• Title/Summary/Keyword: Site risk management

Search Result 407, Processing Time 0.022 seconds

A Basic Study on Quantification Risk Model of Human Accidents on Exterior Construction Site in South Korea (국내 건설현장 내·외부 인명사고 리스크 정량화 모델 개발 기초연구)

  • Oh, Jun-Seok;Ha, Sun-Geun;Kim, Tae-Hee;Jeon, Sang-Sub;Kim, Ji-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.132-133
    • /
    • 2018
  • Many studies regarding construction safety management have been conducted. However, it is insufficient to research on external construction site. As a result, ordinary people around the construction site have injured and have a negative view when they think construction industrial since it has regarded having an overfull industrial accidents on media. To break the stereotype and prevention of accident on construction industry have been emphasized at this point in time, it is necessary to establish a comprehensive safety management system which is considered not only internal safety management but also external safety management. Therefore, the objective of this study is to develop the human accident risk quantification model by utilizing the third party payout data which occurred by incomplete safety management on external construction site. This study is conducted as a basic study for developing safety management manuals on internal·external construct site. In the future, it is expected to be used as a reference.

  • PDF

Development and Enhancement of Conceptual Site Model for Subsurface Environment Management (지중환경 관리를 위한 부지개념모델 구축 및 개선)

  • Bae, Min Seo;Kim, Juhee;Lee, Soonjae;Kwon, Man Jae;Jo, Ho Young
    • Journal of Soil and Groundwater Environment
    • /
    • v.27 no.spc
    • /
    • pp.1-18
    • /
    • 2022
  • A conceptual site model is used to support decision-making of response strategy development, determination, and implementation within a risk-based contaminated site management system. It aims to provide base information of the relevant site characteristics and surface/subsurface conditions in order to understand the contaminants of concern and the associated risk they pose to the receptors. This study delineated the technical details of conceptual site model development, and discussed the possibility of applying it in domestic subsurface contamination management. Conceptual site models can be developed in various formats such as tables, diagrams, flowcharts, and figures. Contaminated sites are managed for a long period of time following the steps of investigation, remediation design, remediation, verification, and post-remedation management. The conceptual site model can be enhanced in each stage of the contaminated site management based on the continuously updated information on the site's subsurface environment. In the process of enhancement for conceptual site model, precision is gradually improved, and it can evolve from a conceptual and qualitative form to a more quantitatvive and three-dimensional model. In soil pollution management, it is desirable to incorporate the conceptual site model into the soil scrutiny system to better assess the current status of the contaminated site and support follow-up investigation and management.

Multi-unit risk assessment of nuclear power plants: Current status and issues

  • Yang, Joon-Eon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1199-1209
    • /
    • 2018
  • After the Fukushima-Daiichi accident in 2011, the multi-unit risk, i.e., the risk due to several nuclear power plants (NPPs) in a site has become an important issue in several countries such as Korea, Canada, and China. However, the multi-unit risk has been discussed for a long time in the nuclear community before the Fukushima-Daiichi nuclear accident occurred. The regulatory authorities around the world and the international organizations had proposed requirements or guidelines to reduce the multi-unit risk. The concerns regarding the multi-unit risk can be summarized in the following three questions: How much the accident of an NPP in a site affects the safety of other NPPs in the same site? What is the total risk of a site with many NPPs? Will the risk of the simultaneous accidents at several NPPs in a site such as the Fukushima Daiichi accident be low enough? The multi-unit risk assessment (MURA) in an integrated framework is a practical approach to obtain the answers for the above questions. Even though there were few studies to assess the multi-unit risk before the Fukushima-Daiichi nuclear accident, there are still several issues to be resolved to perform the complete MURA. This article aims to provide an overview of the multi-unit risk issues and its assessment. We discuss the several critical issues in the current MURA to get useful insights regarding the multi-unit risk with the current state art of probabilistic safety assessment (PSA) technologies. Also, the qualitative answers for the above questions are addressed.

Joint Reasoning of Real-time Visual Risk Zone Identification and Numeric Checking for Construction Safety Management

  • Ali, Ahmed Khairadeen;Khan, Numan;Lee, Do Yeop;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.313-322
    • /
    • 2020
  • The recognition of the risk hazards is a vital step to effectively prevent accidents on a construction site. The advanced development in computer vision systems and the availability of the large visual database related to construction site made it possible to take quick action in the event of human error and disaster situations that may occur during management supervision. Therefore, it is necessary to analyze the risk factors that need to be managed at the construction site and review appropriate and effective technical methods for each risk factor. This research focuses on analyzing Occupational Safety and Health Agency (OSHA) related to risk zone identification rules that can be adopted by the image recognition technology and classify their risk factors depending on the effective technical method. Therefore, this research developed a pattern-oriented classification of OSHA rules that can employ a large scale of safety hazard recognition. This research uses joint reasoning of risk zone Identification and numeric input by utilizing a stereo camera integrated with an image detection algorithm such as (YOLOv3) and Pyramid Stereo Matching Network (PSMNet). The research result identifies risk zones and raises alarm if a target object enters this zone. It also determines numerical information of a target, which recognizes the length, spacing, and angle of the target. Applying image detection joint logic algorithms might leverage the speed and accuracy of hazard detection due to merging more than one factor to prevent accidents in the job site.

  • PDF

Project Risk Management & Observational Method for soft ground improvement (연약지반을 대상으로 한 프로젝트 리스크와 현장계측의 과제와 대책)

  • Imanishi, Hajime
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.509-514
    • /
    • 2006
  • Considering the risk management, there are many examples and various studies for the corporation risk. However, I have never seen the project risk management that applied a construction site for practical approach. Therefore, I have developed a chart (I-Chart) for the project risk management, and also built a model (I-Chart scenario analysis) that I could use. I applied this model to container yard reclaimed land in harbor construction with approaching of geotechnical engineering.

  • PDF

Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method (FMECA 기법을 적용한 건설현장 거푸집작업의 통합 안전위험성 평가 및 대응방안 마련)

  • An, Sun-Ju;Song, Sang-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.39-48
    • /
    • 2012
  • Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.

A Study on the Optimization Effectiveness of Risk Assessment in Construction Industry (건설업 위험성 평가 실효성을 위한 최적화 연구)

  • Paek, Chung Hyeun;Cho, Ur Ryong
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.15-22
    • /
    • 2015
  • The risk assessment carried out on the construction site at the beginning of the implementation depends on the subjective judgment of risk of general contractor and subcontractors, whose opinion about frequency and intensity of risk is different. In this paper, research the awareness of general contractors and subcontractors about process of risk assessment at the construction site and its effectiveness. Researching of the main factors "frequency", "intensity" which determines the degree of risk gives the opportunity to find an option for improving the effective implementation of risk assessment.

A Study on the Research & Analysis of the Health and Safety Managing's Understanding on the Applied Construction Work Site Risk Assessment - Focus on Site Manager & Manager - (건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로-)

  • Choi, Soo-Hwan;Kim, Chi-Kyung
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.4
    • /
    • pp.62-67
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

Identifying Potential Opportunities of BIM for Construction Risk Management (BIM을 이용한 건설리스크 해결 가능성 도출)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.201-202
    • /
    • 2019
  • This paper aimed to identify potential opportunities of building information modeling (BIM) utilization for construction risk management. Construction risk factors and BIM functions were derived through conducting in-depth literature review. Nineteen construction risk factors could be resolved by various BIM functions. Phase planning, site analysis, design authoring, and 3D design coordination were identified as the most efficient BIM functions for construction risk management.

  • PDF

Development of a Quantified Risk Prediction Process for Workers in Construction Projects ConsideringSite Conditions and Accident Cases (현장조건과 사고사례를 반영한 건설사업 근로자의 정량화된 위험도 예측 프로세스 개발)

  • Jung, Changhoon;Jang, Jiyoung;Park, Sangwon;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.94-95
    • /
    • 2019
  • Recently, the importance of prevention has emerged for the management of construction safety accidents.. Accordingly, this study collects and quantifies various risk factors at the construction site to represent them as direct risks and to create a predictive process for prevention in advance. These risk figures can be used as comprehensive safety figures to reflect current site conditions and past accidentt cases. The prevention of industrial accidents is managed in advance through the development of applications thatt quantify and predict the risks of individuals working at construction sites. The purpose of the project is to reduce industrial accidents in the construction industry by supporting safety management of site managers and workers.

  • PDF