CPM BAR CHART TECHNIQUE FOR CONSTRUCTION SCHEDULING
- Kyung-hwan Kim (Construction Research Institute, Hanyang University) ;
- Soo-yoo Kim (Dept. of Architectural Engineering, Graduate School of Hanyang University) ;
- Jae-jun Kim (College of Architecture, Hanyang University)
- Published : 2005.10.16
Abstract
This paper proposes the CPM bar chart (CBC), a hybrid of the bar chart and the critical path method (CPM). The CBC overcomes shortages of the fence bar chart, while still retaining its advantages. The fence with direction is applied instead of the broken fence, which triggers considerable problems to identify and apply in the fenced bar chart. In addition, the notorious task to find dummy activities is no longer required. Upon the benefits of simplicity in the bar chart and logical work sequence in the CPM network, the CBC provides a relatively easy way to create and understand a schedule, thus improving communication quality between project participants.