• Title/Summary/Keyword: Testing Equipment

Search Result 857, Processing Time 0.032 seconds

A Study on the Development of Switching Power Supply for testing communication equipment (통신장비 시험용 Switching Power Supply 개발에 관한 연구)

  • Bae, Jin-Yong;Kim, Yong;Kwon, Soon-Do;Han, Kyung-Tae;Lee, Dong-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2003.04a
    • /
    • pp.253-257
    • /
    • 2003
  • This paper presents the Development of Switching Power Supply for testing communication equipment. The communication equipment need many kinds of voltage(-48V,27V,12V,5V,3.3V), and in case of low voltage needs large current($10{\sim}20A$). The previous Linear Power Supply was very heavy, has low efficiency and poor power-factor for testing communication equipment. This development has good efficiency and high power-factor using switch mode power supply technique. This Development of Switching Power Supply is composed of eight converters. The principles of operation, feature, and design considerations are illustrated and verified through the experiment with 600W prototype.

  • PDF

A Study on Image Processing Algorithm fur Inspection of LCD Panel (LCD Panel 불량 검사를 위한 영상처리 알고리즘 연구)

  • Cho S.Y.;Ko K.W.;Ko K.C.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.59-60
    • /
    • 2006
  • It is bringing out the importance of automated LCD testing equipment that satisfy a definite quality, confidence and testing speed, as LCD enterprises are recently expanding the production and facility investment in proportion to the sudden increase of LCD demand. So far, LCD inspection is however conducted by manual, or the confidence of existing testing equipment falls short of LCD enterprises's standard. It is therefore important to develop the testing equipment that determines the quality of product for production of an excellent LCD.

  • PDF

A Study on the Improvement of Performance Testing System of Domestic Surveying Equipment (국내 측량장비 성능검사제도 개선방안 연구)

  • MIN, Kwan-Sik
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.19 no.1
    • /
    • pp.53-63
    • /
    • 2016
  • In this paper, we proposed the improvements for performance test and surveying equipment regulations, standards, methods and procedures, depending on the need of improving the legal system for surveying equipment in a diverse and sophisticated surveying industry. This research was performed first investigating the existing legal systems(Act on the establishment and management of spatial data, Framework act on national standards, ISO 17123, JIS B 7912) with respect to the surveying equipment performance testing and the research for IOS and KOLAS suggested the improvements on the application for the surveying equipment performance testing standard. More exactly, first, two years were presented for the surveying equipment performance testing cycle considering the precise accuracy of the instrument stability, purpose and frequency of use, etc. Second, the abolition of the measurement distance by grade and the upward or cross-grade adjustment of the single prism standards about the light wave rangefinder and total station were suggested for the improvement on survey equipment performance criteria. Third, since the main function of total station is focused on a three-dimensional coordinate measurement due to the improvement of surveying equipment performance testing, it was proposed to use the precision(repeatability) of the coordinate measuring method as an evaluation method.

Lifetime Prediction of Geogrids for Reinforcement of Embankments and Slopes through Time-Temperature Superposition

  • Koo, Hyun-Jin;Kim, You-Kyum;Kim, Dong-Whan
    • Corrosion Science and Technology
    • /
    • v.4 no.4
    • /
    • pp.147-154
    • /
    • 2005
  • The creep resistance of geogrids is one of the most significant long-term safety characteristics used as the reinforcement in slopes and embankments. The failure of geogrids is defined as creep strain greater than 10%. In this study, the accelerated creep tests were applied to polyester geogrids at various loading levels of 30, 50% of the yield strengths and temperatures using newly designed test equipment. Also, the new test equipment permitted the creep testing at or above glass transition temperature($T_g$) of 75, 80, $85^{\circ}C$. The time-dependent creep behaviors were observed at various temperatures and loading levels. And then the creep curves were shifted and superposed in the time axis by applying time-temperature supposition principles. The shifting factors(AFs) were obtained using WLF equation. In predicting the lifetimes of geogrids, the underlying distribution for failure times were determined based on identification of the failure mechanism. The results confirmed that the failure distribution of geogrids followed Weibull distribution with increasing failure rate and the lifetimes of geogrids were close to 100 years which was required service life in the field with 1.75 of reduction factor of safety. Using the newly designed equipment, the creep test of geogrids was found to be highly accelerated. Furthermore, the time-temperature superposition with the newly designed test equipment was shown to be effective in predicting the lifetimes of geogrids with shorter test times and can be applied to the other geosynthetics.

Efficient Multi-site Testing Using ATE Channel Sharing

  • Eom, Kyoung-Woon;Han, Dong-Kwan;Lee, Yong;Kim, Hak-Song;Kang, Sungho
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.13 no.3
    • /
    • pp.259-262
    • /
    • 2013
  • Multi-site testing is considered as a solution to reduce test costs. This paper presents a new channel sharing architecture that enables I/O pins to share automatic test equipment (ATE) channels using simple circuitry such as tri-state buffers, AND gates, and multiple-input signature registers (MISR). The main advantage of the proposed architecture is that it is implemented on probe cards and does not require any additional circuitry on a target device under test (DUT). In addition, the proposed architecture can perform DC parametric testing of the DUT such as leakage testing, even if the different DUTs share the same ATE channels. The simulation results show that the proposed architecture is very efficient and is applicable to both wafer testing and package testing.

Development and Installation of Large-scale Geotechnical Testing Facilities (대형 지반시험장비의 개발 및 구축)

  • Seo, Min-Woo;Ha, Ik-Soo;Kim, Yong-Seong;Park, Dong-Soon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1233-1240
    • /
    • 2005
  • As the geotechnical technologies have grown, the size of civil structures has become bigger than before, thereby requiring large-scale geotechnical testing equipments which can evaluate the mechanical behavior of large size testing materials such as gravel, crushed rock and so on. These kind of large testing equipments are usually used to evaluate the mechanical characteristics of large size material which are applied in the large infra structures like dam, seashore structure, coastal landfill, soil-structure interaction and seismic response of large-scale structure. In this research, state-of-the-art information in the field of geotechnical engineering was collected and summarized for such large-scale experimental equipments as large-scale geo-centrifuge, large-scale triaxial testing machine, large-scale direct shear testing apparatus and large-scale oedometer.

  • PDF

Accelerated Creep Testing of Geogrids for Slopes and Embankments: Statistical Models and Data Analysis

  • Koo, Hyun-Jin;Kim, You-Kyum;Kim, Dong-Whan
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2004.07a
    • /
    • pp.227-232
    • /
    • 2004
  • The failure of geogrids can be defined as an excessive creep strain which causes the collapse of slopes and embankments. In this study, the accelerated creep tests were applied to two different types of polyester geogrids, at 75, 80, 85$^{\circ}C$ by applying 50% load of ultimate tensile strengths using a newly designed test equipment which is allowed the creep testing at higher temperatures. And then the creep curves were shifted and superposed in the time axis by applying time-temperature supposition principles. In predicting the lifetimes of geogrids, the underlying distribution for failure times were determined based on identification of the failure mechanism. The results indicate that the conventional procedures with the newly designed test equipment are shown to be effective in prediction of the lifetimes of geogrids with shorter test times. In addition, the predicted lifetimes of geogrids having different structures at various creep strains give guidelines for users to select the proper geogrids in the fields.

  • PDF

The transient analysis for choosing the optimal SCR ratings of AC3 utilization category testing equipment used for electrical durability test for magnetic switch (IEC60947-4에 따른 전자개폐기 전기적 수명시험설비의 과도현상을 고려한 SCR최적 정격선정에 대한 연구)

  • Ryu Haeng Soo;Kim Kab Dong;Han Gyu Hwan
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.354-356
    • /
    • 2004
  • This paper is the transient analysis for choosing the optimal SCR ratings of AC3 utilization category testing equipment(AC3 TE) used for electrical durability test for magnetic switch according to IEC60947-4 Annex B by utilizing EMTP -ATPDraw. Magnetic contactor closes and opens the motor load with ON/OFF switch of electronic contactor. It is also used for protecting and controlling the load. Magnetic contactor detects the over-current flow in the load with a over-current relay and disconnects the load by opening its control power. The key cost of AC3 TE is the SCR ratings. The more decreases SCR ratings, the more decreased the cost is, but it is impossible to ensure the reliability. On the other hand, the more increases SCR ratings, the more increased the cost is. Thereupon, in this paper after the testing circuit is simulated by using EMTP-ATPDraw the SCR ratings will be applied in order to guarantee the testing reliability of PT&T(Power Testing and Technology institute in LG Industrial Systems Co.,Ltd.).

  • PDF