http://dx.doi.org/10.6106/KJCEM.2015.16.4.098

Calculation Model for Function & Cost Score based on Normalization Method in Design VE  

Lee, Jongsik (Department of Architectural Engineering, Songwon University)
Publication Information
Korean Journal of Construction Engineering and Management / v.16, no.4, 2015 , pp. 98-106 More about this Journal
Abstract
VE aims at reduction in a budget, improvement of function, structural safety and quality security for public construction projects. However, there is possibility for the structural safety and quality security review to be insufficient because related regulations are mostly composed of analysis on economic efficiency of design. In addition, due to the misconception about VE as a cost saving methodology, an alternative is being presented which still focuses mainly on cost saving, but with no objective evaluation of function related to cost. In order to improve this, the government adopted the reduction of life cycle cost and proposal of value improvement, and let people specify the cost and function of the original plan versus the alternative plan, and the value changes between them. However, it is written mainly into practical convenience rather than theoretical basis since a specific way is not suggested. The current method sets a different starting point by applying the attributional difference of function and cost. Furthermore, an evaluation standard for correlating is an important element in rational decision making for assessing and choosing an alternative. This paper analyzes the process and method of function & cost scoring when performing VE and suggests a mathematical normalization model in order to support rational decision making when selecting an optimum plan.
Keywords
Design VE; Function Score; Cost Score; Normalization; Decision Making;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Kwon, Y. J. and Yoo, D. S. (2005). Linear Algebra theory and Application, Intervision.
2 Lim, T. K. and Lee, D. E. (2011). "Developing the Quality and Cost Optimization System for Metal Curtain Wall using Genetic Algorithm and Quality Function Deployment." Journal of the Architectural Institute of Korea Structure & Construction, 27(12), pp. 189-198.
3 Oh, S. J. and Chun, J. Y. (2004)."Study on the Application of Support Model for Collaborative Decision Making in Architectural Design Phase." Journal of the Architectural Institute of Korea Structure & Construction, 20(8), pp. 99-106.
4 Park, H. T., Park, C. S. and Jung, W. S. (2014). "A Study on the Improvement of the Design VE Process using VE Idea-Data Bank System." Korean Journal of Construction Engineering and Management, KICEM, 15(1), pp. 28-38.   DOI   ScienceOn
5 Shin, S. I. (2014). A Study of VE Process to Improve Reliability in Construction VE, Inha Univ.
6 Yang, J. K. and Kim, Y. S. (2005). "Improvement and Systematization of Pre-Study Work for Design Value Engineering in Construction Projects by Quality Function Deployment." Korean Journal of Construction Engineering and Management, KICEM, 6(4), pp. 122-132.
7 Younker, D. L. (2007). Value Engineering Analysis and Methodology, Marcel Dekker, Inc.
8 Zeleny, M. (1982). Multiple Criteria Decision Making, New York : McGrow-Hill
9 Cho, H. M., Hyun, C. T., Hong, T. H., Sim, J. G. and Moon, H. S. (2010). "Development of VE Suggestion Form for Post-management of Multi-family Housing VE Proposals." Journal of the Architectural Institute of Korea Structure & Construction, 26(6), pp. 111-119.
10 Choi, I. S. et al. (2009). "A Study on Procedures and Methods for Evaluating VE Alternatives at Design Phase in Construction Projects." Korean Journal of Construction Engineering and Management, KICEM, 10(4), pp. 129-138.
11 Cui X. (2009). Evaluation of Speculation in Analysis Phase for Value Engineering of Shopping Mall By Analyzing the Problems of the Job plan in Construction, Chungbuk National Univ.
12 Diakoulaki, D. and Kounmoutsos, N. (1991). "Cardinal Ranking of Alternative Action : Extension of the PROMETHEE Method." European Journal of Operational Research, 54, pp. 337-347.
13 Hwang, C. L. and Yoon, K. (1981). Multiple Attribute Decision Making Methods and Applications : A state of The Art survey, New York : Springer-Verlag.
14 Kang, J. H. (2008). Study on the Plan to Carry out Cost down with Optimization of Performance of Each Components and Elements in Building, Hanyang Univ.
15 Kim, H. Y. (2000). Study on the Evaluation Method for the Optimum Alternative Selection in the VE Study, Univ. of Seoul.
16 Kim, S. B. and Choi, J. W. (2004). "Assessment of Design Phase VE Process and Its Impacts." Journal of the Korean Society of Civil Engineers, 24(5), pp. 749-757.
17 Kim, S. H., Kim, B. H. and Kim, J. K. (2009). Decision Marking Analysis and Application, Youngchi.
18 Kwon, T. S. (2003). A Study on the Methodology to Select Optimum Choice for Construction Value Engineering, Yonsei Univ.