• 제목/요약/키워드: line contact

검색결과 841건 처리시간 0.031초

전차선로 동적특성에 따른 설치상태 분석 (Analysis on Installation Condition According to Dynamic Characteristics for Overhead Catenary System)

  • 박영;이기원
    • 전기학회논문지
    • /
    • 제65권9호
    • /
    • pp.1605-1609
    • /
    • 2016
  • The measurement of current collection performance between pantograph and contact wire of overhead catenary system is intended to prove the safety of operation and the quality of the current collection system. The results of interaction performance of current collection system are required for approving with commercial operation on railway lines. The methods of interaction performance of current collection system are defined on interactional standards such as IEC 62486 and EN 50317. In this paper, the interaction performance is evaluated by the percentage of arcing on Honam high-speed line and the results are used for adjustment of the overhead catenary line structure. The experimental results in Honam high-speed line confirm that the duration of an arc lasting longer 25 ms between pantograph and contact wire was depended on the conditions of overhead contact line after installation.

선로조건 및 운전패턴에 따른 한국형 고속열차 판토그라프의 접촉력 특성 분석 (Analysis of contact force of pantograph for Korean-high speed train according to track conditions and driving patterns)

  • 목진용;김영국;이희성
    • 센서학회지
    • /
    • 제14권6호
    • /
    • pp.438-443
    • /
    • 2005
  • In this paper, we introduce the on-line test of the current collection characteristics for HSR 350x(Korea High Speed Train project) that have been performed in the Kyoung-bu high-speed line since 2002. Through the analysis of measured data during on-line test, the variation trends of contact force between pantograph and catenary according to the track conditions and driving patterns are reviewed. This study shows that the track conditions do not affect on the dynamic performance between pantograph and the driving patterns are important factors in determining the good interaction of them.

모드중첩법을 이용한 고속용 팬터그래프와 전차선의 동적 상호작용 시뮬레이션 (Dynamic Simulation for High-speed Pantograph and Overhead-line using a Vibration Mode Superposition Method)

  • 조용현;이기원;박현준
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2004년도 추계학술대회논문집
    • /
    • pp.494-497
    • /
    • 2004
  • A dynamic simulation for a high-speed pantograph-overheadline has been performed using mode superposition method to predict contact forces between pantograph and overheadline. We can deal with non-linear dampers of the pantograph and pre-sag of overhead-line for the simulation. But, we can not consider slackness of dropper in the overhead-line. According to the simulation results, the contact forces and displacements are reasonably predicted, compared with other foreign simulation results.

  • PDF

고속전철 기술개발사업 본선 시운전 집전시험계획 (A Current Collection Performance On-line Test Plan in Korea High Speed Train Development Project)

  • 조용현;최강윤;백광선
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.156-162
    • /
    • 2001
  • Current collection performance on-line tests for a Korean High Speed Train being developed in G7 project is scheduled to start in June, 2002. In this paper, preparatory efforts for measuring contact forces which is regarded as one of major measuring items in the test are introduced. Specifically speaking, review of frequencies related with contact force fluctuations, brief of contact force measuring algorithm, review of measuring instrument specifications and development of a data acquisition program are presented.

  • PDF

베인 선단부의 탄성유체윤활 (Elastohydrodynamic Lubrication on the Vane Tip of Vane Pump)

  • 정석훈;정재연
    • Tribology and Lubricants
    • /
    • 제10권3호
    • /
    • pp.54-61
    • /
    • 1994
  • The regimes of elastohydrodynamic lubrication at the points where line contacts occur between the vane tip and camring in an oil hydraulic vane pump is studied. A study of the contact conditions in vane pump provided most of the early interest in the possibility of fluid film lubrication in highly loaded contacts. The variation of viscosity with pressure and the elastic deformation associated with the high pressures generated in the contact region are the major causes of the complexity attributed to lubrication behavior. Therefore a numerical solutions to the problem of elastohydrodynamic lubrication of line contact are obtained by using a finite-difference formulation.

수서고속철도 전차선로의 설치조건의 따른 집전상태 분석 (Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line)

  • 나경민;박영;이기원;조용현;권삼영;박철민
    • 전기학회논문지
    • /
    • 제66권4호
    • /
    • pp.727-732
    • /
    • 2017
  • This paper describes the dynamic characteristics depending on installation condition between a pantograph and an OCL (Overhead Contact Line) on a new high speed line in Korea. The current collection performance between the pantograph and the OCL was tested during train operation from Suseo to Jije stations. The current collection performance is evaluated based on the duration of an arc by using an arcing measurement system. The system consists of an optical sensor for measuring the duration of an arc and a camera for monitoring current collection performance. An arcing duration is defined as a percentage of arcing in international standards. This test aims to analyze the locations of repetitive arcing depending on installation conditions of OCLs on a new high speed line in order to use the result as reference data for correct construction and maintenance.

경부고속열차의 기존선 주행시 차륜마멸특성에 관한 연구 (A Study on the Wheel Wear of High Speed Train Running on the Conventional Line)

  • 강부병;이희성
    • Tribology and Lubricants
    • /
    • 제19권4호
    • /
    • pp.187-194
    • /
    • 2003
  • This paper describes the characteristics of wheel wear of high speed train running on the conventional line. Conventional line has many curved tracks that cause severe wheel flange wear. The influences of lubrication, cant deficiency, curve radius on wheel wear are also described considering the operation performance of the highspeed trainset. A method of calculation using contact patch work model is presented for determination of the evolution by wear of railway wheels.

기존선 교류전기철도 절연구분장치에서의 속도향상 기술 (Technique for the Speed Up of Neutral Section on the Convention Line Catenary System)

  • 창상훈;이기원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.294-301
    • /
    • 2008
  • At the neutral sections, There are neutral sections inserted in overhead contact line between the substations to divide different phase current sections of AC electrified lines. Except convention line, a large stress occurs in the contact wire near the fittings under passing pantographs. So, in order to raise the train speed over 150km/h, a new type section has been adopted.

  • PDF

선로변 전차선과 조가선의 전류를 이용한 집전성능 분석 기술 (Analysis of Current Collection Performance using Real-time Measurement of Current for Overhead Contact Line on the Track-side)

  • 박영;신승권;이기원;김재문;김원하
    • 전기학회논문지
    • /
    • 제62권4호
    • /
    • pp.573-576
    • /
    • 2013
  • In this paper, analysis method for current collection performance based on real-time current of catenary system is proposed. An innovative method based on track-side of railway system is used for measurement of currents for overhead contact line during the collection with pantograph. The evaluation of a qualitative ratio for current collection performance were conducted using proposed algorithm under various conditions such as laboratory and track-side. To check the validity of our approach, we compared between calculation results from current of contact wire and measurement results from arcing of pantograph using simulator in laboratory conditions. The results show that the behavior of current collection performance were analysis from currents of overhead contact line in AC electric railway system.