A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF

WBS Development for Acquisition and Analysis of public Housing Productivity Data (공동주택 생산성 데이터 수집/분석을 위한 WBS 개발)

  • Kim, Jae-Woo;Kim, Yea-Sang;Kim, Young-Suk;Kim, Sang-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.86-94
    • /
    • 2008
  • Productivity is one of key management indexes for evaluating soundness of a manufacturing organization and its efficiency. In many aspects of productivity management in the construction industry, however, intuition of an experienced field manager still plays a greater role while productivity data is not utilized efficiently for the construction management purposes, because the collection and analysis of the productivity-related information are not systematic. Lack of systematic method in collecting and analyzing the productivity data results in such problems. The existing WBS should therefore be improved to solve them. The authors developed a new WBS for productivity data collection and analysis by following the research direction that was determined by literature reviews, overseas cases, and interviews with field engineers. The new breakdown structure was then evaluated for its feasibility as a productivity analysis framework. It is expected that the productivity data collected by the WBS will be used for OLAP and mining for future productivity forecast.

Workspace Generation and Interference Optimization Algorithm by Work-type using 3D Model Object in a Construction Project (건설프로젝트의 작업유형별 3차원 작업공간 생성 및 간섭 최적화 방안)

  • Kim, HyeonSeung;Moon, HyounSeok;Kim, ChangHak;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1911-1918
    • /
    • 2014
  • The increase of input resources, such as labor and equipment, in a construction project causes workspace interference between activities and it influences on the productivity and quality of construction activities. To solve this problem, many studies related to the workspace interference have been performed, however they verified the workspace concerning with only the geometric location of activities or generated the shape of workspace by a whole object concept not separated units of detailed operations. It is difficult for project manager to reasonably analyze the workspace conflict, because the size of workspace cannot reflect the characteristics of an activity and input time of a resource. This paper presents a methodology that can generate three-dimensional models in order to optimize the workspace shape and size by considering with the characteristics of each activity and input time of each resource. The suggested method can be used for the active BIM system that optimizes the workspace conflict without additional construction duration and for the searching algorithm of optimized moving path for construction equipment.

IoT Sensor Data Identification based Automation System (IoT 센서 데이터 식별 기반 자동화 시스템)

  • Yu, Donggyun;Kim, Hoyoung;Kim, Jinsung;Im, Seongmin;Jung, Hoekyung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2017.05a
    • /
    • pp.615-616
    • /
    • 2017
  • Recently, research are being conducted to provide an automated environment utilizing various sensors in a place where management is use. However, in an existing automation system environment because the measured sensor data is processed in a batch in the server, than the currently action task there arises a problem that a conflict occurs between task when a task that should operate preferentially occurs. In this paper, we propose a system that provides automation using Sensor Data Identification Algorithm to solve these problems. The algorithm distinguishes between real-time and non-real-time tasks and automatically control tasks what happens after priority is applied. Through this, it is expected that it can reduce manager intervention and reduce unnecessary work operation and power consumption and construct an efficient automation environment.

  • PDF

Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM) (DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구)

  • Kim, Seungho;Kim, Sangyong;Jean, Jihoon;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.151-159
    • /
    • 2016
  • Tower crane (T/C) is one of the major equipment that is highly demanded in construction projects. Especially, most high-rise building projects require T/C to perform lifting and hoisting activities of materials. Therefore, lifting plan of T/C needs to reduce construction duration and cost. However, most lifting plan of the T/C in construction sites has still performed depending on experience and intuition of the site manager without systematic process of rational work. Dependency structure matrix (DSM) is useful tool in planning the activity sequences and managing information exchanges unlike other existing tools. To improve lifting plan of T/C efficiently, this study presents a framework for the scheduling T/C using DSM through the case study in real world construction site. The results of case study showed that the scheduling T/C using DSM is useful to optimize the T/C lifting plan in terms of easiness, specially in the typical floor cycle lifting planning.

An Improved Process System to File a Claim in Construction Projects (건설공사 시 클레임 제기를 위한 프로세스 시스템 개선 방안)

  • Bang, Taewon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.22-32
    • /
    • 2017
  • Judging from the past cases, the contractor has frequently suffered losses caused by disapproved requests or reduced payments since it has not known the conditions of the contract or it has filed a claim to the owner without any proper claim system. Therefore, the existing claim process needs to be reformed. In order to reform the claim process, the contractor should consolidate the organizational structure, grant accurate duty assignments to the claims manager, implement regular staff training on how to deal with claims. In addition to this reformation, the contractor needs to improve the management of construction period and process control, and manage related documents thoroughly. Regular meetings are also necessary in claims. This study attempts to prove the effectiveness of the reformed process applied to Project "A", where the owner was responsible for the delayed supply of materials, inaccurate oral instructions, insufficient information on the work, and frequent changes of design. The project was completed in 96 months, which was extended by 34 months from the initial construction period of 62 months. The reformed claim process is expected to be of great help not only to largescale construction works but also to smallscale ones.

Enhancing the accounting record keeping practices of advanced agricultural managers: Policy implications

  • Myeong, Suhwan;Hong, Seungjee;Yeo, Minsu
    • Korean Journal of Agricultural Science
    • /
    • v.44 no.1
    • /
    • pp.133-143
    • /
    • 2017
  • The purpose of this study was to investigate the status of agricultural management accounting information, education status, and policy demands through a questionnaire survey of advanced agricultural managers. These people are expected to play a key role in the changing agricultural environment in Korea. Based on survey results, several policy implications were derived for the advanced agricultural managers' agricultural management accounting information record activation. Survey results of 303 respondents identified that 63.4% of them record their agricultural management accounting information. The biggest reason given for not recording this information was lack of time for record keeping. The biggest problem was a 'lack of Question and Answer system'. In addition, 37.2% of the respondents were not aware of the current agricultural accounting guidelines. In terms of education, 71.3% of the respondents have completed course work in accounting and responded that an 'On-off parallel education system', which offers both online and offline classes, was the most effective method to prevent dropout. Respondents thought that agricultural management accounting records were helpful for the management of agriculture and their participation in government policies. They also thought that customized education programs should be further implemented for enhancing the effectiveness of education programs, and 'One-stop Question and Answer system on related web sites and organizations' is required for them to keep better records. The following policy implications can be derived from the survey results. First, interoperability between agricultural management accounting information recording programs is needed. Second, accessibility should be strengthened. Third, the education system needs to be improved. Fourth, voluntary participation should be encouraged. Last, the government needs to establish a post-verification system.

Communication Network Analysis of General Corporate IT Staff : A Case Study of Company "K" (일반기업의 IT조직 내 직원간 의사소통 네트워크 분석: K사(社)를 중심으로)

  • Jeong, Cheon-Su;Shin, Kil-Hwan;Han, Woo-Chul
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.11
    • /
    • pp.219-232
    • /
    • 2011
  • The purpose of this study is to give implications for cooperative network building for general corporate IT staffs as well as operational improvement of the IT organization which is a specialized unit in general company though analysis of characteristics of communication networks of the IT organization. 39 IT employees of company "A" were surveyed and interviewed, and the data collected were analyzed in a network analysis method. The analysis shows that a variety of networks were built across employees - e.g. strong/weak ties or centralized/decentralized structure - by each communication area. IT competency network was found weak ties. Career-rela ted network showed centralized and hierarchical characteristics. At the center of each network was positioned manager of each team. To address improvement of the findings, I presented the followings: more active networking over IT competency, enhancement of work centralization and collection of research data as to communication network of IT organization.

A Study on the Management Innovation of the Spot (현장 중심적 경영혁신에 관한 연구)

  • Kim, Gee-Jung
    • Industry Promotion Research
    • /
    • v.2 no.2
    • /
    • pp.23-29
    • /
    • 2017
  • This study aims to suggest a new method to escape crisis of manufacturing industry. We focused on the field - oriented management innovation promotion performance divided into qualitative performance and quantitative performance. The site-centered management innovation is an organization that helps managers to quickly solve the problems faced by field management personnel by switching from manager-centered management method to on-site management personnel-oriented management. Find out the waste factors of the work and improve the process and set the process standards according to the customer's needs. Before working on the site, an employee should know exactly the process standard of what I will do, and frequently inspect the raw materials to make sure they meet the specifications. After the self-inspection is carried out, the standard is reviewed. If there is no abnormality, the cross-validation is carried out by the method which is carried over to the next step. The results of this study can be used to enhance the competitiveness of manufacturing companies. New management innovation techniques are required to adapt to the rapidly changing international business environment, and this study has implications for this research.

A Study on the Formation Process and Sustainability of Community of Practice in Public Libraries (공공도서관 실행공동체의 형성과정과 지속가능성을 위한 연구)

  • Park, Seong-Woo
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.52 no.1
    • /
    • pp.113-131
    • /
    • 2018
  • The study is to prove the necessity of librarian as the coordinator for the building and sustenance of "Community of Practice" in public libraries. Therefore, The study reviews literatures and conducts a survey how librarians think of their work from the perspective of CoP. The results of this study are as follows: "Community of Practice(CoP)" is the kind of community composed of "Domain", "Community" and "Practice" for knowledge circulation; The coordinator neither leader in CoP nor manager outside of CoP is necessary to sustain CoP by supporting management of CoP and promoting knowledge sharing; The programs and clubs designed by public librarians are potential CoPs; The potential CoPs turn into the sustainable CoPs when the participants of programs turn into the directors of programs; It means the coordinator of CoP is librarian in case of public libraries.