• Title/Summary/Keyword: VE evaluation

Search Result 119, Processing Time 0.032 seconds

Calculation Model for Function & Cost Score based on Normalization Method in Design VE (정규화 기법 기반의 설계VE 기능 및 비용 점수 산출 모델)

  • Lee, Jongsik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.98-106
    • /
    • 2015
  • VE aims at reduction in a budget, improvement of function, structural safety and quality security for public construction projects. However, there is possibility for the structural safety and quality security review to be insufficient because related regulations are mostly composed of analysis on economic efficiency of design. In addition, due to the misconception about VE as a cost saving methodology, an alternative is being presented which still focuses mainly on cost saving, but with no objective evaluation of function related to cost. In order to improve this, the government adopted the reduction of life cycle cost and proposal of value improvement, and let people specify the cost and function of the original plan versus the alternative plan, and the value changes between them. However, it is written mainly into practical convenience rather than theoretical basis since a specific way is not suggested. The current method sets a different starting point by applying the attributional difference of function and cost. Furthermore, an evaluation standard for correlating is an important element in rational decision making for assessing and choosing an alternative. This paper analyzes the process and method of function & cost scoring when performing VE and suggests a mathematical normalization model in order to support rational decision making when selecting an optimum plan.

Integrated Information System for Environmental and Economic Evaluation (경제성 환경성 통합평가를 위한 정보통합시스템)

  • Kim, Chang-Hak;Shin, Min Ho;Kang, In Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.615-622
    • /
    • 2010
  • Recent years, the construction projects of a world-wide have changed toward integrated evaluation considering all environmental and economic aspect for ecological construction.. The object of this study is to suggest the method and system for integrated analysis VE/LCC and LCA. In order to integrate and analyze environmental and economic aspects of alternative design elements, decision maker should handle simultaneously much information such as cost, document and drawing. This study presents applicative methods of WBS for integrated management of these information. Also, this study presents a decision support system that can manage DB easily by using VE, LCC and LCA analysis module separately.

A Study on the Selection of Borrow Pits by Using VE Techniques (VE 기법을 이용한 토취장 선정에 관한 연구)

  • Kim, Seung-Ki;Lee, Byung-Suk;Yang, Jae-Hyouk;Lee, Jong-Cheon;Kim, Chan-kee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.1
    • /
    • pp.59-70
    • /
    • 2016
  • The purpose of this study is to review that the VE techniques can be used as a selection tool of borrow pit locations. The analysis of the soil investigation report is performed for the selection of proposed borrow pit site on a large-scale residential development area. Possible earthwork volume of mining is estimated and the weighting matrix evaluation is applied to the VE techniques. After determining the evaluation items for VE assessment, important degree was calculated. The Rating and evaluation of performance is carried out on a proposed borrow pit site. And, development priority has to be decided for a proposed borrow pit sites. As a result, the relative construction cost is closely related to the haulage distance. As the haulage distance increases, the relative construction cost will be increased. Therefore, it was confirmed quantitatively that haulage distance has a significant impact on the select of borrow pits. Also, it was found that the condition of borrow pits itself is important, but it cannot be ignored the impact of the life cycle cost for the selection of optimal borrow pit sites.

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

A Study on the Improvement of Estimation Method of an Appraisal Standard to Select of the Subject in VE. (VE 대상선정을 위한 평가기준 중요도 산정방법 개선에 관한 연구)

  • Kwon Byoung Suk;Lee Dong Jun;Chun Jae Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.291-294
    • /
    • 2001
  • This study has established an appraisal standard to select VE subject when they evaluate of design VE by using of a qualify model in an early design step and has suggested an improvement method for importance's estimation method of an appraisal standard. An importance's estimation method is to arrangement of geometric average method using an AHP method to this study, When an evaluation of a quality model, we estimate an importance by establishing of an appraisal standard of economics, construction, security, environmental influence, maintenance, etc.

  • PDF

Performance Measurement Method for Efficient Value Engineering Study of Railroad Construction Project (철도건설사업의 효율적인 VE수행을 위한 성능측정기법)

  • Lim, Jong-Kwon;Park, Mi-Yun;Park, Heung-Min;Kim, Sung-Hun;Lee, Kwang-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2242-2249
    • /
    • 2008
  • A severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient VE job plan for especially large scale railroad construction project is proposed in this study. This study developed a more objective performance evaluation system for value engineering study of mega projects and suggested a systematic process of performance quantitative analysis for value improvement. The proposed performance measurement method would be very useful for better communication and consensus between decision makers and VE team.

  • PDF

A Study on the Optimum Selection of Railload Line using VE-LCC Analysis - Based on the Optimum Selection of Railway Bridge - (VE-LCC 분석을 통한 철도 노선의 최적안 선정방안 연구 - 교량 선정방안을 중심으로 -)

  • Shin Tae-Kyun;Lee Seung-Hoon;Kwon Jae-Seong;Koo Jeong-San;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.488-493
    • /
    • 2005
  • Railload line design of the railroad construction project should be planed considering the variety of quantitative and qualitative factors, and needs to be selected the optimum altinative weighing from VE/LCC analysis of the planned design. The purpose of this research is for showing selecting plan of the optimum railload line and railway bridge applying VE/LCC analysis in selecting the optimum altinative of railroad construction based on quantitative and qualitative factors, such as initial construction cost, maintenance cost, owner and user's requirements. In this research showed the application plan by each stage using data analysis, function analysis, and alternative evaluation of VE/LCC analysis with AHP and LCC analysis program for the selection. This research is proved the rationality and application of the course of selecting the optimum alternative through case application

  • PDF

Usability Evaluation Model for Locomotion Technology in VR Space (VR 공간에서의 이동기술 평가를 위한 사용성평가 모델)

  • Ding, Xiu Hui;Xie, Qiao;Jang, Young-Jick;Yun, Tae-Soo
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.9
    • /
    • pp.1-9
    • /
    • 2019
  • In this paper, we propose an evaluation model to evaluate the usability of locomotion technologies in a virtual environment (VE; Virtual Environment) and try to verify them through a case study. The order of this study firstly, the factors for analysis are derived through theoretical approach to locomotion technology on VR. Second, the definition and concept of mobile technology and usability evaluation in VR are established theoretically and the elements for analysis are derived through the literature survey through the theoretical approach to VE. Third, based on this, a usability evaluation model is proposed to evaluate locomotion technologies in the VE. Finally, the results are derived by experimenting and analyzing the existing VR games applied with the three locomotion technologies derived from the literature survey. Through this paper, the locomotion technology in VR is not used separately, but can propose mobile technology that conforms to VR game content characteristics by assessing its usability and analyzing it, and it is considered to be a significant data that can suggest criteria for identifying problems in locomotion technology.

A Study on the Function Evaluation using Q. F. D and A. H. P (품질기능전개(品質機能展開)와 A. H. P기법(技法)을 이용(利用)한 기능평가(機能評價))

  • Park, No-Guk;Mun, Hui-Yeong;Song, Mun-Ik
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.2
    • /
    • pp.85-92
    • /
    • 1993
  • This study aimed at the improvement of the conventional methods of Velue Engineering Function Analysis, the most important phase of VE processes, through Quality Function Development and Analytic Hierarchy Process. This study was performed in both theory and study. In the theoretical study, the necessity and the fitness of the connection between VE and QC techniques were studied. The use of Function Requirement Coefficients in Quality Function Development makes the more objective Function Evaluation possible.

  • PDF

Development of VE/LCC Evaluation Model for Railway Route Selection (최적 철도 노선 선정을 위한 VE/LCC 평가 모델 개발)

  • 이동욱;이태식
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.3
    • /
    • pp.215-222
    • /
    • 2004
  • Optimal route selection of railway should take consideration of the function of the railway, topography, practicability of construction and management as well as the cost. This study performed the surveys for experts and surrounding industries and the review for the bid guidelines in order to develop the quality model with the AHP method and establish the weight for each factor. Six quality models were developed for such as the efficiency of railway operation, structure design and practicability, economic feasibility, correspondence with other plans, civil appeal and environmental sustainability, and correspondence with system. The detailed evaluation elements were also derived by each factors.