• Title/Summary/Keyword: actual work cost

Search Result 206, Processing Time 0.037 seconds

Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge (대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로-)

  • Cho, Ji-Hoon;Kim, Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.197-201
    • /
    • 2008
  • Conceptual cost estimates for domestic highway projects have generally been conducted using governmental unit-price references. Inaccuracies in governmental unit-price data has repeatedly addressed in the Korean construction industry which often lead to poor decision making and cost management practices. Thus, needs for developing a better way of conceptual cost estimating has been widely recognized. This research is considered as the first step in developing such model using real-world cost data based on actual construction activities. The data analyzed in this paper includes 41 P.S.C (Prestressed Concrete) Box bridges which broke into 4 categories based on construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). Actual design documents; including actual cost estimating documents, drawings and specifications were carefully reviewed to effectively break down cost structures for PSC girder bridges. Among more than 40 cost categories for each P.S.C girder bridge type, 7 of them were identified which accounted for more than 95% of total construction cost (ILM: 99.47%, MSS: 99.22%, FSM: 98.18%, and FCM: 98.12%). In order to validate the clustering of cost categories, the variation of each cost category has been investigated which resulted in between -1.16 % and 0.59%.

  • PDF

The Improvement of Tunnel Construction Cost Standards Considering the Site Conditions in Korea (현장실태를 고려한 국내 터널공사 공사비산정기준 개선)

  • Ahn, Bang-Ryul;Lee, Han-Soo;Oh, Jae-Hoon;Song, Tae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.26-35
    • /
    • 2020
  • Tunnel construction is an important part of Korean public construction projects. Although the development of various equipment and technologies has led to advances in tunnel construction methods that are implemented on sites, the cost standards related to such works do not yet reflect the realities of the construction sites. A literature review and site surveys were conducted to suggest reasonable cost standards for tunnel work that reflects the realities of the field. First, each item in the cost standards for tunnel work, as established in the Construction Standard Production Rates, were analyzed. The results were compared with the actual costs implemented on tunnel projects. The key items analyzed included those regarding the work cycle time, such as rock classification, profiling survey, drilling speed, and muck-disposal processing equipment combination, as well as the number of people put to tunneling work. Based on the site survey results, improved estimates regarding the cycle time per one tunnel drilling blast, drilling speed of the machine, muck disposal processing equipment combination, and the number of people put to tunneling work were suggested. This study suggests the cost standards that reflect the realities of tunneling sites. The results are expected to help ensure adequate costs for tunnel construction projects.

Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project (사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안)

  • Cho, Tae-Jea;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.9-17
    • /
    • 2011
  • Project delay is one of the most crucial impact factors in the construction process from a schedule and cost management perspective. This study focused on analyzing the causes of concrete frame work delay in the apartment construction project. According to the analysis of project cost composition, the direct cost of concrete works was highest in most samples. Actual delays of concrete works were analyzed for the six different construction components. Causes of delay were grouped into two categories; preconstruction and construction phases and these two groups were further divided into sub-groups. Analysis results revealed that the most significant delay was occurred in the 1st. floor concrete skeleton work. For each delay factor, implications of delay as well as suggestion(s) for reducing the possibility of schedule delay are provided.

Prediction of duration and construction cost of road tunnels using Gaussian process regression

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Abdulhamid, Sazan Nariman;Ibrahim, Hawkar Hashim;Ali, Hunar Farid Hama;Nejati, Hamid Reza;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.1
    • /
    • pp.65-75
    • /
    • 2022
  • Time and cost of construction are key factors in decision-making during a tunnel project's planning and design phase. Estimations of time and cost of tunnel construction projects are subject to significant uncertainties caused by uncertain geotechnical and geological conditions. The Gaussian Process Regression (GPR) technique for predicting ground condition and construction time and cost of mountain tunnel projects is used in this work. The GPR model is trained with data from past mountain tunnel projects. The model is applied to a case study in which the predicted time and cost of tunnel construction using the GPR model are compared with the actual construction time and cost for model validation and reducing the uncertainty for the future projects. In addition, the results obtained from the GPR have been compared with to other models of artificial neural network (ANN) and support vector regression (SVR) that the GPR model provides more accurate results.

Specificity and Commitment: UX approach to Netflix

  • Hwang, Joon Suk;Cheon, Youngjoon;Kwak, Kyu Tae
    • Journal of Internet Computing and Services
    • /
    • v.18 no.6
    • /
    • pp.127-136
    • /
    • 2017
  • The strategy that using data collection from Netflix uses for its services is different from traditional human interaction and the communication, and it is represented by the systematic algorithm that rooted from intelligent information system based on the human interaction and communication. These characteristics allowed the study to reflect the influence of 'Asset specificity' which affects the continuous consumption of the media services of Netflix users through economic psychological analysis based on transactional cost economics. The result from the survey on actual Netflix users, three types of specificity (Space specificity, time specificity, relational specificity) reduced perceived searching cost whereas perceived instrumentality has increased, eventually reinforces the commitment to the service. This implies that the service characteristics of Netflix, trying to communicate with the individuals based on intelligent information system are distinct from the existing platform services and it gives the significance of work very effective for user's continuous consumption of the media services.

A Study on the Secure method of Construction Workspace by using Building Information Modeling (BIM을 활용한 작업공간 확보 방안에 관한 연구)

  • Song, Dong-Hyeon;Lee, Sang-Beom;Song, Ho-San
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.9-10
    • /
    • 2011
  • Domestic construction industry suffered from the IMF and makes a great effort to improve in 'cost management', 'strengthening the competitiveness of the construction industry'. Therefore, the industry has become interested in improving the productivity of construction and ongoing research is being progressed in various angles. In such circumstances, the needs for a study of concepts and space of the actual construction work place is emerging. This study were utilized BIM to understand the types and causes of problems in space during the finishing work in construction and categorize importance and frequency of occurence through a survey of experts and AHP to analyze the realtive effects of importance then modeling to them to aware of issues and give direction for efficient management. This study is anylize the problem which is caused by same time process in finishing work progress of apartment applied by BIM. and categorize the type of work interference management in finishing work, and anylize by the type of occurence then predict the work interference management through in BIM 3D VIEW and suggest the solutions.

  • PDF

An Analysis of Core Competency of Construction Field Engineer for Cost Management (건설기술자의 원가관리 업무역량 분석 연구)

  • Choi, Jae-Hong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.26-34
    • /
    • 2013
  • Recently, many companies recognize the individual human resource as a core asset of the corporate value creation and devote a lot of effort to develop and manage competency-based human resource in order to strengthen the corporate competitiveness. As the integrated construction company taking the major portion in Korean construction industry, its construction engineers perform the construction supervision task with various related parties at each stage of the life cycle of the construction project. Therefore, the competency of a construction engineer is an important factor which have a direct impact on the success of the construction project. However, the current capability evaluation scheme of the domestic construction engineers is mainly oriented on the qualification factors such as the certificates or the seniority and this is quite different from evaluating the actual ability for construction management tasks. In this point of view, this study proposes the appropriate level of proficiency in cost management by analyzing the work process and its detailed items of the cost management that is the one of the basic management items of the construction industry. Based on this, this study analyzes the current competency level of the construction engineer by comparing with the required competency of each job position and also performs the engineer's work competency analysis of each work step.

The Survey of the Current Situation for System Scaffolding in the Domestic Construction Site (국내 건설현장의 시스템비계 사용 실태 조사)

  • Park, Jong-Keun;Jeong, Se-Gyun
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.3
    • /
    • pp.107-111
    • /
    • 2010
  • Recently, the domestic construction companies are increasingly using the scaffolding system in order to secure safety although it may increase the construction cost. However since the actual situation of scaffolding system has not been checked yet, no safety standards and work method were made. Hence, various risk factors are involved in the scaffolding system work. Accordingly, this study is intended not only to check the installation/use status of scaffolding system in the domestic construction sites through the in-depth survey and investigation but also to suggest the measures of using the scaffolding system more effectively and systematically while basing the study results.

A Study on the Standard Method of Measurement Information Communication Field Contractors (정보통신시설공사 수량산출기준에 관한 연구)

  • Seol, Dong-Hwa;Lee, Kwang-Hee
    • Journal of The Institute of Information and Telecommunication Facilities Engineering
    • /
    • v.2 no.4
    • /
    • pp.52-63
    • /
    • 2003
  • This study proposes a change from the currentexpected price integrated system, which is based on the standard of estimated unit manpower and material, to a new actual construction cost integrated system. In order to implement it, the standard method of measurement organization system as well as the communication area standard of estimated unit manpower and material should be changed Moreover, the work breakdown structure and itemized structure should be assorted.

  • PDF

A Study on the Method and Work Measurement for Productivity Improvement of Clothing Products-With concentration in MTM Analysis- (의류제품의 생산성 향상을 위한 방법 및 작업측정에 관한 연구-MTM법을 중심으로-)

  • 김옥경;이순흥
    • Journal of the Korean Society of Costume
    • /
    • v.41
    • /
    • pp.185-206
    • /
    • 1998
  • The purpose of this study was to improve productivity for maximum effects with the present equipments and staff. This study compared and analyzed the mea-sured time by using stop watch method and MTM, which was the new measuring method. The flow and results of this study were as follows: 1. This study investigated the theoretical background the efficiency for production management, and the way of productivity improvement through documentary research. 2. Setting up the standard flow on the experi-mental company production, making out a process chart and measuring the actual working hour. 3. The study measured the allowance time applying work sampling. 4. Each process of the movement analysis was filmed by video to use basic data. 5. MTM analysis was taken by choosing 10 processes from front bodice according to the basic movement of MTM. Through the results, this study exclude unneccesary movements and suggest a method for working ways. 6. Using the actual working hour measured by a stop watch calculated the pitch time and presumed the amount of daily productivity. 7. The result of the work sampling came out as 38% of allowance rate. It was 13% higher than the standard amount of woman's jacket allowance rate, which was 25%. The most influencing factor was work discussion. That was because there were commuication problem of the work way between the operator and leader. More adequate use of flow table and level passing table was needed. There were the problems that inappropriate places and sizes made the distance of movements longer and often needed more adjustment of works and surroundings. To prevent breakdowns equipments check ups were necessary before works. 8. The results of MTM analysis were as follow : the time was reduced 40% than the actual measured time by a stop watch. This was because the leveling of the operator was included in the real calculation. Also, leveling was included in MTM analysis and all the conditions were standarized. Therefore MTM method was a scientidic measuring way of establishing the standard time. The presented method of this study, suggested an ideal method eliminating unneccesary motions, and presented standardization of works. Improvement of working methods, work condition and simplifying motions in each 10 processes reduced the working time from total 656 seconds to 301 seconds. 9. The way and time of working was linked together in the MTM analysis methods. Thus data from MTM help suggest not only establishing standard time but also establishing stan-dard work. Plus it includes various ability for improvements of working ways. So it is an objective method which can be widely used in other work studies. 10. The function of a time study is to determine the amount of work produced with a given method. The work rate is used to establish the cost of labor. The wage of worker must be calculated per unit time which is deter-mined before the time study is made. This study tried to introduce the incentive rule for deciding wages according to the standard time by MTM method.

  • PDF