• Title/Summary/Keyword: crushing equipment

Search Result 17, Processing Time 0.023 seconds

Particle-Size Distribution Dependent upon Crushing Mechanism and Crushing Circuit (파쇄 메카니즘과 파쇄회로에 따른 입도분포)

  • Choi, Do-Young;Kim, Wan-Tae;Kim, Sang-Bae
    • Journal of the Mineralogical Society of Korea
    • /
    • v.23 no.4
    • /
    • pp.297-303
    • /
    • 2010
  • We report the particle-size distribution and comminution charactersitics of dolomite depending upon crushing equipment (hammer crusher and roll crusher) and crushing circuit (open and closed). The quantity of fine particles (< 100 mesh) produced by hammer crusher was 34 wt.% which is about three times that by roll crusher. The quantity of 14~25 mesh size fraction by roll crusher was 20 wt.% higher than that produced by hammer crusher. 80 wt.% of the crushing products by hammer crushing was under 35 mesh in size, while the particles produced by roll crushing were relatively coarse. The particle size of both the hammer and roll crushers decreased by employing closed crusing circuit in comparison to open circuit. Products of required particle-size were obtained effectively depending on appropriate crushing equipment and crushing circuit.

Rock Crushing and Gel Crushing of Ocean Traffic Facilities Foundation (해양교통시설기초 암반파쇄와 겔파쇄)

  • Lee, Soo-Gwan
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2009.06a
    • /
    • pp.419-424
    • /
    • 2009
  • The ocean rock was crushed mainly by drop hammer and blasting. In recent years, because of farming and harbors extension, the ocean rock crushing method is changing to popular complaint solving type. Effective rock crushing methods of protecting environment are studied under consideration for topography, farming, structures, electronic equipment, environment protection arm near to rock crushing sector. Effective rock crushing methods are compared under consideration for crushing volume, rock quality, distribution, crushing speed. Effective rock crushing methods at once solving popular complaint and protecting ocean environment and building ocean structures, are compared according to the coast development.

  • PDF

Performance Test for the Manganese Nodule Crushing Equipment of the Deep Seabed Mining Robot 'MineRo' (심해저 채광로봇 'MineRo' 망간단괴 파쇄 성능시험)

  • Sung, Ki-Young;Min, Cheon-Hong;Kim, Hyung-Woo;Lee, Chang-Ho;Oh, Jae-Won;Hong, Sup
    • Ocean and Polar Research
    • /
    • v.36 no.4
    • /
    • pp.455-463
    • /
    • 2014
  • This paper presents data from performance tests carried out to assess a manganese nodule crusher. Manganese nodules should be crushed into smaller pieces in order to assure the slurry flow of the lifting system. Both artificial nodules and real manganese nodules are used to evaluate nodule breaking ability of the crusher. The crushing performance of the crusher depends on the flow rate and pressure of the power transmission device. The size of the crushed manganese nodules also depends on the shape of the crushing drum. In this paper, several comparative tests are carried out to evaluate and improve the crushing performance and find the optimal design point of the crusher.

Analysis of Measured Vibration Data due to Rock Blasting and Crushing (암반발파 및 파쇄로 인한 진동값 측정과 분석)

  • Moon, Ka-Eun;Rhim, Hong-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.177-178
    • /
    • 2015
  • Various vibration caused by construction vehicles and equipment movement, rock blasting, and crushing obstacle occurs inevitably in construction sites. In this study, we measured the impact of vibration by blasting rock at construction sites, rock crushing, concrete crushing. The measuring instrument was installed in adjacent buildings and observed that blasting vibration differs depending on the charge weight, blasting distance, and the measuring position. The observation was maintained by allowable peak particle velocity standard according to each standards and references.

  • PDF

Treatment of Concrete Wastewater in Repair of Bridge Deck (교량 바닥판 보수공사에서 발생하는 콘크리트 폐수처리 방안)

  • Lee, Bong-Hak;Choi, Pan-Gil;Kim, Jung-Ki
    • Journal of Industrial Technology
    • /
    • v.28 no.A
    • /
    • pp.125-132
    • /
    • 2008
  • As of 2003, construction waste has been produced at the level of 130,614.8 tons/day, in which the amount of waste concrete was 92,639.1 tons/day and accounted for about 66.4% of the amount of construction waste. Waste concrete is mainly produced in construction work and civil engineering work. Especially, road surface crushing method using a large amount of water requires thorough management of concrete wastewater. The aim of this study was to analyze water pollution due to concrete wastewater generated in repair of bridge deck using road surface crushing equipment and to suggest reasonable countermeasures for solve the problem. In this study, it was surveyed current conditions of produced concrete wastewater in bridge deck repair, analyzed physical features of concrete wastewater, expected effects of water pollution on inflow rivers if it is not treated, established treatment plan of water pollution by categories, and calculated capacity of each treatment process and required amount of necessary chemicals. As a result of sampling wastewater generated in field sites and testing it at a lab scale, it was revealed that the original wastewater was produced in removing concrete from bridge deck slabs using surface crushing equipment whose pH was 12.53, CODMn was 12.910mg/L, SS was 547.0mg/L, and other heavy metals were included in extremely small quantities.

  • PDF

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki;Ahn, Bang-Ryul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.37-42
    • /
    • 2008
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan($2004{\sim}2006$) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, 1,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

Transfer Force and Contribution Analysis of Cone Crusher (콘 크러셔의 전달 하중 및 기여도 분석)

  • Kim, Dae Ji;Chung, Jintai;Lee, Ho Yeon;Lee, Chang Sun;Song, Chang Heon
    • Journal of Drive and Control
    • /
    • v.19 no.4
    • /
    • pp.77-84
    • /
    • 2022
  • The aims of this study was to estimate transfer force delivered to cone crusher housing and contribution of force transmission. The rock crushing condition caused vibrations in the cone crusher housing, which were experimentally measured, and frequency response functions (FRF) were also found through modal impact tests. Vibration data and frequency response functions were applied to the transfer path analysis (TPA) model. Next, transfer forces delivered to the cone crusher housing were quantified via the TPA method. Contribution of force transfer was also analyzed based on force estimation results. Finally, this study describes basic concepts and components of the TPA method and reviews its applicability to rotating machinery that experiences impact vibrations and forces.

A study on the development of life test equipment for eco-robot for collecting recycling products (재활용품 회수용 환경로봇 수명시험 장치 구성에 관한 연구)

  • Kang, B.S.
    • Journal of Applied Reliability
    • /
    • v.11 no.4
    • /
    • pp.357-369
    • /
    • 2011
  • Eco-robot for collecting recycling products is the machine which collects non-industrial wastes such as cans, PET bottles and etc. to reuse them as recycling resources. This eco-robot is operated in the condition that it should compress and hold various products without knowing their geometric shapes and material properties. For this reason reliability problems like malfunction or failure. comes to emerge, but the reliability test conditions to assess its performance and durability have not been founded yet. Therefore in this research failure mechanism of the eco-robot was analyzed and life test equipment which can reproduce actual usage conditions was developed. The compression levels in the life test were determined by measuring the crushing force acting on test products and Furthermore the test specimens which have equivalent shape and material properties with those of cans and PET bottles were proposed by simulating the deformation characteristics so that the actual compression conditions were set up in the test.

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.219-224
    • /
    • 2007
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan(2004${\sim}$2006) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, l,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

  • PDF

Grinding Method for Increasing Specific Surface Area of Fluidized Bed Fly Ash

  • Lim, Chang Sung;Lee, Ki Gang
    • Journal of the Korean Ceramic Society
    • /
    • v.56 no.2
    • /
    • pp.153-159
    • /
    • 2019
  • In this study, fly ash of a fluidized bed boiler produced in a power plant was stabilized by hydration and carbonation reaction. Then, each raw material was pulverized by two kinds of grinding equipment (Planetary mills and pot mills); the degree of grinding and the agglomeration behavior were observed. It was found that there were changes of specific surface area and particle size distribution according to grinding time. The surface of the raw material was observed using an optical microscope. As a result, agglomerates of about 75 ㎛ or more due to electrostatic phenomenon were formed as the grinding time became longer; it was confirmed that the crushing efficiency slightly increased with use of antistatic agent.