The regulation for industrial accident rate level assessment of construction companies was introduced to the construction industry in the Republic of Korea since 1993 and has brought positive outcome on industrial accidents reduction at construction work sites. There were considerable decrease of industrial accident ratio and enforcing of contrators' safety organizations from the beginning of the regulation for industrial accident rate level assessment. In spite of these positive outcomes, there were some negative effects such as contractors' shrinking accident reports to keep good accident ratios since these figures had a great impact on pre-qualification stage of bidding when general contractors were competing for new construction projects. In addition, Comprehensive evaluation bid system, which replaces the lowest price bid system is applied to government-ordered construction projects since 2016. Comprehensive evaluation bid system includes construction company's accident rate as one of the evaluation items and carries out with the industrial accident rate level assessment of construction companies at the same time. The regulations of two systems have been called for improvement to unify these different procedures and standards which have led business stakeholders to confusion for several years. This study aims to devote on lessening shrinking accident reports and to reduce the waste of business stakeholders through changing the regulation for industrial accident rate level assessment.
Internet group buying systems have been widely used recently. In those systems, because the reserve price is provided by the buyer, the success rate can be decreased if the reserve price is set too low compared with the normal price. Otherwise, an unsuitable successful bid can be made if the reserve price is set too high based on inaccurate information. Likewise, the seller's providing too high a bid price can deteriorate his/her own successful bid rate, whereas a successful bid with too low a price may make no profit in the sale. Therefore, pricing agents that recommend adequate prices based on the past buying and selling history data can be helpful. In this paper, we propose two kinds of agents. One suggests reserve prices to buyers based on the past buying history database of the system. The other recommends bid prices to a seller based on the past bidding history data of the company using the cost accounting theory. Through performance experiments, we show that the successful bid rate can increase by preventing buyers from making unreasonable reserve prices. Also, we show that, for the seller, the rate of successful bids with appropriate profits can increase. Using the pricing agents, we design and implement an XML-based group buying system.
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.2D
/
pp.247-253
/
2011
In 2009, the Korean international construction industry showed a great performance, totaling 49.1 billion of contract and then this achievement has been considered a key milestone presenting that the international construction industry is one of the primary export industries of Korea. However, because of the construction firms' equalized levels of technology and price competitiveness, the competition among bidders is becoming more intensive. Moreover, this changing market circumstance leads construction firms to apply for bidding with the lowest price that could not meet the expected profitability of a project. Therefore, to develop various strategies based on project characteristics becomes one of the critical capabilities that construction firms should possess. Based on these motives, this study is aimed to investigate associations among number of bidders, contract award rate, profitability on international projects. For the correlation analysis, a set of data is structured by collecting all projects ranging from 1993 to 2009, excluding projects funded by official development and domestic funds. The number of bidders were grouped depending on project characteristics such as market regions, project types, bidding types, and order organization types. As the result of correlation analysis, contract award rate increases as the number of bidders increase, but the relationship between the number of bidders and profitability is negative. Understanding the correlations among variables can be employed in developing strategies to improve construction firms' competitiveness in the international construction market.
Korean Journal of Construction Engineering and Management
/
v.6
no.5
s.27
/
pp.119-127
/
2005
According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.
This study was carried out in order to understand the plan, design, constructing and actual condition of management of modernized horticultural facilities in Kyungpook Province which had been constructed from 1992 to 1995 funded by Government support. The aim of this study is to provide reference data for success of the forth project. It was performed by making up a question about driving of project and management condition of equipment after constructing. The results obtained from this study are as follows: 1. 73.5% of facilities horticulture farmhouse recognized that the prospect of greenhouse is bright, but 92.5% of the farmhouse also recognised that they need technical consultation on protected horticulture farming. Therefore, technical educations would must be enhanced about foundation of greenhouse and cultivation technique. 2. The holding times of explanatory meetings, cause of understanding to farmhouse, were one or two times in greenhouse construction, and 62.5% of the farmhouse expressed the insufficiency at the explanation and educational data. For this reason, it was judged that the construction contract had been delayed more than 5 months in 49.3% of the farmhouse after the decision of project budget. 3. In constructing after a contract, the rates of construction delay is 53.4% and defect occurrence is 41.1%. The biggest reasons of construction delay was insufficiency of worker and materials supply. Each percentage is 29.1%. And the reason of defect occurrence is badness of machinery equipment(62.9% ). 4. In management of greenhouse, a pipe-constructed plastic film greenhouse changes plastic film every one and three years because of sticking dust on plastic film. It was needed to about in cleaning technique of coverings. Because that used 3-5 years only half of the expected life span. 5. The order of broken rating in the subsidiary equipment is like this lollop ventilator (42.8%), a general control system(33.3%) especially, in the case of a general control system, the rate of all family can control is 52.7%. so, it is time to develop easy control equipment which every one could use as soon as possible. 6. When choose heat generator as decide capacity, the most priority is the mount of heat generator the percent is 45.5% heat generator and as decide model, the private purchase's percent is 77.3%. It is higher than a public bidding heat generator the percent is 22.7% heat generator when it compare with a public bidding. In the case of $CO_2$ generator, using rate is only 19.0%. The using rate is very low, so it needs education how to use depends on the way of the subsidiary equipment. 7. In the case of seedlings, it is asked to use factory-processed seedling effectively. because it's difficult to get security of labors(58.8%), hoped crops (55.9%) access same crops(29.4%) much more and changing of crops depends on market situation. that is the main reason the lack of knowhow.
Korean Journal of Construction Engineering and Management
/
v.12
no.6
/
pp.3-13
/
2011
The construction industry is still the most risky industry and labor accident is a significant management factor on construction site. Safety management has been studied for improving the safety performance on construction sites. However, Almost all of them have been considered on the site safety management for the contractors and evaluation of accident rate. To resolve the limitation of current research, this study is focused on considering accident result and effort by performing the evaluation of safety level of the head office and site in construction companies. By studying the research about a safety management and interviewing with specialists in safety management, 7 items were selected and weighted based on the KOSHA18001 List. Consequently, The checklist was developed to evaluate safety performance management in construction company and Safety Management Index was suggested to coordinate 1) the score of results in accident rate and 2) the effort to evaluate a safety performance management. Safety Management Index is more helpful to evaluate the safety management results and effort. As a result of considering the score of the accident rate and the safety performance management, the outcome of prequalification was changed. Using this index, contractors will attempt to prevent accidents and owners will be able to discriminate individual differences in bidding process.
International conference on construction engineering and project management
/
2007.03a
/
pp.239-248
/
2007
In the highly competitive construction industry, a slight inaccuracy of estimation can easily cause the loss of a project. Erroneous experience-based cost estimates or allocations of on-site supervisory manpower often offset the profit gained from the project and may jeopardize the management processes. To counter these types of problems, we develop a model using mathematical analysis and case-based reasoning to automate the allocation of on-site supervisory manpower and estimate construction site costs. The method is founded upon laborious data collection processes and analysis by matching statistical assumptions, and is applicable to construction projects. In the modeling the costs and allocation of on-site supervisory manpower are quantified for both owners and contractors before initiating or bidding on the projects. The findings confirm that the degree of variation of the model predictions has an accuracy rate at 88.47%. Single-site construction projects can be accurately predicted and the assignment of supervisory manpower feasibly automated.
The Journal of the Korea institute of electronic communication sciences
/
v.9
no.3
/
pp.377-386
/
2014
This study analyzed how alternative investment goods would affect a market in a neighboring shopping area in order to provide parties involved in the investment market of this neighboring shopping area with standards which would help them when they try to make a reasonable determination. The study estimated forms and explanation power of the effects of a bid rate of a neighboring shopping area, and came up with those results as follows. Increases in the representative macro economic indicators, the composite stock price index and the fluctuation rate of land price, including the real estate business would have a positive influence on the market of the neighboring shopping area as playing a circumstantial evidence of market recovery and yet, the increase in interest rate, the alternative investment goods, would reduce the relative price-earnings ratio which would, eventually, negatively affect the charm of the investment in the market of the neighboring shopping area. The study, now, understands that housing with a feature of consumers' goods and neighboring shopping area with a feature of investment goods would not have great concern with each other as they are observed to be two different markets from an aspect of interactionism.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.4
/
pp.682-691
/
2016
The purpose of this study is to explore the causal and precedence relationships between the housing sub-market and the results of a consumer sentiment survey about the housing market. This study investigates the relationships between the survey results and an apartment deal price index by size and bidding price rate in apartment auctions by extending research related to consumer sentiment surveys. We surveyed the Seoul Metropolitan Area and analyzed the results using a unit root test, cointegration test, Granger causality test, and cross-correlation test. It was confirmed that causality exists between the survey results and apartment deal price index by size and bidding price rate, and it was also confirmed that there are correlation and precedence relationships between them.
It is difficult to evaluate the performance of process innovation of e-procurement which has large scale and complex processes. The existing evaluation methods for measuring the effects of process innovation have been mainly done with statistically quantitative methods by analyzing operational data or with qualitative methods by conducting surveys and interviews. However, these methods have some limitations to evaluate the effects because the performance evaluation of e-procurement process innovation should consider the interactions among participants who are active either directly or indirectly through the processes. This study considers the e-procurement process as a complex system and develops a simulation model based on MAS(Multi-Agent System) to evaluate the effects of e-procurement process innovation. Multi-agent based simulation allows observing interaction patterns of objects in virtual world through relationship among objects and their behavioral mechanism. Agent-based simulation is suitable especially for complex business problems. In this study, we used Netlogo Version 4.1.3 as a MAS simulation tool which was developed in Northwestern University. To do this, we developed a interaction model of agents in MAS environment. We defined process agents and task agents, and assigned their behavioral characteristics. The developed simulation model was applied to G2B system (KONEPS: Korea ON-line E-Procurement System) of Public Procurement Service (PPS) in Korea and used to evaluate the innovation effects of the G2B system. KONEPS is a successfully established e-procurement system started in the year 2002. KONEPS is a representative e-Procurement system which integrates characteristics of e-commerce into government for business procurement activities. KONEPS deserves the international recognition considering the annual transaction volume of 56 billion dollars, daily exchanges of electronic documents, users consisted of 121,000 suppliers and 37,000 public organizations, and the 4.5 billion dollars of cost saving. For the simulation, we analyzed the e-procurement of process of KONEPS into eight sub processes such as 'process 1: search products and acquisition of proposal', 'process 2 : review the methods of contracts and item features', 'process 3 : a notice of bid', 'process 4 : registration and confirmation of qualification', 'process 5 : bidding', 'process 6 : a screening test', 'process 7 : contracts', and 'process 8 : invoice and payment'. For the parameter settings of the agents behavior, we collected some data from the transactional database of PPS and some information by conducting a survey. The used data for the simulation are 'participants (government organizations, local government organizations and public institutions)', 'the number of bidding per year', 'the number of total contracts', 'the number of shopping mall transactions', 'the rate of contracts between bidding and shopping mall', 'the successful bidding ratio', and the estimated time for each process. The comparison was done for the difference of time consumption between 'before the innovation (As-was)' and 'after the innovation (As-is).' The results showed that there were productivity improvements in every eight sub processes. The decrease ratio of 'average number of task processing' was 92.7% and the decrease ratio of 'average time of task processing' was 95.4% in entire processes when we use G2B system comparing to the conventional method. Also, this study found that the process innovation effect will be enhanced if the task process related to the 'contract' can be improved. This study shows the usability and possibility of using MAS in process innovation evaluation and its modeling.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.