1 |
S. H. Jeon, K. J. Koo, "Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work", Korea Journal of Construction Engineering and Management, Vol.9, No.2, pp.182-189, Apr. 2008
|
2 |
S. H. Jeon, K. J. Koo, "Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work", Korea Journal of Construction Engineering and Management. Vol.16, No.1, pp.110-118, Jan. 2015. DOI: https://dx.doi.org/10.1109/COMWOR.1988.4800
DOI
|
3 |
D. E. Lee, C. B. Son, "Identifying the Issues relative to Enactment and/or Revision of Construction Standard Production Unit System and Its Improvement Measures", Architectural Institute of Korea. Vol.27, No.6, pp.131-140, Jun. 2011.
|
4 |
B. R. Ahn, Y. H. Tae, S. W. Suh, Y. K. Huh, "Development of Cost Estimate System of Construction Equipment through Analysing Its Domestic Rental Market", Korea Journal of Construction Engineering and Management. Vol.13, No.6, pp.121-132, Sep. 2012. DOI : http://dx.doi.org/10.6106/KJCEM.2012.13.6.121
DOI
|
5 |
C. B. Son, S. H. Hong, H. J. Kim, "Strategies for Improving a Measurement System of Standard Unit Productivity Data on Construction Projects", Architectural Institute of Korea. Vol.26, No.6, pp.157-166, Jun. 2010.
|
6 |
D. K. Jung, Y. H. Tae, B. R. Ahn, Y. H. Cho, "A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance", Korea Society of Road Engineers. Vol.11, No.1, pp.85-94, Nov. 2009.
|
7 |
Y. K. Kim, H. M. Kim, S. W. Lee, "An analysis of excavation cycle time for Korean tunnels and the comparison with the Standard of Construction Estimate", Journal of Korean Tunnelling and Underground Space Association. Vol.21, No.1, pp.137-153, Sep. 2019. DOI: http://dx.doi.org/10.9711/KTAJ.2019.21.1.137
DOI
|
8 |
B. R. Ahn, Y. H. Tae, S. W. Suh, "The estimating method of construction workable-quantity per unit time", Korea Journal of Construction Engineering and Management. Vol.11, No.3, pp.125-133, May. 2010. DOI : http://dx.doi.org/10.6106/KJCEM.2010.11.3.125
DOI
|
9 |
J. S. Lee, Y. K. Huh, B. R. Ahn, "A Study on Estimating Construction Equipment Annual Standard Operating Hours", Journal of the Korea Institute of Building Construction. Vol.8, No.1, pp.37-42, Feb. 2012. DOI : http://dx.doi.org/10.5345/JKIC.2008.8.1.037
DOI
|
10 |
J. S. Lee, Y. K. Huh, B. R. Ahn, "Analysis of Market Rental Rates of Construction Equipments", Architectural Institute of Korea. Vol.27, No.1, pp.205-213, Jan. 2011.
|
11 |
MOLIT (Ministry of Land, Infrastructure and Transport), KICT (Korea Institute of Civil Engineering and Building Technology), "2018 Construction standard production rate, Ministry of Land Infrastructure and Transport, Korea, pp. 517.
|
12 |
J. H. Oh, B. R. Ahn, "An Analysis on the Revision Factors of Construction Cost Calculation Criteria through Field Survey of Waterproof Work", Journal of the Korea Academia-Industrial cooperation Society. Vol.20, No.10, pp.468-477, Oct. 2019. DOI : http://dx.doi.org/10.5762/KAIS.2019.20.10.468
|