CPM Bar Chart Technique for Construction Scheduling  

Kim Kyung-Hwan (한양대학교 건설연구소 연구원)
Kim Soo-Yoo (한양대학교 대학원 건축공학과)
Kim Jae-Jun (한양대 건축공학부)
Publication Information
Korean Journal of Construction Engineering and Management / v.5, no.5, 2004 , pp. 135-142 More about this Journal
Abstract
This paper proposes the CPM bar chart (CBC), a hybrid of the bar chart and the critical pad method (CPM). The CBC overcomes shortages of the fenced bar chart, while still keeping advantages. The fence with direction is applied instead of the broken fence, which triggers considerable problems to identify and apply in the fenced bar chart. In addition, the notorious task to find dummy activities is no longer required. Upon the benefits of simplicity in the bar chart and logical work sequence in the CPM network. the CBC provides a relatively easy way to create and understand a schedule, thus improving communication quality between project participants. With the advantages, the CBC can also be effectively applied to various scheduling techniques such as resource constrained scheduling, resource leveling, scheduling with activity split, delay impact analysis, etc.
Keywords
CPM; bar chart; scheduling; resource leveling;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Callahan, M. T., Quackenbush, D. G., and Rowings, J. E. Construction Project Scheduling, McGraw-Hill, N.Y., 1992
2 Clough, R. H., Sears, G. A. and Sears S. K., Construction project management 4th Ed, Wiley & Sons, N.Y., 2000
3 이재섭 '바차트를 이용한 건설공사의 공기지연 분석방법', 대한건축학회 논문집 제17권 제1호, 2001
4 Liberatore, M. J., Pollack-Johnson, B., and Smith, C. A. 'Project management in construction: software use and research directions', Journal of Construction Engineering and Management, ASCE, Vol. 127, No.2, 2001
5 Melin, J. W. and Witeaker, B., 'Fencing a Bar Chart,' Journal of Construction Division, ASCE Vol. 107, No.3, 1981
6 Hinze, Jimmie M. Construction Planning and Scheduling 2/E, Prentice Hall, NJ., 2004