Selecting a railroad line requires the comparative evaluation of various elements. As a systematic approach to this selection it will be necessary to apply the VE study and the LCC analysis. This study proposes a methodology for selecting the optimum line of the ralroad using VE-LCC analysis. The VE study is performed by following four steps : Information analysis, Function analysis, Alternative evaluation, and Optimum plan selection. The economics evaluation in VE study is using LCC analysis and Sensitivity analysis. Cost items in LCC analysis are classified into bridge, tunnel, rail, and earthwork. We could select the optimum alte-rnatives considering not only cost elements hut also various evaluation element in VE-LCC analysis. The synthetic evaluation process of relative value composition and weighted matrix evaluation
Korean Journal of Construction Engineering and Management
/
v.9
no.4
/
pp.154-162
/
2008
Ministry of construction and transportation has been enforcing extensionally design phase VE(Value Engineering) to the construction costing more than 10 billion won, an importance of design phase VE accordingly is raising to get rid of a waste of cost and noneffective factors previously in construction projects. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, present competency factors of design phase VE to highly raise the output through organizing an effective team at the beginning stage of design phase VE. Find out 29 competency factors through characteristics of design VE team for the check list, classify by team knowledge, team work skill, and team attitude. Get an efficiency regarding importance and find out Competency Evaluation items of design VE team, present a Competency Evaluation plan for indicating an objective standard to Competency Evaluation by measuring relative importance as to each Competency Evaluation item.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.5
/
pp.881-889
/
2016
The VE evaluation process, in which the value is composed of the cost and the function, should have a characteristic of quantitative analysis based on specific figures rather than qualitative approach. However, most of the VE evaluation performed domestically have a problem of having no systematic process of quantification of the function, even though the cost is estimated and analyzed quantitatively. Moreover, in addition to the tendency of strong practical experience, the VE evaluation has the problem of limited application of practical scientific analysis caused by declining the suggestion of creative opinions by over quantification or over objectification. This paper presents the suggestions for improvement of VE evaluation processes, which satisfies the aspects of simplification and objectification, without hindering the essence of the evaluation in the practical business point of view.
Since its introduction in Korea, design VE has widely been used as a means to enhance values in the construction industry. However, a greater emphasis is still placed on cost reduction in approach attitudes and performance evaluations on the implementation of design VE. In this regard, this study presented a performance evaluation method for cost, function, and value of VE proposals. Numerical criteria on the increase and decrease of cost and function that can classify the value enhancement type of VE proposals were proposed based on the performance evaluation method. It is expected that the use of numerical criteria for the type classification of VE proposal, and cost and performance evaluation method proposed in this study will make it possible to conduct a clear and more intuitive evaluation of VE proposal. However, it is appropriate to use the numerical criteria as a guideline to apply the new performance evaluation method for VE proposals. Therefore, it is necessary to conduct a statistical analysis with a wider range of users after the repeated application of the findings of this study, and thus to carry out research for presenting the numerical criteria for various types of users.
International conference on construction engineering and project management
/
2009.05a
/
pp.1195-1200
/
2009
Two important concepts in VE are "function" and "cost." Cost can be expressed quantitatively. Unlike cost, the function can only be expressed qualitatively. Thus, to accurately evaluate the performance in VE analysis, it is required that the functional aspect should be considered a qualitative one. This study suggests a procedure of function oriented evaluation which can evaluate function enhancement of a VE proposal more logically and objectively. To conduct this study, problems were induced via case analysis, and solutions were found. In addition, the existing simple evaluation procedures were corrected, and a function enhancement evaluation procedure via function classification was suggested. For function classification, the use of the concepts, which were "intended function" and "additionally obtained function," was suggested. Function oriented evaluation procedure to VE proposals which is suggested in this study is expected to be a great help in treating valuable functions through VE job plan.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.797-800
/
2007
Value Engineering(VE) is being applied as an useful tool to eliminate the waste of cost and noneffective factors previously in construction projects. Ministry of construction and transportation' has been accordingly enforcing extensionally design phase VE to the construction costing more than 10 billion won, an importance of design phase VE. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, try to find out competency factors of design phase VE to enforce a competency of VE team as a basic database for developing a check list, and estimate weight. For the result, find out a competency evaluation item and organize as a team knowledge, a team work skill and a team attitude. Perform a first survey to verify a reliability and propriety regarding the found competency evaluation, perform the second survey competency as to evaluation item of the found 1, 2, 3 class and then estimate the weight by AHP.
Korean Journal of Construction Engineering and Management
/
v.10
no.4
/
pp.129-138
/
2009
The role and importance of VE have been enlarged since VE application was mandatory by law in public sector in March, 2000. Public organizations have widened the technological horizon through VE competitions and applied VE technique to private investment projects. Many studies have been carried out on function analysis and VE procedure. In practice it is common that clients make a decision one-sidedly on whether or not VE proposals are selected. The VE procedure itself is not smooth. This study gives some suggestions on VE appraisal procedure and criteria at the last phase on VE process in order to smooth the progress of VE. The results of this study can be used as a tool to improve efficiency in the management of VE.
Korean Journal of Construction Engineering and Management
/
v.16
no.3
/
pp.3-10
/
2015
Value engineering (VE) of the construction project is classified into design phase value engineering and construction phase value engineering. Design phase value engineering must apply to over 10 billion public construction projects by government law. Therefore, the design value engineering apply to actively in construction projects. In contrast, the construction value engineering apply to a limited certain construction project. The reason is that construction value engineering process can not reflect practical demands quality. The construction value engineering can implement to positive impact through the feasibility verification for constructability. In this research, we propose a method of construction value engineering that reflect the practical demands. This method is experts alternative evaluation of using by GFI-based. And, this study was applied to the practical cases to verify the applicability of the proposed method. As a result, proposed alternative evaluation method were analyzed highly efficient in terms of applying the process as well as the method compare to the conventional method.
KSCE Journal of Civil and Environmental Engineering Research
/
v.39
no.6
/
pp.923-932
/
2019
VE is used as a powerful tool to add value to facilities by improving functionality and reducing costs. By identifying the client's requirements in the VE process and reflecting them in the quality model, the developed alternatives meet the client's requirements. However, there is no process to verify how the developed alternatives reflect the needs of the client through functional analysis, idea generation and evaluation. The purpose of this study was to develop, verify, and prove the effectiveness of a methodology for evaluating client satisfaction with alternatives developed during the VE Job Plan. The KANO model, which can identify the satisfaction and dissatisfaction of requirements in product planning, was set as a methodology for alternative verification procedures of VE, and was improved and applied to the purpose of this study. As a result, the alternative evaluation method developed in this study was found to be useful. It is expected that the KANO model will be used to evaluate the satisfaction of VE alternatives in the VE Job Plan analysis.
Park, Jin-Ho;Jin, Zheng-xun;Hyun, Chang-taek;Kim, Hyun-joo;Kwon, Suk-hyun
Korean Journal of Construction Engineering and Management
/
v.19
no.5
/
pp.32-42
/
2018
Since the success or failure of VE projects depends on the capabilities of participants, including owners, construction managers, architects, general contractors and VE experts, it is important to follow systematic procedures. However, it is often the case that only a rough evaluation is performed, or the rough and detailed evaluations are integrated in actual VE tasks. In this case, it is difficult to analyze and evaluate the alternatives in terms of risk, even for the important alternatives. This in turn leads to the so-called returning alternatives where the alternatives proposed in the preceding stage are returned to the original plans in the following stage, and thus the repetitive work for the alternatives often decreases the efficiency of the VE task. In this regard, this study proposed a risk assessment process for VE alternatives in order to minimize the occurrence of returning alternatives based on the systematic analysis and evaluation of VE alternatives. It will increase the efficiency of VE tasks by reduces the number of regression alternatives.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.