Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase

착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안

  • Published : 2005.10.31

Abstract

According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

최근의 건설시장 축소와 주 5일 근무제도, 공기단축형 입찰제도의 도입, 후분양제도의 도입 등의 제도적 변화에 따라 건설 수주 경쟁은 더욱 치열해지고 있다. 그러나 건설공사는 공기지 연을 유발하는 수많은 공정리스크가 존재하고 있으며 이러한 공정리스크에 대한 인식과 그에 따른 체계적인 관리가 부진한 경우 건설공사의 경쟁력을 확보하는 데 여러 어려움이 존재한다. 이러한 문제점을 해결하기 위한 기존 연구는 공정리스크의 분류, 공정 리스크의 관리, 리스크 관리를 위한 시스템 개발에 치중하였다. 이에 본 연구는 전체 공정에 영향력이 크며, 위험발생 확률이 높은 철근콘크리트공사를 대상공종으로 선정하고 기존연구를 바탕으로 수차례의 전문가 면담과 난상토론을 실시하여 현실적인 리스크 요인과 관리방안을 제시하였다.

Keywords

References

  1. Aleshin, A. and Dworatsch, S., Risk Management of Joint Venture Construction Projects of Foreign Cooperation in Russia, PMI 28th Annual Seminars & Symposium, 1997, pp.221-226
  2. Jaafari, A., 'Total Project Risk Management Aided by Information Systems', 12th Internet World Congress on Project Management, Proceedings. Vol. 2, 1994, pp.311-317
  3. Zahedi, F.,' The analytic hierarchy process - a survery of the method and its application.', Interfaces, 16(4), 1986, pp 96-108
  4. Mootanah, D. P., A Holistic Framework for ManagingRisks in Construction Projects, PMI 28th Annual Seminar & Symposium, 1997, pp. 1056-1062
  5. Mullholland, B. and Chritian, J., 'Risk Assessment in Construction Schedules', Journal of Construction Engineering and Management, 1999, pp.8-15
  6. Nasir, D, McCabe, B., and Hartono, L., 'Evaluating Risk in Construction-Schedule Model (ERIC-S): Construction Schedule Risk Model', Journal of Construction Engineering and Management, Vol.129 No.5, 2003, pp.518-527 https://doi.org/10.1061/(ASCE)0733-9364(2003)129:5(518)
  7. Saaty, T. L., The Analytic Hierarchy Process (Planning, Priority Setting , Resource, Allocation), McGraw-Hill, Inc., 1980
  8. Tetsuya Miyagawa, 'Construction Manageability Planning-A System for Manageability Analysis in Construction Planning', Automation in Construction, 1997, pp.175-191
  9. Tommelein, I. D.,'Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique', J. Constr. Engrg. and Mgmt., ASCE, 1998,124(4), pp.279-288 https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(279)
  10. 강인석 외 2인 ,' 건설공사단계별 리스크 인자 중요도에 관한 현황 분석', 대한건축학회 논문집 구조계 제 17권 8호, 2001. 8, pp.103-110
  11. 고성석 외 2인,' 건축공사 공종별 위험도에 관한 연구', 대한건축학회 논문집 구조계 20권 5호, 2004.5, pp.137-144
  12. 김선국 외 2인,' 지식관리스템을 이용한 건축물의 공정리스크 대응방안', 대한건축학회논문집 구조계 21권 1호, 2005. 1, pp.155-162
  13. 류한국, 손실생산성을 고려한 공기지연일수 산정방법, 서울대학교 건축학과 석사학위논문, 2003.2
  14. 박노국, 문희영, 송문익, '품질기능전개와 AHP기법을 이용한 기능평가', 한국품질관리학회, 품질관리학회지, 1993. 12. pp85-92
  15. 서상욱 외 2인, '건축공사 착공 전 단계의 공정리스크 관리 도구 개발-철골공사 중심으로-', 한국건설관리학회논문집 제 6권 1호, 2005. 2, pp.177-185
  16. 윤여완, 양극영, '건축공법별 리스크 인지를 위한 체크리스트 개발에 관한 연구', 대한건축학회 논문집 구조계 17권 4 호, 2001. 4, pp.111-116
  17. 조훈희 외 2인, '공기연장 실태조사를 통한 발주자 중심 공기지연 리스크 대응방안-공공발주 공동주택을 대상으로-', 대한건축학회 논문집 구조계 제17권 12호, 2001. 12, pp.159-166
  18. 한종관 외 2인, '시공자 중심의 주요 공종별 공기지연 원인 분석에 관한 연구-공동주택을 중심으로-', 대한건축학회 논문집 구조계 제19권 3호, 2003. 3, pp.163-170
  19. 홍성욱 외 2인, '국내 건설기업의 리스크 관리의 실태 분석 및 개선방향에 관한연구', 대한건축학회 논문집 구조계 제19 권 5호, 2003. 5, pp.153-160