The Improvement of Tunnel Construction Cost Standards Considering the Site Conditions in Korea  

Ahn, Bang-Ryul (Cost Engineering & Management Cernter, Korea Institute of Civil Engineering and Building Technology)
Lee, Han-Soo (Hyeonin PCM)
Oh, Jae-Hoon (Cost Engineering & Management Cernter, Korea Institute of Civil Engineering and Building Technology)
Song, Tae-Seok (Cost Engineering & Management Cernter, Korea Institute of Civil Engineering and Building Technology)
Publication Information
Journal of the Korea Academia-Industrial cooperation Society / v.21, no.8, 2020 , pp. 26-35 More about this Journal
Abstract
Tunnel construction is an important part of Korean public construction projects. Although the development of various equipment and technologies has led to advances in tunnel construction methods that are implemented on sites, the cost standards related to such works do not yet reflect the realities of the construction sites. A literature review and site surveys were conducted to suggest reasonable cost standards for tunnel work that reflects the realities of the field. First, each item in the cost standards for tunnel work, as established in the Construction Standard Production Rates, were analyzed. The results were compared with the actual costs implemented on tunnel projects. The key items analyzed included those regarding the work cycle time, such as rock classification, profiling survey, drilling speed, and muck-disposal processing equipment combination, as well as the number of people put to tunneling work. Based on the site survey results, improved estimates regarding the cycle time per one tunnel drilling blast, drilling speed of the machine, muck disposal processing equipment combination, and the number of people put to tunneling work were suggested. This study suggests the cost standards that reflect the realities of tunneling sites. The results are expected to help ensure adequate costs for tunnel construction projects.
Keywords
Construction Standard Production Rates; Tunnel Construction; Cycle Time; Crew; Specification;
Citations & Related Records
Times Cited By KSCI : 11  (Citation Analysis)
연도 인용수 순위
1 MOLIT (Ministry of Land, Infrastructure and Transport), KICT (Korea Institute of Civil Engineering and Building Technology), Standard of construction estimate for civil, building and machine facility, pp.407-414, 2019
2 Kim, Y. K., Kim, H. M., Lee, S. S., "An analysis of excavation cycle time for Korean tunnels and the comparison with the Standard of Construction Estimate", Journal of Korean Tunnelling and Underground Space Association, Vol 21 Issue 1, pp.137-153, 2019. DOI : https://doi.org/10.9711/KTAJ.2019.21.1.137   DOI
3 Cho, G. C, "Tunnel Excavation Methods Suitable for Reduction of Construction Period", Journal Of The Korean Society Of Civil Engineers Vol. 60 Issue 11, pp.30-39 2012
4 Oh, J. H, Ahn, B. R., "An Analysis on the Revision Factors of Construction Cost Calculation Criteria through Field Survey of Waterproof Work", Journal of the Korea Academia-Industrial cooperation Society, Vol. 20, No. 10 pp. 468-477, 2019. DOI : https://doi.org/10.5762/KAIS.2019.20.10.468
5 Ahn, B. R., Park, T.I,. "Case Study on the Construction Standard Production Rate for Operation and Maintenance Technology", Journal of the Korea Institute of Building Construction, Vol. 19(1), pp. 250-251, 2019
6 Park T.I., Kim K.T., Shin E.Y. "The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project", Korean Journal of Construction Engineering and Management, Vol 20 Issue 2, pp.37-43, 2019 DOI : https://doi.org/10.6106/KJCEM.2019.20.2.037   DOI
7 Kim, H.N., Kim, D.Y., Kim, D-Y., Jeong, S-C, Huh, Y-K "Optimum Construction Duration for Road Tunnel Excavation Works", Journal of the Architectural Institute of Korea Structure & Construction Vol.34 No.4, pp.59-64, 2018 DOI : https://doi.org/10.5659/JAIK_SC.2018.34.4.59   DOI
8 Park, Y-W., Park, H-S., "Development of Tunnel Construction Cost Model Using System Dynamics", The Journal of the Korea Contents Association, Vol 12, Issue 4, pp.468-475, 2012 DOI : https://doi.org/10.5392/JKCA.2012.12.04.468   DOI
9 Cho, J., Kim, K.J., Kim, K., Kim, S.K., "Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors -" Journal of The Korean Society of Civil Engineers, Vol 28 Issue 5D, pp.665-675, 2008
10 Cho, J., Kim, S.K., Kim, K., Kim, K.J., "A Standard Section-Based Approximate Cost Estimating Model on Tunnel (II) - Cost Variance Index Table and Test - " Journal of The Korean Society of Civil Engineers, Vol 28 Issue 5D, pp.677-684, 2008
11 Korea Expressway Corporation, "Expressway Design Practical Data Collection", pp.399-408, 2015