A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods

  • Peressini, Anthony;Bristow, James;Motahari, Mahmoud;Karakouzian, Moses
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.669-677
    • /
    • 2022
  • In this paper, different types of traditional project delivery methods in the construction industry were explored and a comparative analysis against Integrated Project Delivery (IPD) were performed. The advantages of IPD method for all parties, owner/engineer/architect/general contractor, were explored by reviewing the most recent literature. The literature suggests that IPD method should be the dominating project delivery method and diluting the conventional methods such as Design-Bid-Build due to more collaborative and mutually beneficial ways of doing construction; IPD is newer and a more comprehensive method to capture the intrinsic values of project collaboration. This paper presents a comparison of the commonly used methods of project delivery, Design-bid-build, CMAR, & Design-Build and addresses their advantages and disadvantages in differing project scopes and sizes. Several industry leaders with experience in the four types of project delivery addressed were surveyed. The survey results show an overwhelming desire for future projects to go toward IPD from the contractor/owner/RDP. The biggest obstacle facing a project from using IPD appears to be trust.

  • PDF

Development of a Business Support System by Phase for Delivering Construction Management Contract in the Government Civil Project (공공토목사업 CM 발주를 위한 단계별 업무지원 시스템 구축)

  • Chae, Yeong-Seok;Park, Seo-Young;Moon, Hyoun-Seok;Kim, Seon-Yeong;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.81-92
    • /
    • 2011
  • Recently, the MLTM (Ministry of Land, Transport and Maritime Affairs) has announced CM business guidelines, because it is expected that the CM deliveries are going to be increased for a civil engineering industry with enforcement of the CM at Risk. In this trend, The CM business guideline, which is currently announced, is for the steps after the CM contract. However, the practical business guideline from a planning phase for the CM delivery to a selection phase of a CMr (Construction Manager) is essential for public construction projects including the civil engineering projects that the frequency of the CM deliveries is not sufficient. Therefore, this study established a standardized process model from the planning phase for the CM delivery to the selection phase of the CMr. study configured a business breakdown structure for CM delivery. A prototype system for supporting the CM delivery was also developed, and a practical operability was verified by a case evaluation based on the developed system. Hence, it is expected that this study will be utilized as a supporting system of the CM delivery business for public clients, which have not sufficient cases of the CM delivery.

Analysis of Safety Management Operations of Fire Risk Factors in Small-Scale Construction Sites (소규모 건설현장 화재 위험요인 안전관리 운영실태 분석)

  • Moon, Pil-Jae;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.775-785
    • /
    • 2022
  • By analyzing the operation status of fire safety management of small construction site workers, deriving problems, and suggesting improvement measures, this study was conducted to present practical basic data for their efficient use in the future, and the following conclusions were drawn. First, it was analyzed that small construction site workers are elderly in the age group of construction workers, have short construction skills, most of the jobs are working in the construction industry, and the employment type is non-regular workers. Second, the fire safety management improvement plan of small construction site workers is systematized, fire safety manager is deployed to manage fire risk, fire escape routes and emergency warning facilities are provided to inform all workers at the construction site. In addition, measures to reduce industrial accidents are needed through realistic evacuation training, fire VR training, and interesting educational programs.

A Case Study of the Rock-fall Signal Lamp System for Preventing the Damage at the Cut-Slopes (사면붕괴 피해 예방을 위한 낙석신호등 설치 사례 연구)

  • Kim, Seung-Hyun;Koo, Ho-Bon;Rhee, Jong-Hyun;Baek, Yong
    • The Journal of Engineering Geology
    • /
    • v.17 no.2 s.52
    • /
    • pp.253-261
    • /
    • 2007
  • The failure of the road cut-slope due to heavy rains brings about lots of injuries and damage on national properties. KICT has developed CSMS system by means of prevention to manage the dangerous cut slopes. In spite of the continuous management the frequency of cut-slopes failure is increasing the past due to changes of earth-environment. KICT has installed the "Real-Time Monitoring System" on dangerous slopes. The operation of Real-Time Monitoring System is used as a positive system to reduce injuries and damages. However, Although the slope manager is aware of the signs collapsed in advance, it has temporal and spatial limits until the slope manager performs the works which are preventing the accidents. When real time monitoring system finds out an indication of slope collapse, the Rock-fall Signal Lamp System makes road-users indicated the risk of cut slopes. It is a kind of prevention system that it will minimize the damages of the properties as suspension of traffic automatically or passively.

A Comparative Analysis of Risk Impacts on Cost Overrun between Actual Cases and Managers' Perception on Overseas Construction Projects (해외 프로젝트 시공단계 리스크 요인의 실제 비용 초과 영향과 현장관리자 인식 차이 분석)

  • Lee, Kyung-Tae;Ann, Hannah;Kim, Jae-Won;Kim, Ju-Hyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.52-60
    • /
    • 2021
  • Due to the significant size of overseas construction projects, the cost overrun has enormous impacts on the financial status of construction companies. The managers' appropriate perception and identification of key risk factors in the construction phase notably affect the performance of projects. However, the actual impacts of risk factors and local manager' s perception of them could be deviated. For this reason, we aim to compare the performance of actual cases and general opinions of responsible practitioners in terms of risk factors relevant to cost overruns in order to present a practical strategy for risk management. Firstly, factors classified from literature review were used to simulate 290 cost overruns data sets from 20 cases by introducing Monte-Carlo Simulation and were ranked by standardized coefficients through multiple regression analysis. Secondly, a survey was conducted against 42 local managers to rank their perception of impact on cost overrun with identical factors by using Stepwise Weight Assessment Ratio Analysis (SWARA). Comparison results show that conflicts such as 'conflict with subcontractors' and 'conflict with the local community' have caused excessive cost overrun. However, managers' perception of these as less significant than the actual influences and consider other risks such as 'material price fluctuation' and 'construction quality errors', as relatively serious. Therefore, education for local managers on conflict risks needs to be presented.

A Study on the Estimation of the Contingency by the Regression Analysis on the Apartment (회귀분석을 통한 공동주택 공사예비비 산정에 관한 연구)

  • Lee Man-Hee;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.226-229
    • /
    • 2003
  • Construction manager must consider the possibility on the failure of the project in advance and the contingency to provide against the situation, those of which is a dangerous condition not to predict. If they have a quick decision without understanding the contingency, the over-cost in the total cost would be continuously accumulated, and be a barrier at a project going in progress. A various risk could not be coped with at a time to decide either going or sloping the project until the contingency is applied from the first step to progress the project. But a case to apply the contingency to the construction for the investment or the analysis of the project is a little. The process to evaluate it is also absent. The propose of this paper is the followed ; To establish the total cost including the risk first of all, devide into plus or minus factor of the cost, and then the process to calculate the contingency must be suggested by the regression analysis.

  • PDF

A Study on Safety Inspection Model for Small Scale Construction Field (중.소규모 건설현장 안전점검 모질 연구)

  • 안병수;양광모;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.3
    • /
    • pp.11-21
    • /
    • 2001
  • Domestic construction industry has considerable level of construction performance and technology thanks to the economic development and as the result of performing diverse oversea construction project. However, construction disasters have been steadily increasing, and do severe disasters at faster pace. Most of such disasters happen at small and small medium-sized construction fields, which contract size is less than 10 billion won. small and medium-sized construction fields are not obliged to designate a safety manager, and have limitations in engaging self-regulating disaster prevention activities due to reduced budget for safety facilities. For the small and medium-sized construction sites with less than 10 billion won, the Ministry of Labor has been carrying out mobile inspections of construction safety. However, the effect so far is insignificant and an improvement plan is required. Therefore, in the present thesis, we derive problems appearing in the current construction safety mobile inspection system, investigate and study systems in foreign countries, and suggest an efficient and effective plan to operate safety technology inspections. First of all, we establish a standard to select sites to be inspected that are high in construction risk and disaster occurrence probability In addition, we suggest a plan to take administrative and judiciary measures based on the total score for disaster factors considering the disaster occurrence probability and the illegal practices. Furthermore, a scheme to maximize the effect of disaster prevention is sought by building an organic cooperative system between the Ministry of Labor, Korea Occupational Safety & Health Agency and other organizations specialized in instruction of construction disaster prevention. Finally, we induce a research conclusion that leads to self-regulating safety management through checking and instructing systematic management on mobile inspections.

  • PDF

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF

A Study on Duration Calculation Method for Eco-Friendly Remodeling Demolition Work Using Productivity Analysis (생산성 분석에 기초한 친환경 리모델링 철거공사 기간 산출 방안)

  • Woo, Joong-Pyung;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.124-132
    • /
    • 2013
  • An influx of the population to the city has soared due to industrialization. As times go by, cities become densely populated so Korean government started to construct a number of buildings including apartment housings. Because they have become functionally, structurally, esthetically deteriorated over the past two decades. some improvements are needed. There are mainly two ways to improve old buildings: remodeling and reconstruction. Between the two, the first one is more popular as it is less time-consuming and more eco-friendly. Demolition work comes first for both of them and it should not give negative effects since it is regarded as a CP(Critical path) in the overall process. For this reason, a thorough construction management must be done. The reality, however, demolition is managed by the construction manager's experiences and decisions. If the key factor of demolition which is the planning of manpower and machine equipment, is determined by unscientific and subjective judgments, its period and risk also will increase. In particular, eco-friendly demolition can be more risky because it's been rarely conducted. Therefore, scientific and objective ways of demolition management are needed. In this context, this paper aims at analyzing productivity in each process of demolition focusing on manpower and machinery equipment which are the main parts of demolition assuming that the demands of eco-friendly remodeling demolition projects will be increasing. At the same time, by estimating working period through the output, this paper would be helpful to set up the plans for overall project in earlier stage.