Abstract
According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.
최근의 건설시장 축소와 주 5일 근무제도, 공기단축형 입찰제도의 도입, 후분양제도의 도입 등의 제도적 변화에 따라 건설 수주 경쟁은 더욱 치열해지고 있다. 그러나 건설공사는 공기지 연을 유발하는 수많은 공정리스크가 존재하고 있으며 이러한 공정리스크에 대한 인식과 그에 따른 체계적인 관리가 부진한 경우 건설공사의 경쟁력을 확보하는 데 여러 어려움이 존재한다. 이러한 문제점을 해결하기 위한 기존 연구는 공정리스크의 분류, 공정 리스크의 관리, 리스크 관리를 위한 시스템 개발에 치중하였다. 이에 본 연구는 전체 공정에 영향력이 크며, 위험발생 확률이 높은 철근콘크리트공사를 대상공종으로 선정하고 기존연구를 바탕으로 수차례의 전문가 면담과 난상토론을 실시하여 현실적인 리스크 요인과 관리방안을 제시하였다.