A Study on the Selection of Borrow Pits by Using VE Techniques |
Kim, Seung-Ki
(C.G Engineering & Consulting Co., Ltd.)
Lee, Byung-Suk (Dept. of Civil Engineering, Chonbuk National University) Yang, Jae-Hyouk (Korea Development Corporation) Lee, Jong-Cheon (Dept. of Civil Engineering, Dongkang College) Kim, Chan-kee (Dept. of Civil Engineering, Daejin University) |
1 | Alphonse, J. D. (1999), Value Engineering: Practical Applications for Design, Construction, Maintenance & Operations, Kingston ; R.S. Means Company, pp.231-244. |
2 | Arratia, B. A. (1998), A FAST-Driven Approach to New Production Planning, SAVE International Annual Conference Proceedings, pp.247-264. |
3 | Caltrans (1999), Value Analysis Report Guide, USA, pp.146-188. |
4 | Kelly, J. and Male, S. (2001), A Quick Approach to Task FAST Diagrams, SAVE International Annual Conference Proceedings, pp.261-270. |
5 | KICT (2000), A study on substantial operational techniques of construction VE, pp.86-90. |
6 | Saaty, T. (1980), The Analytic Hierarchy Process, New York ; McGraw-Hill, pp.78-92. |
7 | Warwick, T. (1994), Function Analysis for Team Problem Solving, SAVE International Annual Conference Proceedings, pp.127-132. |