AN EXAMPLE OF REPRESENTING THREE LEVEL'S SCHEDULES WITHIN SCHEDULE HIERARCHY BY BDM TECHNIQUE

  • Seon-Gyoo Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.445-452
    • /
    • 2011
  • The schedule hierarchy in construction project is generally composed of three levels. The highest level is a milestone schedule and represented by Bar Chart format. The middle level is an integrated project schedule (IPS) and represented by CPM (Critical Path Method) format. The lowest level is a detail working schedule and usually represented by Bar Chart. The traditional scheduling techniques such as ADM (Arrow Diagramming Method) or PDM (Precedence Diagramming Method) cannot represent all kinds of schedule within schedule hierarchy as identical schedule format. However, the BDM (Beeline Diagramming Method) technique can represent all kinds of schedule within schedule hierarchy as identical CPM format. This paper describes the basic concept, principle, interpretation methods, and schedule computation methods of the BDM as a new networking technique that can represent all kinds of overlapping relationships between activities, and then presents an example of representing three level's schedules within schedule hierarchy by the BDM technique.

  • PDF

선형시설물 공정관리 활용을 위한 선형공정표 활용 시스템 구축 방안 (Application of Linear Schedule Chart for Schedule Management of Linear Construction Project)

  • 이재희;강효정;강인석
    • 한국건설관리학회논문집
    • /
    • 제24권2호
    • /
    • pp.13-23
    • /
    • 2023
  • 도로, 철도 등의 토목시설공사는 제한된 구역에서 공정이 반복적으로 진행되는 건축공사와 달리 수십 km의 수평적 작업공간에서 선형 형태로 공정이 진행되고, 개별 공정은 시점부터 종점까지 거리 단위를 갖는 측점(Station)번호로 관리되고 있다. 이러한 이유로 공정의 작업 위치정보가 주요 관리요소가 되고 있으므로, 일정 정보만을 표현하는 간트공정표기반의 공정관리 체계는 한계점을 가질 수 있다. 본 연구에서는 공정의 시작 및 종료일을 나타내는 일정정보와 시작 및 종료 거리를 나타내는 위치정보를 동시에 표현할 수 있는 선형공정표의 구성 방법론을 제시하고, 이에 근거한 선형공정표 생성 시스템을 개발한다. 연구에서 선형공정표의 좌표축은 X, Y축을 각각 거리와 일정 값으로 구성하였으며, 개별 공정은 작업 내용을 유추할 수 있는 심볼로 표현하여 단순 막대도표 방식 대비 공정표의 시인성을 높였다. 개발된 선형공정표 생성 시스템은 철도시설 교량공사의 실제 공정 데이터를 활용하여 실무적 활용성을 검토하였다.

수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안 (Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space)

  • 한선주;김현승;박상미;강인석
    • 대한토목학회논문집
    • /
    • 제38권4호
    • /
    • pp.601-610
    • /
    • 2018
  • 건축공사는 제한된 공간에서 수직적으로 반복 작업이 진행되므로 공정관리에서 작업의 위치 정보에 대한 필요성이 크지 않다. 반면에 도로 및 철도시설과 같은 토목공사는 다량의 토공사, 장대교량, 장대터널 등으로 구성되며, 이러한 공종들은 수 십 KM에 이르는 선형축에 따라 수평적 공간에서 작업이 진행된다. 즉, 모든 공정들이 사업의 시점부터 종점까지 거리단위로 작업 현황이 관리되므로, 공정관리 도구에서도 작업 일정과 함께 해당 공정의 위치정보를 연동하여 표현하는 것이 사업관리의 효율성을 높일 수 있다. 본 연구에서는 이러한 선형축 기반의 시설물 공정관리에 특화된 선형공정표 구성방법론을 구성하여 기존의 대표적 공정표인 간트공정표와 비교하여 활용성을 분석한다. 또한 최근 시공단계의 대표적 BIM기술로 적용되고 있는 4D CAD시스템에 선형공정표의 연동 방법론을 제시하여 토목공사에 BIM활용성을 높이고자 하며, 제시된 방법론에 대해 통계학적 검증으로 실무 활용성을 분석한다.

재작업과 불확실성을 고려한 일정 시뮬레이션 방법론 (A Method for Schedule Simulation Considering Rework and Uncertainty)

  • 김찬묵;박영원
    • 한국철도학회논문집
    • /
    • 제12권1호
    • /
    • pp.135-143
    • /
    • 2009
  • 대부분의 개발 프로젝트는 목표 비용과 일정을 $40{\sim}200%$ 초과한다. 이러한 초과 현상은 계획시 업무를 과소 평가하거나 재작업을 고려하지 않음으로써 발생한다. 현재 국내에서 사용되는 대표적인 일정 계획/관리 기법(Gantt Chart, PERT/CPM 등)들은 재작업을 반영할 수 없다. 이 논문은 일정 계획시 보다 현실적인 일정 계획 값을 예측하기 위해서 재작업을 고려하는 방법을 고안하구 또한 과업의 과소평가를 방지하기 위해 수행시간의 불확실성을 확률변수로 나타내어 다루기 위해서 시뮬레이션을 수행하여 최종 완료 날짜의 예상치와 분산도를 계산하는 방법을 제안한다.

CPM BAR CHART TECHNIQUE FOR CONSTRUCTION SCHEDULING

  • Kyung-hwan Kim;Soo-yoo Kim;Jae-jun Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1118-1123
    • /
    • 2005
  • This paper proposes the CPM bar chart (CBC), a hybrid of the bar chart and the critical path method (CPM). The CBC overcomes shortages of the fence bar chart, while still retaining its advantages. The fence with direction is applied instead of the broken fence, which triggers considerable problems to identify and apply in the fenced bar chart. In addition, the notorious task to find dummy activities is no longer required. Upon the benefits of simplicity in the bar chart and logical work sequence in the CPM network, the CBC provides a relatively easy way to create and understand a schedule, thus improving communication quality between project participants.

  • PDF

BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구 (Development of Construction Schedule Management System based on BIM)

  • 박소현;송정화;오건수
    • 대한건축학회논문집:구조계
    • /
    • 제34권3호
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Development of a Flash-based Schedule Management Tool for Smart Devices

  • Jang, Myunghoun
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.558-565
    • /
    • 2012
  • Schedule management of construction work is critical to completing construction projects within a given period of time. Many efforts have been made and multiple tools have been developed to support the management of construction projects using smart devices such as smartphones and tablet PCs. This study proposed a method for managing construction schedules via a smart device using Flash. The interactive and graphic properties of Flash enable the development of an app that can allow a field manager to manage schedules easily and efficiently. A prototype was implemented using Adobe Flex Builder, and a sample network was applied in a smartphone. It is convenient for a construction manager to manage construction schedules using the tool because Flash controls graphic components easily. In further studies, network diagrams such as CPM (Critical Path Method) should be developed and applied to the app.

ILOG를 이용한 항공기 운항 일정계획 시스템 개발에 관한 연구 (A Study on Development of the Aircraft Scheduling System Using ILOG)

  • 윤종준;이장춘;이화기
    • 산업경영시스템학회지
    • /
    • 제24권65호
    • /
    • pp.89-102
    • /
    • 2001
  • In this paper, the aircraft route scheduling consists of two steps; the pairing generation and the aircraft assignment. The pairing generation is heuristic approach how flights construct pairings from and to the main base. The aircraft resource assignment which is to establish a aircraft route schedule is constructed by constraint satisfaction problem technique. ILOG solver and schedule is used to solve this problem. In addition, a aircraft route reschedule process against departure-arrival delay or aircraft maintenance schedule change is added by partial constraints satisfaction problem technique. Also, Gantt chart made by ILOG views is used to show aircraft route schedule results more easily.

  • PDF

IMPROVEMENT OF TACT SCHEDULE MANAGEMENT PROCESS FOR THE FINISH WORK OF APARTMENT HOUSES

  • Joo-Young Jung;Sang-Ho Yoon;Kyung-Kook Lee;Chang-Gyo Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.554-562
    • /
    • 2007
  • This study determined tact process paths by separating the finish works according to the properties of work areas and work relations in order to apply the tact schedule management to the finish works. In addition, by suggesting preparing and sharing the workflow charts, the experiments can be shared between the executors and any possible frictions between the specialist works can be identified in advance. In addition, any errors on the plan can be reviewed and modified through the measurement stage of tact plan attainment rate. The process of tact schedule management is improved with such tools and methods and the efficiency of the process through the application of cases was verified.

  • PDF

CPM Bar Chart 기법을 활용한 일정계획 (CPM Bar Chart Technique for Construction Scheduling)

  • 김경환;김수유;김재준
    • 한국건설관리학회논문집
    • /
    • 제5권5호
    • /
    • pp.135-142
    • /
    • 2004
  • 본 연구에서는 바차트(bar chart) 기법과 CPM 기법의 장점을 결합한 CPM bar chart(CBC) 기법을 제시한다. CBC는 기존의 fenced bar chart(FBC)의 장점을 유지하면서 단점을 보완한 것으로, 작업 관계를 나타내는 fence에 방향성을 부여함으로써, 기존 FBC에서 상당한 혼란을 유발하는 fence의 분리과정 없이 작업들의 관계를 표현할 수 있다. 또한, fence의 분리를 파악하기 위해 더미작업(dummy activity)을 확인하는 과정이 생략되어 보다 손쉽게 작성할 수 있는 장점도 있다. 바차트의 간결성을 유지하면서 CPM의 네트워크 논리 표현이 가능해짐에 따라, CBC는 다양한 프로젝트 참여자들 간의 원활한 의사소통에 기여하리라 예상된다. 또한, resource constrained scheduling, resource leveling, 작업 분리가 고려된 일정 조정, 공기 지연 분석 등의 CPM 기법에 기초한 다양한 일정 계획 및 관리에도 적용이 용이하여, 실무뿐만이 아니라 공정관리 교육과정에서도 활용성이 높으리라 기대된다.