• Title/Summary/Keyword: Road project

Search Result 533, Processing Time 0.024 seconds

Co-Pilot Agent for Vehicle/Driver Cooperative and Autonomous Driving

  • Noh, Samyeul;Park, Byungjae;An, Kyounghwan;Koo, Yongbon;Han, Wooyong
    • ETRI Journal
    • /
    • v.37 no.5
    • /
    • pp.1032-1043
    • /
    • 2015
  • ETRI's Co-Pilot project is aimed at the development of an automated vehicle that cooperates with a driver and interacts with other vehicles on the road while obeying traffic rules without collisions. This paper presents a core block within the Co-Pilot system; the block is named "Co-Pilot agent" and consists of several main modules, such as road map generation, decision-making, and trajectory generation. The road map generation builds road map data to provide enhanced and detailed map data. The decision-making, designed to serve situation assessment and behavior planning, evaluates a collision risk of traffic situations and determines maneuvers to follow a global path as well as to avoid collisions. The trajectory generation generates a trajectory to achieve the given maneuver by the decision-making module. The system is implemented in an open-source robot operating system to provide a reusable, hardware-independent software platform; it is then tested on a closed road with other vehicles in several scenarios similar to real road environments to verify that it works properly for cooperative driving with a driver and automated driving.

Building of Efficient Route Alignment Information using GSIS -Focused on plan and vertical alignment- (GSIS를 이용한 효율적 도로선형 정보의 구축 - 평면 및 종단선형을 중심으로 -)

  • 강상구;정영동
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.4
    • /
    • pp.325-333
    • /
    • 2000
  • This paper deals with real time building of route and vertical alignment information system for the efficient and scientific management using GSIS. First, we redesigned route and vertical alignment for obtained basic data using road projector(road design main software). Using by these acquired result, we made a database on road plan and vertical alignment drawing as a basic information being used to construction of road complex information system. The main objectives in this study are the rational maintenance road planing for drawings, its database and the systematization of route information management through the fast updating, mending, supplement. Result of this study enables us to manage route information.

  • PDF

EVALUATION OF MINIMUM REVENUE GUARANTEE(MRG) IN BOT PROJECT FINANCE WITH OPTION PRICING THEORY

  • Jae Bum Jun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.800-807
    • /
    • 2009
  • The limited public funds available for infrastructure projects have led governments to consider private entities' participation in long-term contracts for finance, construction, and operation of these projects to share risks and rewards between the public and the private. Because these projects have complicated risk evolutions, diverse contractual forms for each project member to hedge risks involved in a project are necessary. In light of this, Build-Operate-Transfer(BOT) model is considered as effective to accomplish Public Private Partnerships(PPPs) with a characteristic of an ownership-reversion. In BOT projects, the government has used such an incentive system as minimum revenue guarantee(MRG) agreement to attract the private's participation. Although this agreement turns out critical in success of BOT project, there still exist problematic issues in a financial feasibility analysis since the traditional capital budgeting theory, Net Present Value(NPV) analysis, has failed to evaluate the contingent characteristic of MRG agreement. The purpose of this research is to develop real option model based on option pricing theory so as to provide a theoretical framework in valuing MRG agreement in BOT projects. To understand the applicability of the model, the model is applied to the example of the BOT toll road project and the results are compared with that by NPV analysis. Finally, we found that the impact of the MRG agreement is significant on the project value. Hence, the real option model can help the government establish better BOT policies and the developer make appropriate bidding strategies.

  • PDF

Measuring Benefits of Developing a Linear Park in the Gyeongin Expressway Downgrade Project by Applying CVM (CVM을 적용한 경인고속도로 일반화 및 선형공원 조성사업의 편익 측정)

  • Young Sook Eom;Sang Ke Kim
    • Environmental and Resource Economics Review
    • /
    • v.32 no.4
    • /
    • pp.239-266
    • /
    • 2023
  • This study applied the contingent valuation method (CVM) to measure the benefits from an urban liner park that will be created as part of the Gyeongin Expressway downgrade project by Inchon metropolitan city government. The Incheon city government plans to create a liner park (10.5 km) in the middle of the downgraded road to provide leisure and recreation services to residents, and plans to remove retaining walls and soundproof walls to improve the urban residential environment. Considering the characteristics of a liner park that spans several districts in Incheon city and the downgraded road that will be passed by residents of nearby cities as well as Incheon residents, the target population included residents of part of Seoul and several cities surrounding Incheon. In a CVM survey of 1,000 respondents conducted in April 2018, about 70% of the respondents perceived this project positively. About 50% of 757 respondents, excluding protest bids respondents, were willing to pay additional taxes for this project. The more the respondents favored the creation of a linear park and the more they thought that this project would improve the surrounding residential environment, the more positively they evaluated the additional tax payment. The average annual willingness to pay for this project was about 15,300 won for Incheon residents and 6,800 won for residents of Seoul metropolitan area. It is interesting to observe that residents of Seoul metropolitan area, who are not directly affected by this project, were willing to pay a considerable amount for this project.

Comparison of Methodology and Accuracy of Digital Mapping of Forest Roads (수치임도망도 제작방법 및 정확도 비교)

  • Kim Tae-Geun;Yoon Jong-Suk;Woo Choong-Shik;Lee Kyu-Sung;Hong Chang-Hee
    • Spatial Information Research
    • /
    • v.13 no.3 s.34
    • /
    • pp.195-209
    • /
    • 2005
  • Forest road has been an essential infrastructure for various forestry practices as well as for recreational use, disaster management, and local economics promotion. Since 1980s, extensive network of forest roads has been constructed as an national project in Korea. However, due to the minimal-budget of the project, accurate maps of forest road are not usually available. Although forest road map is a main thematic layer for the forest Geographic Information System (FGIS), its locational accuracy has not been sufficient for the practical applications and, therefore, the update of digital forest road maps is urgent. The objectives of this study is to compare ae methodology of generating and updating digital forest road maps from the aspects of the map accuracy and the efficiency of methods. Four mapping methods (GPS surveying, satellite imagery, ortho aerial photograph, and digital photogrammetry) were applied to generate the forest road maps over the study area of Mt. Oseo in Chungchungnam-do, which has a 35km forest roads distributed in national, public and private forests. The forest road Imp produced by digital photogrammetric method is the most accurate and comparable to GPS surveying although it required the greatest amount of labor time.

  • PDF

The Living Environments of Leave-out lands in the Land Readjustment Project Area - Focused on Daegu City - (구획정리사업 부지내의 제척지 주거환경 실태 - 대구시를 중심으로 -)

  • Kim Han-Su
    • Journal of the Korean housing association
    • /
    • v.16 no.3
    • /
    • pp.119-125
    • /
    • 2005
  • This study is designed to suggest future development guidelines for leave-out lands in the land readjustment project area. For this purpose, physical conditions which affect living conditions were surveyed. The findings are follows. First, the living conditions in the lands are low with shortage of parking space and green area, narrow and low-performance road conditions, disordered fence and roof. Furthermore, illegal waste disposal made the condition even worse. Second, it is desirable to make separated plan for the leave-out lands because they have quite different living conditions from those of the land readjustment project area. Third, it is suggested that urban planning and architectural laws should pay attention to the leave-out lands to improve living conditions. It is also recommended that planning obligations for the leave out land should be imposed on land developers.

The application of the Intuitive Method to Evaluate Feasibilities of Railway Project (철도사업에의 직관적 타당성 평가모형 적용)

  • Kim, Hyun-Woong;Hyeon, Jae-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.437-441
    • /
    • 2010
  • The SOC project such as road and railway performs a preliminary feasibility study according to the priority of the individual projects after establishing the master plans. For a preliminary feasibility study, feasibility evaluation should be performed according to the transport demand estimation and economic analysis. The feasibility of individual project will be performed by focussing on the results of analyzing economic feasibility. In case that analysis of the traffic demand and the economic feasibility every phase is performed, a lot of time and expense will be required in the course of promoting projects. So this study could give help to determine the priority of the project by intuitive method only in the phase to establish the master plan and a preliminary feasibility study.

  • PDF

Analysis of the right to sunshine for elevated structure construction (고가 구조물 건설에 따른 일조권 분석)

  • 강기수;김상석;양승태;강인준
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.04a
    • /
    • pp.485-490
    • /
    • 2004
  • Recently, distribution transfer velocity was extremely lowered by high supply rate of vehicle and low road rate. Therefore expansions of transfer network these were subway, road and railway to recover competitive power as a reform measure of physical distribution traffic were become preference previous subject. For reason of that, an expansion of transfer network is meeting competitive power as selected an elevated road in the ground road network that condition of location calm and get out of the existing urban than the underground road to connect oversensitive a large city and expanded small and medium satellite town. In the meantime, while elevated structures construct, they go through the civilian residential section, agriculture land, etc. The consequence is that it raises a vibration, noise, dust, an infringement of the right to a view and an infringement of the right to a sunshine. In this study, we analyzed Quantitatively sunshine quantity with building 3D simulation model of civil structure. Therefore, we present as planning data to reduce a civilian appeal for dispute of the right to sunshine and an economic and time loss between the government and construction company In addition to that, for the standard of the standard plan of usable sunshine quantity program in the practical business, the building of convenient user interface will be the project to be done.

  • PDF

Accidents involving Children in School Zones Study to identify the key influencing factors (어린이보호구역내 어린이 교통사고 발생에 미치는 영향요인 분석)

  • Park, Sinae;Lim, Junbeom;Kim, Hyungkyu;Lee, Soobeom
    • International Journal of Highway Engineering
    • /
    • v.19 no.2
    • /
    • pp.167-174
    • /
    • 2017
  • PURPOSES: This study aims to analyze the impact of the implementation of a school zone traffic safety improvement project on the number of accidents involving children in these zones. METHODS : To analyze the correlation between school zone traffic safety features of roads in the zone and the number of accidents involving children, we developed an occurrence probability model of traffic accidents involving children by using a binary logistic regression model with SPSS 23.0 software. Two separate models were developed for two zones: interior block and arterial road. RESULTS :The model depicted that in the case of the interior block, shorter sidewalk width, speed bump, and an elevated crosswalk were key factors affecting the occurrence of accidents involving children. In the case of arterial roads exceeding a width of 12 m, the speed limit, roadside barriers, and red paving of road surfaces were found to be the key factors. CONCLUSIONS:The results of this study can serve as the elementary research data to help improve the effectiveness of school zone traffic safety improvement projects and school zone road repair projects in future.

Development of Evaluation Model for Road Plan using Information Measurie Technique and GIS (정보계측기법과 지리정보시스템에 의한 도로계획의 평가모델 개발)

  • Na, Joon-Yeop
    • Spatial Information Research
    • /
    • v.16 no.1
    • /
    • pp.1-10
    • /
    • 2008
  • `Information measure model' and 'Information benefit model' for road plan are developed. In result of application to actual road project, 'Information measure model' showed same result with actual road plan, it can express qualitative element by 'Information' like safety, public discontent, etc. and 'Information benefit model' can evaluate present plan in the side of provider's and demader's 'benefit'.

  • PDF