공동주택 공사기간 및 하자보수비용의 상관관계 분석 연구 (A Study on the Correlation Analysis of Construction Period and Defect Repair Costs of Apartment Housing)

  • 이영재;조동현;이미영;박상헌;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.48-49
    • /
    • 2019
  • The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.

  • PDF

조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 - (Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit -)

  • 정운수;최기수
    • 한국조경학회지
    • /
    • 제40권2호
    • /
    • pp.97-111
    • /
    • 2012
  • 본 연구는 공공건설공사 중 조경공사 적산의 단가 비교로 적정 공사비 산출방안을 모색하고자 하였다. 2011년 상반기 실적단가에서 조경공사로 분류되는 12항목 중 유사기준인 7항목을 대비하며, 준용 공종은 5개 현장에 적용된 실적단가 80항목 중 비교 가능한 35항목을 유사기준인 2011년 3월의 표준품셈 단가로 대비하였다. 조경부문 7항목의 실적공사비율은 항목별로는 104.86%, 총공사비로는 92.09%이다. 실적공사비율이 높은 이유는 암반 적용 여부로 씨앗뿜어붙이기의 높은 비율도 있지만, 근본적인 이유는 잔디와 씨앗뿜어붙이기의 사면처리 비용 때문이므로, 품셈의 불합리성과 토양 종류별 기준별 보정계수 규정을 세분할 필요가 있다. 토목과 건축 준용부문 35항목의 실적공사비율은 항목별로 78.65%, 총공사비로는 71.31%(70.17%)이다. 이는 실적단가가 구조적으로 실제 금액을 반영하지 못하는 점과, 품셈은 인력시공에서 현실성이 결여된 때문으로 판단된다. 국토해양부 발표인 85.1~91.2%의 실적공사비율은 신규 전환품목 단가이므로, 이 결과는 실제적인 실적공사비율로 추정되며, 실적단가가 적정 비율을 보이도록 검증 후 보완하고 표준품셈도 이러한 실적자료 등으로 보완이 필요하다.

건설기계 경비의 관리비 구성 분석 및 현실화 (Analysis and Realistic Estimation of Maintenance Cost of Construction Equipment Expenses)

  • 김경아;허영기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.503-508
    • /
    • 2007
  • 건설공사 표준품셈 기계경비 부분은 1960년대 초 일본 및 미국의 자료를 근간으로 하여 제정된 이후, 극히 부분적으로만 제 ${\cdot}$ 개정되었을 뿐 그 동안의 건설기계와 공법의 발전을 반영하지 못하고 있다. 본 연구에서는 표준품셈 기계경비 중에서 기계손료의 관리비(금리, 격납보관비, 보험료, 세금)를 조사하였으며 합리적인 관리비 산출을 위해 국내 ${\cdot}$ 외 문헌조사, 건설현장 16개소 실사, 그리고 건설기계장비 임대업체 20개사를 대상으로 설문조사 및 인터뷰를 실시하였다. 수집한 자료와 현행 표준품셈의 관리비 산출에 적용되는 수치들을 비교분석한 결과를 토대로 관리비를 새롭게 정의하였다. 관리비의 구성 면에서 금리, 격납보관비, 보험료와 세금 등을 고려하여 6종건설기계와 일반기계를 구분하였고 현실적인 수치를 제시하였다. 본 논문에서 제시하고 있는 각종 자료 및 수치들은 적정한 공사 예정가격을 산정할 수 있는 기초가 될 수 있을 뿐 아니라, 관련 연구의 토대가 될 수 있으리라 기대한다.

  • PDF

국내 공공 공사 하도급계약 공기연장 추가간접비 산정방안 (The Calculation Method for Prolongation cost of Sub-Constract in Domestic Public Construction Project)

  • 정기창;이재섭
    • 한국건설관리학회논문집
    • /
    • 제19권4호
    • /
    • pp.61-69
    • /
    • 2018
  • 원도급계약에서의 공기연장 추가간접비에 대한 연구는 지속되어왔다. 그러나 하도급계약에서의 공기연장 추가간접비 산정방식에 대한 연구는 거의 없는 실정이다. 본 연구는 기존 현장에서 사용되고 있는 공기연장 추가간접비 산정방식과 선행연구에서 제안된 공기연장 추가간접비 산정방식에 대해 고찰하고 모형사례를 분석하여 산정방식을 비교하였다. S-curves형태의 간접비 발생을 반영한 모형사례의 발생상황을 사례별로 제시하여 선행연구에서 제시된 공기연장 추가간접비 산정방식별 산출결과를 비교하였다. 산정방식의 문제점을 고찰하는 과정에서 원사업자의 공기연장 추가간접비 산정방식으로 타당한 것으로 연구된 바 있는, 지연기간 평균실비산정방법이 수급사업자의 공기연장 추가간접비 산정에도 타당하다는 결론을 도출하여 보편적으로 적용될 수 있음을 입증하였다.

관 부설 및 접합공사 공사비산정기준 개선에 관한 연구 (A Study on the Improvement of Construction Cost Standards for Pipe Laying and Joining Work)

  • 오재훈;안방율
    • 한국산학기술학회논문지
    • /
    • 제21권7호
    • /
    • pp.675-684
    • /
    • 2020
  • 노후 인프라로 인한 각종 안전사고 발생과 수질관리 등으로 인하여 상·하수도 관에 대한 공사가 전국적으로 활발하게 진행 되고 있다. 하지만 현장에서는 공사비적용에 있어, 공사비기준의 개정내용을 분석하는 연구나 자료가 없어 어려움을 겪고 있다. 따라서, 본 연구에서는 관 부설 및 접합공사의 공사비산정을 위한 기준현황과 현장조사내용, 개정사항을 분석하였다. 주요 개정요인으로는 시공범위의 불분명, 시설물유형에 따른 배관 재질 적용한계, 보통인부 중심의 인력구성, 인력부설의 한계, 공구손료 및 기계경비 계상기준 미비로 분석되었다. 실제 현장조사를 통해 관종별 특징을 정하여 구분하였고, 양중장비와 경장비의 투입현황 등을 파악하였다. 또한, 관부설과 병행되는 터파기 및 검측에 대한 작업내용, 기능공 투입실태를 조사하였다. 그 결과, 공통사항의 신설을 통한 작업범위의 명확화, 관 재질별 편제구성, 기능공 중심의 인력비율 조정, 기계경비의 계상근거를 마련하였다. 더불어 관의 유지관리를 위한 관 세척 기준을 제정하였으며, 주기개정을 통한 곡관, 이형관의 계상기준을 명확히 하였다. 이러한 개정결과로 인한 공사비영향성을 분석한 결과 사업별로 약 1.28%의 공사비 절감효과가 나타났다.

A Study on DEM-based Automatic Calculation of Earthwork Volume for BIM Application

  • Cho, Sun Il;Lim, Jae Hyoung;Lim, Soo Bong;Yun, Hee Cheon
    • 한국측량학회지
    • /
    • 제38권2호
    • /
    • pp.131-140
    • /
    • 2020
  • Recently the importance of BIM (Building Information Modeling) that enables 3D location-based design and construction work is being highlighted around the world. In Korea, the road map has been established to settle the design based on BIM using drone survey results by 2025. As the first step, BIM would be applied to road construction projects worth more than 50 billion Korean Won from 2020. On the other hand, drone survey regulation has been enacted and the data for drone survey cost were also included on Standard of construction estimate in 2020. However, more careful improvement is required to reflect drone survey results in BIM design and construction. Currently, Engineering instructions and Standard of construction estimate specifies that earthwork volume must be calculated by cross section method only. So it is required to add the method of DEM (Digital Elevation Model) based volume calculation on these regulations to realize BIM application. In order for that, this study verified the method of DEM based earthwork volume calculation. To get an accurate DEM for accurate volume computation, drone survey was carried out according to the drone survey regulation and then could get an accurate DEM data which have errors less than 3cm in X, Y and 6.8cm in H. As each DEM cell has 3D coordinate component, the volume of each cell can be calculated by obtaining the height of area of the cell then total volume is calculated by multiplying total number of cells by volume of each cell for the construction area. Verification for the new calculation method compare with existing method was carried out. The difference between DEM based volume by drone survey and cross section based volume by traditional survey was less than 1.33% and it can be seen that new DEM method will be able to be applied to BIM design and construction instead of cross section method.

OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 - (A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method -)

  • 이한수;이치호;한희수;이정욱
    • 한국건설관리학회논문집
    • /
    • 제25권2호
    • /
    • pp.56-68
    • /
    • 2024
  • 최근 공동주택에서의 OSC (Off-Site Construction)기반 PC구조의 객관적인 원가기준 마련을 위해 공장제작-현장설치 단계의 공사비 산정을 위한 품셈 체계를 제안하였다(Lee et al., 2021). 또한, 건설공사 표준품셈에서도 보편적인 PC공사의 현장설치 단계에 적용할 수 있는 주요 부재의 표준품셈을 제시하는 등 PC공사의 공사비를 체계적으로 산출할 수 있는 제도적 기반이 마련되는 추세이다. 본 연구에서는 공동주택 PC구조의 현장조사 결과를 분석하고 전문가 의견을 수렴하여 공동주택 PC공법에 적용할 수 있는 공장제작-현장설치 품셈을 개발하였으며, 현행 표준품셈 기준과 비교하여 공동주택의 현장 및 부재특성에 적용할 수 있도록 표준품셈의 보완 방향을 제시하였다. 또한, 개발 품셈을 활용하여 공사비를 산출하고 동일규모의 공동주택 RC공법과 공사비를 비교함으로써 PC공법의 비용발생 특성 및 원가절감 방안을 도출하였다. 본 연구에서 도출한 PC공법의 표준품셈은 PC공법 공사비 산출결과의 객관성과 일관성을 확보함으로서 PC공법 적용 확산에 기여할 수 있을것으로 기대된다.

공동주택의 현장관리 인력 산출모형 연구 (A Calculation Model of Site Management Manpower for Apartment Building Construction Project)

  • 권기덕;김선국;원일우;주진규;이군재
    • KIEAE Journal
    • /
    • 제11권4호
    • /
    • pp.47-54
    • /
    • 2011
  • Construction companies find it increasingly necessary to reduce the cost as the construction market has been suffering from a depression and the industrial environment has been changing fast lately. The cost cut demands the productivity management of the field operations, which can be made feasible by assigning an appropriate number of managers on the construction site. However, previous studies are focused on the labor productivity and construction companies take into account only the revenue per worker in organizing the staff. The purpose of this study is to research the model for calculating the field management manpower in accordance with the characteristic of project and site conditions which are usually considered in the beginning of the construction project. The data about apartment building projects of domestic large constructors and factors related to them were statistically analyzed. The results of this study can be used to calculate the necessary field management manpower in accordance with the characteristic of project.

공동주택 신축공사 환경관리비 산출방법 개선 (An Environmental Management Cost Estimating Method Improvement for New Multi-Housing Projects)

  • 이재호;박찬식
    • 한국건설관리학회논문집
    • /
    • 제7권3호
    • /
    • pp.149-158
    • /
    • 2006
  • 현행 공동주택 신축공사 발주 시 건설기술관리법에 의해 발주자는 공사예정가격에 환경관리비를 별도로 계상해야 한다. 그러나 환경관리비 산출항목과 세부산출기준이 명확하지 못하다. 또한 환경관리비는 공사현장의 특성이 고려되어 계상되어야 함에도 불구하고 품셈에 의해 산출 가능한 항목만을 계상하거나, 요율로써 획일적으로 적용하고 있는 실정이다. 따라서 본 연구에서는 건설기술관리법의 환경관리비 정의를 바탕으로 산출기준을 재정립하여 환경관리비 항목도출과 산출방법을 개발하였다. 본 환경관리비는 공동주택 신축공사를 대상으로 하였으며, 산출방법과 데이터의 신뢰성 및 객관성을 확보하기 위하여 공공기관인 OOOO공사의 실적데이터를 기반으로 자료의 수집 및 분석을 실시하였다. 그리고 공사현장의 특성을 고려하여 공동주택 신축공사 환경관리비를 쉽고 간편한 매트릭스에 의해 산출할 수 있도록 하였다. 또한 사례를 통하여 본 연구에서 개발한 환경관리비 산출 매트릭스의 타당성을 검증하였다.

개략공사비 산출을 위한 공사비 지수 연구 : 1970-1999 (A Study on the Construction Cost Index for Calculating Conceptual Estimation : 1970-1999)

  • 남송현;박형근
    • 대한토목학회논문집
    • /
    • 제40권5호
    • /
    • pp.527-534
    • /
    • 2020
  • 건설공사를 진행하는데 있어 중요한 요소 중 하나는 가격이다. 정확한 예정가격을 산정하기 위해 기본 및 세부 설계 단계에는 단가산출에 따라 가격을 산정하고 이를 토대로 건설공사의 경제성을 평가하고 진행여부를 판단한다. 국내에서는 건설공사비 가격변동을 손쉽게 조정할 수 있도록 건설연구원을 통해 건설공사비 지수를 산정하여 2004년부터 발표하고 있다. 그러나 2000년도 1월부터 지수가 산정되어 지수 발표 이전 시기의 건설공사비 자료를 사용하지 못하는 실정이다. 과거 공사비를 이용한 개략공사비 산출을 위해 건설공사비 지수를 구성하는 생산자 물가지수와 건설업 시중노임 조사를 통해 변인들을 산정하였다. 다수의 변인 중 상관분석을 통해 유의한 독립변수를 선정 후 다중회귀분석을 통해 1970년도부터 1999년까지의 건설공사비 지수를 산정하여 제시하였다. 본 연구는 2000년대 이전의 과거 공사비를 활용한 개략공사비 산정방법을 제시한 부분에 중요한 의의를 가진다.