature conditions, and proves the applicability of the Temperature Stability Test Method as a standard test method to ensure long-term durability of concrete structure.

Field Performance Evaluation of Preventive Maintenance Methods (예방적 유지보수 공법의 현장 적용성능 평가 연구)

  • Lee, Sang Yum
    • International Journal of Highway Engineering
    • /
    • v.19 no.2
    • /
    • pp.103-112
    • /
    • 2017
  • PURPOSES : In this study, field performance evaluation of crack treatment of pavement and the feasibility of surface treatment of pavement are presented. The performance and cost of preventive maintenance methods have been previously verified, and the methods are being used in many developed countries and cities. However, the performance and cost of the system have not been verified in domestic, field applications. Therefore, in order to improve performance, the field performance is evaluated, and a reasonable cost is proposed. METHODS : Visual Inspection was conducted to evaluate the field application and performance of the preventive maintenance method. In addition, the PCI index was calculated from the results of visual inspection of the application area of the surface treatment method, and the performance life of each method was predicted. For the economic evaluation, life cycle cost analysis was performed using the life cycle cost analysis program. RESULTS :In order to evaluate and quantify the field performance of crack repair material, the residue condition of the pavement surface after crack treatment, rather than the performance of the material, is evaluated. In addition, the crack resistance and performance life of surface treatment methods are evaluated. The cost of currently available treatment methods are compared to the common pavement cut and overlay method, and it is determined that the preventive method is not economical based on life cycle cost analysis. CONCLUSIONS :Because of the characteristics of cracking, it is necessary to conduct the evaluation of currently applied methods and the analysis of the cause of damage, by visual inspection. Moreover, in order to evaluate the performance and economic suitability of the currently applied surface treatment methods, it is necessary to acquire information on application sections by monitoring their long-term conditions and performance.

Wolsong Unit 1 Steam Generator Aging Management for Continued Operation (월성 1호기 계속운전을 위한 증기발생기 열화관리)

  • Song, Myung Ho;Kim, Hong Key;Lee, Jung Min
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.6 no.2
    • /
    • pp.28-33
    • /
    • 2010
  • As a part of license renewal for the continued operation of Wolsong unit 1, the periodic safety review report was submitted near the end of design lifetime, 2012, and now is under reviewing. Major components of primary system such as pressure tubes, feeder pipes and so on are being replaced and many components of secondary system are also being repaired. So the license renewal of Wolsong unit 1 is expected to be acquired without significant issues. But on the other hand, steam generators of Wolsong unit 1 had the good performance and therefore the replacement and repair for the steam generator are not needed. Recently it is reported that some cracks were detected in a few of european steam generator with Alloy 800 tubes and the cause of cracks was the outer diameter stress corrosion cracking(ODSCC) due to the concentration of chemical impurities on the outer surface of tube. Accordingly the overall review on this issue was performed. The long-term operation is likely to results to form the concentration mechanism for the tube corrosion as the sludge build-up in the secondary side of steam generator and the crack in the crevice between tube and tube-sheet and expansion transitions is apt to be occurred. In this paper, the history of steam generator inspection and operation of Wolsong unit 1 are reviewed and the reliability of steam generator tube is evaluated and the steam generator aging management program for Wolsong unit 1 is introduced.

  • PDF