1 |
C. A. K. (2008). "2007 Private Construction White Paper" Construction Association of Korea, .
|
2 |
Jeong, W. Y., Eom, S. J., and Paek, J. H. (2005). "A Claims-Management Process model Occurring in Construction Projects" Proceeding of Academic Conference of the Architectural Institute of Korea , 25(1), pp. 185-188.
|
3 |
Kim, I. H., Hong, Y. T., Ryu, H. G., and Lee, H. S. (2004). "A study on identification of the reasons of construction claim failure and proposal of improved methods of claims in the construction company's perspective" Proceeding of Academic Conference of the Architectural Institute of Korea, 24(2), pp. 623-626.
|
4 |
Kim, D. J. (1999). "Analysis Method for Schedule Delay in Construction Projects : Focused on Analyzing Concurrent Delays" MS thesis, Seoul National University.
|
5 |
Lee, J. S., and Kim, W. R. (2009). "A Risk Visualizing Method by Object-oriented Model for Reinforced Concrete Construction" Journal of the Architectural Institute of Korea Structure & Construction, 25(11), pp. 155-162.
|
6 |
Kim, J. H. (1998). "A Construction Delay Claim Analysis Procedure" MS thesis, Chung-ang University.
|
7 |
Kim, J. S., and Lee, J. S. (2005). "Improvement Plan for Domestic Construction Claims & Disputes Resolution Process - Focused on the Construction Bonds" Korean Journal of Construction Engineering and Management, KICEM, 6(4), pp. 181-189.
|
8 |
Lee, J. S. (1998). "Analyzing method of delay-claims due to schedule delay in construction projects" Ph.D. Dissertation, Seoul National University.
|
9 |
Lee, J. S., Lee, G. J., and Kim, M. H. (1995). "A Study on the Analyzing Model for Construction Delay-Claims" Journal of the Architectural Institute of Korea, 11(8), pp. 199-208.
|
10 |
Shin, C. J., Kim, Y. K., Cho, K. M., Hyun, C. T., and Hong, T. H. (2011). "Development of Checklist to Prevent Claim through Dispute Case Analysis of Public Construction Projects" Korean Journal of Construction Engineering and Management, KICEM, 12(1), pp. 13-22.
DOI
|
11 |
Shin, Y. C. (2012). "Improvement of the Calculation Method on the Additional Costs due to Construction Delay" Ph.D. Dissertation, Dongguk University.
|
12 |
Sung, N. W,, Kim, Y. S., Lee, M. Y., and Lee, J. S. (2006). "The Development of a Web-based Decision Support System for Construction Claim Management" KSCE Journal of Civil Engineering, 26(1D), pp. 115-123.
|
13 |
Yun, C. S., and Kim, S. G. (2003). "An Extraction of the Risk Events and Response Strategies based on the Construction Claim Cases in Korea" Journal of the Architectural Institute of Korea Structure & Construction, 19(9), pp. 163-170.
|