Improvement of the Evaluation Method for VE Alternatives using the Risk Assessment Process |
Park, Jin-Ho
(Kumho E&C)
Jin, Zheng-xun (Department of Architectural Engineering, University of Seoul) Hyun, Chang-taek (Department of Architectural Engineering, University of Seoul) Kim, Hyun-joo (Department of Global Construction, International School of Urban Sciences, University of Seoul) Kwon, Suk-hyun (DMCM) |
1 | Choi, I. S. (2008). "A Study on Procedures and Methods for Evaluating VE Alternatives at Design Phase." MS thesis, University of Seoul, Seoul. |
2 | Choi, S. Y., and Kim, S. B. (2005). "Suggestions for Improvement of Construction VE Application Effect." Korean Journal of Construction Engineering and Management, KICEM, 6(2), pp. 28-31. |
3 | Harold, R. K. (2009). Project Management-Approach to Planning, Scheduling, and Controlling, 10th Edition, Wiley, New Jersey. |
4 | Kang, S. B., and Kim, S. C. (2016). "A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK -." Korean Journal of Construction Engineering and Management, KICEM, 17(1), pp. 48-55. DOI |
5 | Kim, J. H. (2009). "Function Oriented VE Alternatives Evaluation Procedure using Function Classification." MS thesis, University of Seoul, Seoul. |
6 | Kim, M. H. et al. (2005). Construction Engineering and Management, Kimoondang, Seoul. |
7 | Kim, S. Y., Lee, Y. R., and Yang, J. K. (2015). "Alternative Evaluation Method of GFI-based Construction Value Engineering." Korean Journal of Construction Engineering and Management, KICEM, 16(3), pp. 3-10. DOI |
8 | Kwon, T. S. (2004). "A Study on the Methodology to Select Optimum Choice for Construction Value Engineering." PhD Dissertation, YonSei University, Seoul. |
9 | Park, B. S. (2013). "Structure Modeling for Risk Factors of Urban Regeneration." MS thesis, University of Seoul. |
10 | Project Management Institute (2009). Practice Standard for Project Risk Management, Project Management Institute. |
11 | Son, M. J. (2008). "The Development of a Practicability Evaluation Model on VE Proposals using the Scenarios Planning and the Fuzzy Analytic Hierarchy Process." MS thesis, University of Seoul, Seoul. |
12 | The Chartered Institute of Building (2002). Code of Practice for Project Management for Construction and Development. 3rd ed. |
13 | The Ministry of Land, Infrastructure and Transport (2013). VE implementation manual. |
14 | Washington State Department of Transportation (2014). Project Risk Management Guide. |
15 | Wideman, R. M. (1986). "Risk Management." Project Management Journal, 17(4), pp. 20-26. |
16 | Yu, K. H. (2014). "Enhancement Method of Acceptance Rate of Function Improvement Type Alternatives in Development Phase of Value Engineering." MS thesis, University of Seoul, Seoul. |
17 | Cho, J. K. (2012). "Risk Factor Classification and Weight Estimation for Urban Regeneration Project." MS thesis, University of Seoul, Seoul. |