A Study on the Improvement of Construction Cost Standards for Pipe Laying and Joining Work  

Oh, Jae-Hoon (Cost Engineering & Management Center, Korea Institute of Civil Engineering and Building Technology)
Ahn, Bang-Ryul (Cost Engineering & Management Center, Korea Institute of Civil Engineering and Building Technology)
Publication Information
Journal of the Korea Academia-Industrial cooperation Society / v.21, no.7, 2020 , pp. 675-684 More about this Journal
Abstract
To prevent safety accidents caused by aging pipe infrastructure and to maintain water quality, construction projects for water and sewage pipes are actively conducted across Korea. This study analyzed the criteria situations, site survey details, and regulation revisions related to the calculation of construction cost standards for pipe laying and joining work. The analysis showed that the major causes for revision are the unclear construction scope, limitations in implementing some pipe materials due to installation facility types, workforce focused on ordinary labor, limitations of manual laying work, and the lack of tool hire cost and machine expense-calculation criteria. Field studies were conducted to categorize the pipes according to their features, in addition to identifying the use of lifting heavy equipment and light equipment. In addition, excavation and testing work conducted in connection to pipe laying, as well as the use of skilled labor, were investigated. The current study clarified the work scope through new common items, provides an organization based on the pipe material, adjusted the workforce ratio to focus more on skilled labor, and developed grounds for calculating machine expenses. These revisions were estimated to save approximately 1.28% of the construction costs in each project according to an analysis of the construction cost impact study. truction costs in each project, according to an analysis of construction cost impact study.
Keywords
Construction-standard-production-rate; Pipe laying; Joining; Scope of work; Revision;
Citations & Related Records
Times Cited By KSCI : 8  (Citation Analysis)
연도 인용수 순위
1 S. H. Jeon, K. J. Koo, "Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work", Korea Journal of Construction Engineering and Management, Vol.9, No.2, pp.182-189, Apr. 2008
2 S. H. Jeon, K. J. Koo, "Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work", Korea Journal of Construction Engineering and Management. Vol.16, No.1, pp.110-118, Jan. 2015. DOI: https://dx.doi.org/10.1109/COMWOR.1988.4800   DOI
3 D. E. Lee, C. B. Son, "Identifying the Issues relative to Enactment and/or Revision of Construction Standard Production Unit System and Its Improvement Measures", Architectural Institute of Korea. Vol.27, No.6, pp.131-140, Jun. 2011.
4 B. R. Ahn, Y. H. Tae, S. W. Suh, Y. K. Huh, "Development of Cost Estimate System of Construction Equipment through Analysing Its Domestic Rental Market", Korea Journal of Construction Engineering and Management. Vol.13, No.6, pp.121-132, Sep. 2012. DOI : http://dx.doi.org/10.6106/KJCEM.2012.13.6.121   DOI
5 C. B. Son, S. H. Hong, H. J. Kim, "Strategies for Improving a Measurement System of Standard Unit Productivity Data on Construction Projects", Architectural Institute of Korea. Vol.26, No.6, pp.157-166, Jun. 2010.
6 D. K. Jung, Y. H. Tae, B. R. Ahn, Y. H. Cho, "A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance", Korea Society of Road Engineers. Vol.11, No.1, pp.85-94, Nov. 2009.
7 Y. K. Kim, H. M. Kim, S. W. Lee, "An analysis of excavation cycle time for Korean tunnels and the comparison with the Standard of Construction Estimate", Journal of Korean Tunnelling and Underground Space Association. Vol.21, No.1, pp.137-153, Sep. 2019. DOI: http://dx.doi.org/10.9711/KTAJ.2019.21.1.137   DOI
8 B. R. Ahn, Y. H. Tae, S. W. Suh, "The estimating method of construction workable-quantity per unit time", Korea Journal of Construction Engineering and Management. Vol.11, No.3, pp.125-133, May. 2010. DOI : http://dx.doi.org/10.6106/KJCEM.2010.11.3.125   DOI
9 J. S. Lee, Y. K. Huh, B. R. Ahn, "A Study on Estimating Construction Equipment Annual Standard Operating Hours", Journal of the Korea Institute of Building Construction. Vol.8, No.1, pp.37-42, Feb. 2012. DOI : http://dx.doi.org/10.5345/JKIC.2008.8.1.037   DOI
10 J. S. Lee, Y. K. Huh, B. R. Ahn, "Analysis of Market Rental Rates of Construction Equipments", Architectural Institute of Korea. Vol.27, No.1, pp.205-213, Jan. 2011.
11 MOLIT (Ministry of Land, Infrastructure and Transport), KICT (Korea Institute of Civil Engineering and Building Technology), "2018 Construction standard production rate, Ministry of Land Infrastructure and Transport, Korea, pp. 517.
12 J. H. Oh, B. R. Ahn, "An Analysis on the Revision Factors of Construction Cost Calculation Criteria through Field Survey of Waterproof Work", Journal of the Korea Academia-Industrial cooperation Society. Vol.20, No.10, pp.468-477, Oct. 2019. DOI : http://dx.doi.org/10.5762/KAIS.2019.20.10.468