A Study on the Standard Method of Measurement Information Communication Field Contractors

정보통신시설공사 수량산출기준에 관한 연구

  • Published : 2003.12.01

Abstract

This study proposes a change from the currentexpected price integrated system, which is based on the standard of estimated unit manpower and material, to a new actual construction cost integrated system. In order to implement it, the standard method of measurement organization system as well as the communication area standard of estimated unit manpower and material should be changed Moreover, the work breakdown structure and itemized structure should be assorted.

Keywords