• Title/Summary/Keyword: dismantling

Search Result 396, Processing Time 0.037 seconds

A Study on the Impact of Participating Companies Related to Asbestos Dismantling on the Safety of Residents Near Asbestos Dismantling Worksites (석면해체 참여업체가 작업장 인근 주민 안전에 미치는 영향에 관한 연구)

  • Youm, Hie Sang;Park, Jong Young;Lee, Duck Hee
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.3
    • /
    • pp.579-588
    • /
    • 2021
  • Purpose: The purpose of this study is to analyze how the participating companies related to asbestos dismantling affect the safety of residents near asbestos dismantling worksites, and to present important criteria for selecting asbestos dismantling related companies based on the analysis results. Method: In this study, based on the Occupational Safety and Health Act and the Asbestos Safety Management Act, important items about participating companies related to asbestos dismantling and the safety of residents near the asbestos dismantling workshop were derived, and then questionnaire items were determined through FGI. Multiple regression analysis was performed to analyze the influence relationship. Result: In order to secure the safety around the asbestos dismantling site, it was confirmed that the ability of asbestos dismantling supervisors among the participating companies (dismantling companies, investigation agencies, and supervisors) had the greatest influence. Conclusion: It showed that it is essential to select an excellent asbestos dismantling supervisor and an excellent asbestos dismantling and removal company in order to ensure the safety of residents near the asbestos dismantling site.

Technical preparedness in Southeast Asia region for onshore dismantling of offshore structures: Gaps and opportunities

  • Jing-Shuo Leow;Jing-Shun Leow;Hooi-Siang Kang;Omar Yaakob;Wonsiri Punurai;Sari Amelia;Huyen Thi Le
    • Ocean Systems Engineering
    • /
    • v.13 no.1
    • /
    • pp.79-95
    • /
    • 2023
  • An onshore dismantling yard is an important part in the supply chain of the offshore oil and gas decommissioning industry. However, despite having more than 500 offshore structures to be decommissioned in the Southeast Asia region, there are a very limited number of well-equipped dismantling yards to fully execute the onshore dismantling. Recent investigations discovered that shipbuilding and offshore structure fabrication yards are still potential options for upgrades to include dismantling. Despite the huge potential opportunities from upgrading to dismantling, research studies on this area are relatively scarce, and most past studies mainly focused on the North Sea region. To date, the potential opportunities of Southeast Asia and Malaysia yards to develop onshore dismantling capability are still unclear. The aim of this study is to identify the criteria to develop a technical preparedness checklist to evaluate an onshore dismantling yard; consequently, this will assist with assessing and bridging the gaps and identify the opportunity of developing an onshore dismantling yard in Southeast Asia region. Requirements for onshore dismantling and related rules and regulations have been investigated and summarized in the form of checklist. Findings from this study can help local oil and gas operators to pursue more local solutions and resilient supply chain performance.

A Study on the Analysis of Environmental Hazards when Dismantling Non-Structure of Old Residential Buildings (노후 주거용 건축물 비구조체 해체 시 환경유해인자 분석)

  • Son, Byeung-Hun
    • Journal of Urban Science
    • /
    • v.10 no.1
    • /
    • pp.29-37
    • /
    • 2021
  • The number of old buildings older than 30 years in Korea continues to increase from 29.9% in 2005 to 38.8% in 2020. Considering the growing urban regeneration projects, urban maintenance projects, the suppression of urban expansion, and the lack of idle land in the city, the dismantling of old buildings is expected to increase further in the future. As major accidents at building dismantling sites continue to occur, related agencies are also strengthening safety management of building dismantling works. While physical safety management such as collapse and fall is strengthened, there is a relative lack of interest in the health of workers at dismantling sites due to environmental hazards. Since relevant laws stipulate that construction waste should be separated and discharged, old buildings need to be considered for environmental hazards such as fine dust, floating bacteria, and floating molds when dismantling. In this study, we intend to find important safety management elements in the management of building dismantling sites, measure environmental factors harmful to dismantling workers, and present basic data for the management of dismantling sites in the future. "Safety management" was the highest priority, followed by "dust," "vibration," "noise," "bacteria," and "smell." The perception of the importance of "physical damage prevention" with workers working on dismantling and managers managing the site came out similar, but the perception of "work efficiency" and "health disorder prevention" through environmental hazard management showed different priorities. In the process of dismantling, floating bacteria and floating mold were collected, cultured, and measured the concentration in the indoor air. The measurement was measured by dividing it into pre-dismantling and during dismantling.

A Study on Estimation of Radiation Exposure Dose During Dismantling of RCS Piping in Decommissioning Nuclear Power Plant

  • Lee, Taewoong;Jo, Seongmin;Park, Sunkyu;Kim, Nakjeom;Kim, Kichul;Park, Seongjun;Yoon, Changyeon
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.19 no.2
    • /
    • pp.243-253
    • /
    • 2021
  • In the dismantling process of a reactor coolant system (RCS) piping, a radiation protection plan should be established to minimize the radiation exposure doses of dismantling workers. Hence, it is necessary to estimate the individual effective dose in the RCS piping dismantling process when decommissioning a nuclear power plant. In this study, the radiation exposure doses of the dismantling workers at different positions was estimated using the MicroShield dose assessment program based on the NUREG/CR-1595 report. The individual effective dose, which is the sum of the effective dose to each tissue considering the working time, was used to estimate the radiation exposure dose. The estimations of the simulation results for all RCS piping dismantling tasks satisfied the dose limits prescribed by the ICRP-60 report. In dismantling the RCS piping of the Kori-1 or Wolsong-1 units in South Korea, the estimation and reduction method for the radiation exposure dose, and the simulated results of this study can be used to implement the radiation safety for optimal dismantling by providing information on the radiation exposure doses of the dismantling workers.

A Study on the Measurement of Total Airborne Bacteria in the Process of Dismantling the Non-structure of Old Building (노후건축물 비구조체 해체과정에서의 총부유세균 발생량측정에 관한 연구)

  • Son, Byeung-Hun;Kang, Kyung-Ha;Lee, Ji-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.313-314
    • /
    • 2021
  • An old building over 30 years old continue to increase. Therefore, there will be more dismantling of old buildings in the future. Safety management of dismantling works is being strengthened. However, no consideration has been given to the effects of dismantling workers and their residents due to environmental hazards arising from the demolition process. Only spray and dust prevention measures are subject to inspection to minimize dust generation considering civil complaints around the site of dismantling work. In this paper, residential buildings, which account for the largest proportion of old buildings, were collected and identify total airborne bacteria and floating fungi among environmental hazards caused by non-structural dismantling work. Measurement results showed that workers during dismantling work are working in places with 4.8 times more total airborne bacteria than indoor air quality maintenance standards. Related research is needed for the health of dismantling workers.

  • PDF

Analysis of dismantling process and disposal cost of waste RVCH

  • Younkyu Kim;Sunkyu Park ;TaeWon Seo
    • Nuclear Engineering and Technology
    • /
    • v.55 no.1
    • /
    • pp.45-51
    • /
    • 2023
  • During the operation of a nuclear power plant (NPP), the waste reactor vessel closure head (RVCH) that is replaced owing to design or manufacturing defects is buried in a designated area or temporarily stored in a radiation shielding facility within the NPP. In such cases, storing it for extended periods proves a challenge owing to space constraints in the power plant and a safety risk associated with radiation exposure; therefore, dismantling it quickly and safely is crucial. However, not much research has been done on the dismantling of the RVCH in an operational power plant. This study proposes a dismantling process based on the radioactive contamination level measured for the Kori #1 RVCH, which is currently being discarded and stored, and examines the decontamination and cutting according to this process. In addition, the amount of secondary waste and dismantling cost are evaluated, and the dismantling effect of the reactor closure head is analyzed.

Interactive graphic simulation of research nuclear reactor dismantling process (연구용원자로 원격해체공정의 그래픽 전산모사)

  • 박영수;윤지섭;오원진;홍순혁
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.848-851
    • /
    • 1997
  • A graphic simulation program is developed to assimilate the remote dismantling process of research nuclear reactors. This program makes extensive use of a commercial robot graphic instruction program. Firstly, a realistic graphic model of research reactors are built along with various dismantling equipments. Using the graphic instruction languages provided by IGRIP, then, a graphic process simulation program is developed that operates interactively with the user. Consequently, it is made possible for a process designer to visualize an arbitrary dismantling sequence and interactively modify the process. It is expected that the developed system will be utilized as an effective operator aid in both design and execution phases of remote dismantling of research reactor.

  • PDF

3D Dynamic Simulation for the Dismantling Process of the KRR-2

  • Kim, Sung-Kyun;Jeong, Kawn-Seong;Lee, Kune-Woo;Park, Jin-Ho
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.02a
    • /
    • pp.114-129
    • /
    • 2004
  • The 3D simulations for the Rotary Specimen Rack (RSR), the shielding concret, and the reactor core dismantling processes in the Korea Research Reactor-1&2(KRR-1&2) were carried out in the present work. The four main dismantling items, which are the RSR, reactor core, beam tube, and the thermal column and the shield concrete, were selected among the many components in the KRR-2 by consideration of the activation, worker training, difficulty of the work and so on. On the basis of these, we built 3D CAD models, selected the proper dismantling technologies, and reviewed their dismantling processes. In this study, the 3D simulation results of the shielding concrete, and the reactor core dismantling processes are also presented and discussed.

  • PDF

Simulation Based Conceptual Design of ELV Dismantling System (시뮬레이션 기반 폐자동차 해체시스템의 개념설계)

  • 손영태;표정호;박면웅
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.890-894
    • /
    • 2003
  • This paper discuss basic functional construction and plant layout of a ELV dismantling system that can maximize the reusability of tarts and the recoverability of materials by dismantling ELV rationally and efficiently. "Island" type was selected for the system configuration considering processing amount, economical efficiency, and effectiveness. The system is supported by the information system, and composed of dismantling stations and handling equipments. The layout of the stations was determined after simulation and optimization using commercial software package, Arena and OptQuest. The objective of the optimization was maximum profit while the system capacity is considered as constraint. The environmental load of ELV can be minimized when the composition and function of each station are embodied in detail and the system is interfaced with shredding operation.

  • PDF

Dismantling of Components from Waste Printed Circuit Boards Using Stannic Chloride Solution (염화주석용액을 이용한 폐인쇄회로기판으로부터 부품의 분리)

  • Park, Yujin;Yoo, Kyoungkeun
    • Resources Recycling
    • /
    • v.30 no.2
    • /
    • pp.24-30
    • /
    • 2021
  • Dismantling tests were performed to separate components from waste printed circuit boards (PCBs) using HCl solution with Sn4+. Then, the effects of agitation speed, reaction temperature, initial Sn4+ concentration, and HCl concentration on the dismantling of components were investigated. No significant effect on the dismantling speed was observed upon changing the agitation speed from 100 to 300 rpm. However, the dismantling rate increased with increasing reaction temperature, Sn4+ concentration, and HCl concentration. In the all-component dismantling tests, when the dismantling ratio increased to 100%, no solder was observed on the boards, and the Sn4+ concentration was ~1,500 mg/L. The dismantling ratio of the components from the PCB increased to 100% within 2 h when 1 mol/L HCl solution with 10,000 mg/L Sn4+ was used at an agitation speed and temperature of 200 rpm and 90 ℃, respectively.