Browse > Article
http://dx.doi.org/10.6106/KJCEM.2011.12.5.81

Development of a Business Support System by Phase for Delivering Construction Management Contract in the Government Civil Project  

Chae, Yeong-Seok (경상남도 시천시청 공단조성과)
Park, Seo-Young (경상대학교 토목공학과)
Moon, Hyoun-Seok (경상대학교 토목공학과)
Kim, Seon-Yeong (경상대학교 토목공학과)
Kang, Leen-Seok (경상대학교 토목공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.12, no.5, 2011 , pp. 81-92 More about this Journal
Abstract
Recently, the MLTM (Ministry of Land, Transport and Maritime Affairs) has announced CM business guidelines, because it is expected that the CM deliveries are going to be increased for a civil engineering industry with enforcement of the CM at Risk. In this trend, The CM business guideline, which is currently announced, is for the steps after the CM contract. However, the practical business guideline from a planning phase for the CM delivery to a selection phase of a CMr (Construction Manager) is essential for public construction projects including the civil engineering projects that the frequency of the CM deliveries is not sufficient. Therefore, this study established a standardized process model from the planning phase for the CM delivery to the selection phase of the CMr. study configured a business breakdown structure for CM delivery. A prototype system for supporting the CM delivery was also developed, and a practical operability was verified by a case evaluation based on the developed system. Hence, it is expected that this study will be utilized as a supporting system of the CM delivery business for public clients, which have not sufficient cases of the CM delivery.
Keywords
CM Delivery Business Breakdown Structure; CM Delivery Business Process Mode; CM Delivery Support System;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Luiten G. (1994). Computer Aided Design for Construction in the Building Industry. Ph. D. Thesis, Delft University of Technology. The Netherlands.
2 이복남, 이재섭 (2009). 건설사업 발주제도 선진화 방안, 한국건설관리학회지, 제10권 제2호, pp. 27-30
3 Aouad G. (1997). Open Systems for Construction Information(OSCON). Draft Industrial Report. Buhu Research Centre. University of Salford. pp. 2-7
4 CMAA Documents. (1993). Construction Management Association of America, Inc.
5 Platt D. G. (1996). Building Process Models for Design Management. Journal of Computing in Civil Engineering. ASCE. Vol. 10. No. 3. pp. 194-203   DOI   ScienceOn
6 강인석, 박서영, 곽중민, 이우식, 박홍태 (2000). 공사시행 단계별 CM업무 표준화를 위한 프로세스 구축방안, 대한건축학회논문집, 제16권 제8호, pp. 3-8
7 김중곤, 정지현, 이학기 (2009). CM at Risk방식 도입에 따른 건설업체의 대응방안, 대한건축학회지회연합회논문집 제11권 1 호, pp. 159.
8 채영석 (2009). 공공건설사업 CM 발주를 위한 프로세스 모형 기반 지원 시스템 구축, 경상대학교 대학원 토목공학과 박사학위논문
9 우성권, 이준원 (2000). CM 발주방식에서 CM의 평가 및 낙찰자 선정 방안, 건설산업동향, 65호