A Method for Schedule Simulation Considering Rework and Uncertainty  

Kim, Chan-Mook (아주대학교 시스템공학과)
Park, Young-Won (아주대학교 시스템공학과)
Publication Information
Journal of the Korean Society for Railway / v.12, no.1, 2009 , pp. 135-143 More about this Journal
Abstract
The majority of development projects fail to meet their target schedule and cost, with the overrun typically between 40 and 200 percent. These overruns happen because the planners underestimate the work or do not consider the need to rework at project planning. Representative schedule planning/management techniques such as Gantt Chart, PERT/CPM etc. that are used in domestic project planning are unable to reflect rework. This paper proposes a method to consider rework to provide more realistic estimates at schedule planning. Additionally, to prevent the underestimation of the work this paper proposes a simulation method that calculates a probabilistic estimated schedule and the associated variance based on the random variable modeling of individual task completion dates.
Keywords
Schedule Planning; Schedule Simulation; PERT/CPM; DSM(Design Structure Matrix);
Citations & Related Records
연도 인용수 순위
  • Reference
1 Edward B. Roberts(1992), "Management of Technology: Global Benchmarking", Massachusetts Institute of Technology, December 10
2 Yonas Nebiyeloul-Kifle(2005), "Application of the design structure matrix to integrated product develpment process", MIT, pp.13
3 도시형 자기부상열차 실용화 사업단(2007). "인터페이스 조정회의"
4 PMBOK 지침서 2004 개정 프로젝트 팀(2004), "프로젝트 관리 지식체계 지침서" , pp. 147, Project Management Institute
5 Tyson R. Browning(2001). "Applying the design structure matrix to system decomposition and integration problems: a review and new directions", IEEE Transactions on Engineering Management, Vol. 48, No. 48, August, pp. 299-304
6 Oliver de Weck(2003), "System & Project Management", MIT lecture material
7 Peter Morris and George Hough(1987), "The anatomy of major projects: A study of the reality of project management", John Wiley and Sons