• 제목/요약/키워드: construction cost estimation

검색결과 493건 처리시간 0.028초

철도노선 선정에 따른 토공량 산출 프로그램 개발 (A Program for Calculating Earth Works by Railway Route Selection)

  • 이동욱;지상복;이태식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1168-1173
    • /
    • 2004
  • The alignment design is one of the most influencing elements in earth work for the railway design. The amount of earth work mostly depends on the route, and the construction cost for railway construction largely depends on it. For this reason. it is necessary to develop a program for the construction cost estimation by route alternatives. This study introduces a program for the estimation of the earth work amount including the logics and the way to use.

  • PDF

시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구 (A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects)

  • 강상혁;박원영;송순호;서종원
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.159-166
    • /
    • 2006
  • 우리나라의 공공 건설공사 예정가격 산정 근거로 사용되어 온 표준품셈은 다양한 시공환경, 공법, 기술수준 등에 따른 공사비의 변동을 현실적으로 반영하지 못하여 부실시공이나 과다비용의 산정과 같은 문제점이 대두되었다. 이에 정부는 표준품셈을 2004년부터 점차 축소하는 대신 실적공사비 제도를 단계적으로 도입키로 했다. 본 논문에서는 과거 낙찰되었던 계약단가 뿐 아니라 모든 입찰단가 자료를 활용하여 실적단가를 산출하기 위한 일련의 절차 및 방법론을 제시하였다. 본 절차에서 주요하게 다룬 사항은 신뢰성 있는 데이터 확보를 위해 저가입찰 등과 같은 전략적 입찰단가 추출에 대한 분석기준이다. 과거의 입찰단가 자료의 기술통계 결과를 바탕으로 두 차례에 걸쳐 전략적 입찰단가로 의심되는 통계적 이상치를 제거하고, 시간에 따른 보정을 통해 현가화하여 현재 활용가능한 실적단가를 산출하였다. 또한 입찰방식 및 예상낙찰률에 따른 입찰단가의 변동특성을 분석 악하여 실적단가 보정을 위한 기초연구를 수행하였다. 제안된 일련의 분석 및 산출 과정을 거쳐 현실성 있고, 시장성을 보다 충분히 반영할 수 있는 합리적인 예정가격의 산정이 가능할 것으로 사료된다.

오브젝트-파라미터기반 건축마감공사비 개산견적 모델 (Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings)

  • 구교진;박성호;박성철;송종관
    • 한국건설관리학회논문집
    • /
    • 제9권6호
    • /
    • pp.175-184
    • /
    • 2008
  • 건설 프로젝트의 수익성 및 타당성을 판단하기 위한 기준으로 설계초기단계에 활용되는 개산견적은 설계의사결정 업무와 밀접한 연계성을 가지고 수행되어야 할 뿐만 아니라, 정확하고 신뢰성 있는 견적결과를 도출해야 한다. 설계초기단계에서 설계자의 의사결정 지원과 설계변경에 대한 즉각적인 대처를 위해 프로토타입기반 개산견적 시스템이 개발되었지만, 파라미터에 의해 산정되는 공사항목 및 사용자에 의한 추가공사에 대한 공사비 고려가 미흡하였다. 따라서 본 연구에서는 견적의 정확도를 향상시키기 위해 실제 고층 오피스 빌딩 프로젝트의 실적자료 분석을 통해 기본설계단계에서 오브젝트-파라미터기반 건축마감공사비 산정 모델(Object & Parameter based Schematic Estimation Model, OPSEM)을 개발하였다. 모델 개발을 위해 공사비 내역서, 도면으로부터 얻은 작업항목에 대한 정보를 분석 및 분류하고, 각 작업항목 속성에 맞는 공사비 산정 방식을 제안하였다. 본 연구의 실무 효용성 검증을 위해 유사 사례 프로젝트를 바탕으로 기존의 견적방식과 제시된 모델을 활용한 견적방식의 오차율을 분석하여 정확도 비교를 실시하였다.

RC라멘교의 기본설계단계 개략공사비 산정모델 (The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge)

  • 김병수;권석현
    • 한국건설관리학회논문집
    • /
    • 제10권2호
    • /
    • pp.111-120
    • /
    • 2009
  • 건설공사에 소요되는 공사비의 개략적인 산정은 건설프로젝트의 계획단계뿐만 아니라 기본설계단계에서 예산을 확정하기 위해서 필수적이다. 현재 국내의 개략공사비 산정모델은 단위길이당 단가 또는 단위면적당의 단가를 이용하여 계산하는 선형적인 단순 모델로써 오차율이 너무 큰 문제점이 있다. 본 연구에서는 과다한 오차율의 문제를 해결하기 위하여 RC라멘교의 특성을 고려하였으며 공사비의 변동특성에 따라 그룹핑(Grouping) 및 대표물량방식 그리고 합성단가를 사용한 모델을 개발하였다. 본 연구의 결과 실제 설계공사비와의 오차를 상당히 줄일 수 있었으며 따라서 발주처나 용역업체에서 RC라멘교의 예산을 산정하는데 기여할 것으로 기대한다.

개략견적 기법 개발을 위한 신한옥 특성 분석 (Characteristics of Modernized Hanok for development Estimate system.)

  • 김효선;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.124-125
    • /
    • 2013
  • The purpose of this research is to propose an approximate estimation system for Modernized Hanok. Mock-up (Jisinjae) site data has been collected and analysed to characterize the modernized Hanok and to examine the range of cost fluctuation rate with each work items. As a result, number of floor, area (㎥), shape, methods and materials were considered as key factors for price change on the total construction cost. Furthermore, wood structure (34%) and roof (17%) account for major cost percentage. The cost fluctuation rate of two factors were -3.3%~+5.6% (wood structure) and -4.1%~+4.2% (roof). For further research, existing method will be analysed in order to developing the Hanok estimation system. And the cost fluctuation rate of every work items will be continually evaluated.

  • PDF

콘크리트포장 시공실태 조사에 따른 표준시장단가 개정 연구 (A Study on the Revision of Construction Standard Unit Price for Concrete Pavement Works)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2022
  • This study aims to come up with the revision of construction standard unit price for concrete pavement works to improve its applicability and availability by a construction site survey. Construction site survey was conducted from March to November 2021 with 36 construction sites. This results of the revision are expected to support to public construction project owner or estimator in construction cost estimation works.

  • PDF

파라메트릭 방법(Parametric Method)을 이용한 사업초기 단계의 공사비 예측 방법 (Cost Estimating in Early Stage Using Parametric Method for Apartment Construction Projects)

  • 성기훈;박문서;이현수;지세현
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.207-211
    • /
    • 2008
  • 국내 건설산업은 급격한 시장변화와 경쟁심화의 과정을 겪으면서 프로젝트 초기 단계의 예산 집행 및 관리의 중요성이 증가하고 있다. 설계 완료 이후의 단계에서 조정 가능한 비용은 20%에 불과하기 때문에, 프로젝트 초기 단계에서 중요한 의사결정이 이루어진다. 하지만 초기 단계에서의 의사결정은 설계정보가 확정되지 않고, 정보가 한정되는 등 불확실성 하에서 이루어진다. 이에 따라, 본 연구는 프로젝트 초기 단계의 정확한 비용 예측을 목적으로 parametric method를 사용하여 공사비 예측 방법을 제안하였다. Parametric method를 이용한 공사비 예측 방법은 프로젝트 초기단계에 사용하기에 적합하며, 특히 신속하게 공사비 예측을 할 수 있다는 장점을 지닌다. 국내 아파트 9개 단지 $11{\sim}15$층 규모의 총 84개동 공공아파트 실적자료를 분석하여 공사비와 영향요인간 상관관계 분석을 실시하였다. 다중공선성 문제를 야기하는 변수를 제거한 후, 다중회귀분석을 통하여 공사비 예측 관계식을 도출하였다.

  • PDF

1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구 (Study on Improvement of Cost Calculation Method in Construction less than One Day Workload)

  • 신대웅;이영도;신윤석;김광희;유상록;박원준
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.477-485
    • /
    • 2014
  • 표준품셈과 실적공사비 적산방식은 건설공사의 예정가격을 산정하는 가장 대표적인 기준자료이다. 하지만 이러한 공사비 산정방식은 1일 작업량 미만의 작업에서 정의, 할증 또는 보정기준 등이 명확하지 않아 적정 공사비의 산정이 어려운 실정이다. 따라서 본 연구는 1일 작업량 미만의 작업에서 표준품셈과 실적공사비의 문제점을 파악하고 이에 대한 개선방안을 제시하고자 한다. 이를 위해 본 연구에서는 경기도내 44개의 전문건설업체에 대하여 설문조사를 실시하여 빈도분석을 하였다. 본 연구를 통하여 표준품셈에서는 인건비, 실적공사비에서는 장비비, 공종별로는 도로포장 및 유지공사의 장비비가 각각 가장 높은 비율로 초과되었다는 결과를 도출하였다. 결과를 바탕으로 표준품셈과 실적공사비는 공사의 규모에 따른 구분 등 각각 3가지의 개선이 필요하다. 본 연구의 결과는 1일 작업량 미만의 작업에서 공사비 산정 제도의 개선을 위한 기초자료로 활용될 수 있을 것이다.

초·중등학교 민간투자사업(BTL)의 건축공사비의 공종별 비율 분석 (Architectural Work Cost Rate Analysis of Elementary, Middle, and High School Delivered by BTL)

  • 류한국;김형은
    • 교육녹색환경연구
    • /
    • 제14권1호
    • /
    • pp.1-9
    • /
    • 2015
  • 정확한 공사비 추정은 성공적인 프로젝트의 개발에 필수적이다. BTL 사업과 같이 민간투자사업에 있어서 정확한 공사비 산정은 효과적인 예산확보와 파이낸싱에 필수적인 기본 정보가 된다. 공사비 견적의 정확도에 따라 입찰과 제안서의 정확도가 반영되므로 프로젝트를 통한 수익성 여부와 사업타당성을 확보할 수 있다. 본 연구는 정확한 공사비 분석과 활용을 위한 기초적인 연구로써 10년 정도 경과한 초 중등학교 민간투자사업(BTL)의 건축공사비를 분석하여 여러 참여주체들별로 공사를 할 수 있는 건축공사의 공종별 분포비율을 학교급별로 파악한다. 즉, 초 중등학교의 건축 공종별 구성비율을 전체 평균비율, 초등학교, 중학교, 고등학교별로 살펴보고 향후 유사한 공사를 수행하는 경우에 참여주체별로 활용할 수 있도록 하고자 한다.

서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구 (A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique)

  • 신재민;김광희
    • 교육녹색환경연구
    • /
    • 제11권3호
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.