Wolsong Unit 1 Steam Generator Aging Management for Continued Operation

월성 1호기 계속운전을 위한 증기발생기 열화관리

  • Published : 2010.12.01

Abstract

As a part of license renewal for the continued operation of Wolsong unit 1, the periodic safety review report was submitted near the end of design lifetime, 2012, and now is under reviewing. Major components of primary system such as pressure tubes, feeder pipes and so on are being replaced and many components of secondary system are also being repaired. So the license renewal of Wolsong unit 1 is expected to be acquired without significant issues. But on the other hand, steam generators of Wolsong unit 1 had the good performance and therefore the replacement and repair for the steam generator are not needed. Recently it is reported that some cracks were detected in a few of european steam generator with Alloy 800 tubes and the cause of cracks was the outer diameter stress corrosion cracking(ODSCC) due to the concentration of chemical impurities on the outer surface of tube. Accordingly the overall review on this issue was performed. The long-term operation is likely to results to form the concentration mechanism for the tube corrosion as the sludge build-up in the secondary side of steam generator and the crack in the crevice between tube and tube-sheet and expansion transitions is apt to be occurred. In this paper, the history of steam generator inspection and operation of Wolsong unit 1 are reviewed and the reliability of steam generator tube is evaluated and the steam generator aging management program for Wolsong unit 1 is introduced.

Keywords