• Title/Summary/Keyword: Roadway Management

Search Result 63, Processing Time 0.024 seconds

International Comparative Analysis of Traffic Safety Indicators related to Road Traffic Accidents (도로교통사고 안전지표의 국제간 비교분석 평가)

  • Kim, Sang Gu
    • Journal of Digital Convergence
    • /
    • v.17 no.9
    • /
    • pp.429-438
    • /
    • 2019
  • This study was to evaluate the level of traffic safety related to domestic traffic accidents by analyzing the international comparison of road traffic accident indicators and to set goals and directions of traffic accidents in Korea in the future. The research procedure was as follows: First, population, number of registered vehicles, roadway length, vehicle kilometers, injury accidents, fatalities, injuries were collected in 32 OECD countries. Second, we determined Korea's traffic safety rankings through international comparison of traffic accident rate. Finally, we analyzed the level of traffic safety by comparing Korea with the 7 advanced countries with the traffic accident rate per vehicle kilometers. The accident rate in Korea was greater than two times higher than those of the seven major developed countries, which showed that the level of traffic safety in Korea implied very low. Target values for domestic accidents were proposed based on the accident rate.

Assessment of the Locations for Carbon Monoxide Monitoring Stations in Daegu according to Emission Distribution (배출량 분포에 따른 대구시 일산화탄소 측정망 위치의 적절성 평가)

  • Kim, Hyo-Jeong;Jo, Wan-Kuen
    • Spatial Information Research
    • /
    • v.20 no.2
    • /
    • pp.25-34
    • /
    • 2012
  • Air quality in Daegu area is lower compared to many other cities, since Daegu is a basin surrounded by mountains. Accordingly, the present study investigated the location of carbon monoxide(CO) monitoring stations for systematic CO pollution management on the basis of the CO emission distribution in Daegu area. In order to achieve this purpose, the location of CO monitoring stations, which can be used for the establishment of CO management, were assessed. Emission map in Daegu area was prepared using numerical map and Clean Air Policy Support System(CAPSS) data supplied by the M inistry of Environment. Average emissions were estimated by dividing emission sources into four subgroups(roadway, apartment, industry, and municipal incineration facility) according to legal division. The CO emission intensities were subdivided into 10, which a high number represents a high emission intensity, and the current monitoring stations were evaluated for the determination of their steps in CO emission intensities. As a result, additional installation of monitoring stations were suggested for the high CO emission areas rather than the low CO emission areas. A systematic CO management strategy would be established by the supplying various principle CO data when the CO monitoring stations are additionally installed at Kukwudong and other six sites on the basis of analyses of data obtained from 1999 to 2007.

Study on the improvements for Managerial Efficiency of the Designated Lane Law (지정차로제의 합리적 운영방안에 대한 연구)

  • Lee, Seung-Jun;Lee, Choul-Ki;Lee, Yong-Ju;Kim, Yong-Man
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.15 no.2
    • /
    • pp.85-94
    • /
    • 2016
  • Lane Designation is defined as reasonable road management to ensure the road safety and enhance road efficiency. While the lane designation system was abolished in 1999, it was redefined because of the increasing number of large vehicles in the passing lane, violent on driving and traffic accidents in 2000. The needs of improvement on operating the lane designation has been increasing more in recent due to the low ratio of compliance with the system and difficulties to keep the right lane due to need of turning and demand of widening of designates lane for two-wheeled vehicles and truck. In this study, we presented the improvement plan through the question survey, simulation analysis, safety evaluation. It found a problem that the low-speed vehicle is to use the upper level roadway, difficulties of supervision, the imbalance in the lane use, imbalance traffic and does not match the international standards. This study suggested five different alternatives through the survey. micro simulation has used in order to examine each alternative by management effectiveness and feasibility. It analyzed the traffic speed, efficiency, traffic balance of alternatives. Also, safety evaluation conducted in terms of the range of field-of-view to ensure the easiness of field of view by various configurational difference between the vehicles. By the analysis results of such indicators, This study presents proposals for improvement in operating designated lane that low-speed-big-sized vehicles keep to the right lane, and high-speed-small sized vehicles keep to the left lane.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information (가용정보를 활용한 기획 및 설계초기 단계의 도로 공사비 예측모델)

  • Kwak, Soo-Nam;Kim, Du-Yon;Kim, Byoung-Il;Choi, Seok-Jin;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2009
  • The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various researches have been attempted to develop cost prediction models in the early stage of a construction project. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the Case-Based Reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.

A Study on the Development of an Automated Pavement Crack Sealer (도로면 크랙 실링 자동화 장비 개발에 관한 연구)

  • Lee Jeong-Ho;Lee Jae-Kwon;Kim Min-Jae;Kim Young-Suk;Cho Moon-Young;Lee Jun-bok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.539-542
    • /
    • 2002
  • Crack sealing is a maintenance procedure that is commonly used to reduce pavement degradation. If cracks in pavements are not sealed, surface water penetration can reduce the strength of the sub-base layers, which can result in increased deflections of the pavement. Reduced strength of the sub-base also accelerates the deterioration of the surface, due to development of greater cracking and potholes. Crack sealing is performed to reduce water and debris penetration, thereby helping to maintain pavement structural capacity and limiting future degradation. The process of sealing cracks in pavements is however dangerous, costly, and labor-intensive operation. Labor turnover and training are increasing problems related to crack sealing crews, and as traffic volumes increase. Automating crack sealing can reduce labor and road user costs, improve work quality, and decrease worker exposure to roadway hazards. The main objective of this research is to develop an automated system for sealing cracks in pavement. Extension of the algorithms and tools presented in this research is also recommended for future study.

  • PDF

Development of Freeway Traffic Incident Clearance Time Prediction Model by Accident Level (사고등급별 고속도로 교통사고 처리시간 예측모형 개발)

  • LEE, Soong-bong;HAN, Dong Hee;LEE, Young-Ihn
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.5
    • /
    • pp.497-507
    • /
    • 2015
  • Nonrecurrent congestion of freeway was primarily caused by incident. The main cause of incident was known as a traffic accident. Therefore, accurate prediction of traffic incident clearance time is very important in accident management. Traffic accident data on freeway during year 2008 to year 2014 period were analyzed for this study. KNN(K-Nearest Neighbor) algorithm was hired for developing incident clearance time prediction model with the historical traffic accident data. Analysis result of accident data explains the level of accident significantly affect on the incident clearance time. For this reason, incident clearance time was categorized by accident level. Data were sorted by classification of traffic volume, number of lanes and time periods to consider traffic conditions and roadway geometry. Factors affecting incident clearance time were analyzed from the extracted data for identifying similar types of accident. Lastly, weight of detail factors was calculated in order to measure distance metric. Weight was calculated with applying standard method of normal distribution, then incident clearance time was predicted. Prediction result of model showed a lower prediction error(MAPE) than models of previous studies. The improve model developed in this study is expected to contribute to the efficient highway operation management when incident occurs.

A Study on the Development of an Automated Pavement Crack Sealer (도로면 크랙실링 자동화 로봇의 프로토타입 개발에 관한 연구)

  • Lee Jeong-Ho;Yu Hyun-Seok;Kim Young-Suk;Lee Jun-Bok;Cho Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.162-171
    • /
    • 2004
  • Crack sealing is a maintenance procedure that is commonly used to reduce pavement degradation. If cracks in pavements are not sealed, surface water penetration can reduce the strength of the sub-base layers, which can result in increased deflections of the pavement. Reduced strength of the sub-base also accelerates the deterioration of the surface, due to development of greater cracking and potholes. Crack sealing is performed to reduce water and debris penetration, thereby helping to maintain pavement structural capacity and limiting future degradation. The process of sealing cracks in pavements is however dangerous, costly, and labor-intensive operation. Labor turnover and training are increasing problems related to crack sealing crews, and as traffic volumes increase. Automating crack sealing can reduce labor and road user costs, improve work quality, and decrease worker exposure to roadway hazards. The main objective of this research is to develop an automated system for sealing cracks in pavement. Extension of the algorithms and tools presented in this research is also recommended for future study.

Development of comprehensive earthquake loss scenarios for a Greek and a Turkish city: seismic hazard, geotechnical and lifeline aspects

  • Pitilakis, Kyriazis D.;Anastasiadis, Anastasios I.;Kakderi, Kalliopi G.;Manakou, Maria V.;Manou, Dimitra K.;Alexoudi, Maria N.;Fotopoulou, Stavroula D.;Argyroudis, Sotiris A.;Senetakis, Kostas G.
    • Earthquakes and Structures
    • /
    • v.2 no.3
    • /
    • pp.207-232
    • /
    • 2011
  • The development of reliable earthquake mitigation plans and seismic risk management procedures can only be based on the establishment of comprehensive earthquake hazard and loss scenarios. Two cities, Grevena (Greece) and D$\ddot{u}$zce (Turkey), were used as case studies in order to apply a comprehensive methodology for the vulnerability and loss assessment of lifelines. The methodology has the following distinctive phases: detailed inventory, identification of the typology of each component and system, evaluation of the probabilistic seismic hazard, geotechnical zonation, ground response analysis and estimation of the spatial distribution of seismic motion for different seismic scenarios, vulnerability analysis of the exposed elements at risk. Estimating adequate earthquake scenarios for different mean return periods, and selecting appropriate vulnerability functions, expected damages of the water and waste water systems in D$\ddot{u}$zce and of the roadway network and waste water system of Grevena are estimated and discussed; comparisons with observed earthquake damages are also made in the case of D$\ddot{u}$zce, proving the reliability and the efficiency of the proposed methodology. The results of the present study constitute a sound basis for the development of efficient loss scenarios for lifelines and infrastructure facilities in seismic prone areas. The first part of this paper, concerning the estimation of the seismic ground motions, has been utilized in the companion paper by Kappos et al. (2010) in the same journal.

Factors Influencing Crash Severity by the Types of Bus Transportation Services Using Ordered Probit Models (순서형 프로빗 모형을 이용한 버스 운송사업 유형 별 사고심각도 영향요인 분석)

  • YOON, Sangwon;KHO, Seung-Young;KIM, Dong-Kyu
    • Journal of Korean Society of Transportation
    • /
    • v.36 no.1
    • /
    • pp.13-22
    • /
    • 2018
  • Buses, one of the representative public transportation modes, are divided into a vareity of service types according to the purpose of operation, operating distance, and management agencies. Although bus-involved crashes may cause large amount of damage due to the higher number of passengers boarded on a bus, prior research has little focused on crash severity according to bus service types. This study aims to investigate factors influencing crash severity in bus-involved crashes and to present policy implications to reduce crash severity by bus service type. To do this, bus-involved crash data from the Traffic Accident Analysis System (TAAS) during five-year period are used. Ordered probit models for three types of bus service, i.e., city bus, suburban and express buses, and charter buses, are estimated to analyze the factors of accident severity. The results show that there are significant differences of factors affecting crash severity among the types of bus services while speed and road surface influence all the types of buses. In case of local buses, time of day, roadway alignment, and installation of a traffic signal are found to be statistically significant factors. Seat belt and road class have significant effects on injury severity of the intercity and express buses. Chartered buses have time of day, driving experience, seatbelt, traffic signal, and day of week as the significant factors. The results of this study are expected to contribute to the reduction of the crash severity by each bus service type.