1 |
Sun, J.W., Lee, D.Y., and Park, K.H. (2016) "Development on Repair and Reinforcement Cost Model for Bridge LifeCycle Maintenance Cost Analysis." Journal of the Korea Academia-Industrial cooperation Society, 17(11), pp. 128-134.
DOI
|
2 |
Jung, D.K., Tae, Y.H., Ahn, B.R., and Cho, Y.H. (2009). "A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance." Korea Society of Road Engineers, 11(1), pp. 85-94.
|
3 |
MOLIT (Ministry of Land, Infrastructure and Transport), KICT (Korea Institute of Civil Engineering and Building Technology). 2019 Construction standard production rate, Ministry of Land Infrastructure and Transport, Korea, pp. 460-466.
|
4 |
Oh, J.H., and Ahn, B.R. (2019). "An Analysis on the Revision Factors of Construction Cost Calculation Criteria through Field Survey of Waterproof Work." Journal of the Korea Academia-Industrial cooperation Societ., 20(10), pp. 468-477.
|
5 |
Lee, J.H., Lee, H.J., Park, H.M., and Kim, I.T. (2008). "A Case Study for the Estimation of Remaining Lives of Asphalt Pavements." International journal of highway engineering, KSRE, 10(2), pp. 1-13.
|
6 |
Park, M.Y., Kim, K.S., Lim, J.K., and Park, K.J. (2008). "The survey of unit cost change by maintenance and repair methods for LCC (Life Cycle Cost) analysis of expressway asphalt pavement." Korean Society of Civil Engineers, pp. 465-468.
|
7 |
Ryu, C.S., Jang, S.H., Kim, K.R., and Lim, K.I. (2002). "Concept and Standard of Fair Construction Cost in the Domestic Construction Industry." Journal of The Architectural Institute of Korea Structure & Construction, 18(3), pp. 157-164.
|
8 |
Shin, D.W., Lee, Y.D., Shin, Y.S., Kim, G.H., Yoo, S.R., and Park, W.J. (2014). "Study on Improvement of Cost Calculation Method in Construction less than One Day Workload." Journal of the Korea Institute of Building Construction, 14(5), pp. 477-485.
DOI
|