Browse > Article
http://dx.doi.org/10.12812/ksms.2015.17.3.15

A Study on the Optimization Effectiveness of Risk Assessment in Construction Industry  

Paek, Chung Hyeun (Dept. of Materials Engineering, Korea University of Technology and Education)
Cho, Ur Ryong (Dept. of Materials Engineering, Korea University of Technology and Education)
Publication Information
Journal of the Korea Safety Management & Science / v.17, no.3, 2015 , pp. 15-22 More about this Journal
Abstract
The risk assessment carried out on the construction site at the beginning of the implementation depends on the subjective judgment of risk of general contractor and subcontractors, whose opinion about frequency and intensity of risk is different. In this paper, research the awareness of general contractors and subcontractors about process of risk assessment at the construction site and its effectiveness. Researching of the main factors "frequency", "intensity" which determines the degree of risk gives the opportunity to find an option for improving the effective implementation of risk assessment.
Keywords
Risk assessment; Frequency; Intensity; Construction;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Yong-Ha, Seo(2012), "Research on effectiveness of risk assessment of construction industry", Incheon National university
2 Appendix 1 in enforcement ordinance of Framework Act on the Construction Industry(2007),"Type and work scope of construction business"
3 Byoung-Su, Kang(2002),"A study on the present conditions and prevention of accident occurred in the construction field", Dong Eui University