Project risk assessment is the most important activity performed at the beginning of a project because it can judge the performance of the project in advance. In this study, We were evaluated risk with traditional risk factors such as technology and schedule, etc, and Indirect risks factors such as financial, strategic, and special risks. and then, we analyzed what kind of relationship these risk evaluation factors have on business performance and customer satisfaction. As a result of the research, it was found that the risk evaluation items had a relationship with performance and customer satisfaction. However, It is possible that the performance may differ depending on how risks are managed after risk assessment. Therefore, follow-up studies should be conducted, including information on risk management practices. This study is meaningful that presenting practical risk evaluation items and at the same time identifying the relationship with performance. We plan to further the study in future studies including the evaluation of risk management process.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.21
no.1
/
pp.79-86
/
2021
In order to increase the probability of success in big data projects, quantified techniques are required to analyze the root cause of risks from complex causes and establish optimal countermeasures. To this end, this study measures risk factors and relationships through SNA analysis and presents a way to respond to risks based on them. In other words, it derives a dependency network matrix by utilizing the results of correlation analysis between risk groups in the big data projects presented in the preliminary study and performs SNA analysis. In order to derive the dependency network matrix, partial correlation is obtained from the correlation between the risk nodes, and activity dependencies are derived by node by calculating the correlation influence and correlation dependency, thereby producing the causal relationship between the risk nodes and the degree of influence between all nodes in correlation. Recognizing the root cause of risks from networks between risk factors derived through SNA between risk factors enables more optimized and efficient risk management. This study is the first to apply SNA analysis techniques in relation to risk management response, and the results of this study are significant in that it not only optimizes the sequence of risk management for major risks in relation to risk management in IT projects but also presents a new risk analysis technique for risk control.
Korean Journal of Construction Engineering and Management
/
v.19
no.5
/
pp.81-89
/
2018
The purpose of this study is to assess the risk and predict the contingency for modular plant construction projects. Considering the work characteristics of the modular plant, The adapted research method is that suggest models for assessment impact of risk and predict the contingency considering risk. Based on the proposed models, It is selected one modular plant construction project and assessment impact of risk factors and predicted the contingency. The results of this study are as follows: Assessment the probability of occurrence of risk factors and intensity of impact, and extract 15 important risk factors. These are classified as Engineering, Procurement, Fabrication, Transportation, Construction phases to consider the work characteristics of the modular plant. The predicted contingency is that 6.739%(Engineering 2.850%, Procurement 6.225%, Fabrication 6.211%, Transportation 4.165%, Construction 8.168%) to prepare the basic business expense. The model is used as a way to derive quantitative results in the decision-making process for risk management in construction projects.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.363-364
/
2023
The tunnel construction projects is demanded more efficient risk management measures and loss forecasts to prepare for risk losses from an increase in the trend of tunnel construction. This study aims to analyze the risk factors that caused the loss of material in actual tunnel construction and to develop a quantified predictive loss model, based on the past loss record of tunnel construction projects.
Korean Journal of Construction Engineering and Management
/
v.17
no.1
/
pp.18-27
/
2016
The purpose of this study is to classify main risk factors on a construction phase of a plant project and analyze importance by the risk factors. Plant Industry is continuing boom and the increase in overseas plant orders in 2014 has showed a performance increase of 61% of the total orders, as the plant industry are risk factors for the construction phase, safety management target recognition and variety of accident prevention and safety factors by importance, etc. a situation that requires the development and introduction of management. So, it is performed that collected disaster conditions data on a construction phase of a plant project, is questioned by plant construction professional and is classified by 4M. Then, it is performed that is questioned by plant construction and safety professional in order to apply AHP method, and is presented from analyzing the risk factors, which are results of the survey, by importance and priority. This study will recognize from identifying the main risk factors in advance and will be utilized as a basic data is to prevent the risk factors.
Objective : The objective of this study was to examine how experts and the public perceived various environmental and technological hazards based on psychometric paradigm. Methods : We conducted a survey that included 30 hazards and 10 risk attributes. Subjects of this study were 214 people with three groups; (1) experts (55 people), (2) graduates( 78 people), (3) under graduates (81 people). Factor analysis was used to confirm the common risk attribute from 8 risk attributes. Also, multiple regression analysis was used to identify factors influencing on perceived risk and benefit of hazards. Results : This study revealed that experts tend to be more tolerant than graduates and under graduate students for the 30 hazards. Using factor analysis, two main factors were identified: factor 1, commonly called "Dread Risk", and factors 2, commonly called, "Unknown Risk" in the literature. We identified that environmental hormone concentration and global warming ranked high in both dread risk and unknown risk. Multiple regression models were used to test the association of perceived social risk and perceived social benefit with two main factors. Dread risk had significant explanatory power on perceived social risk and benefit. We identified that the experts were less likely to perceived dread risk and know more information about the hazards. Conclusions : There were differences of risk perception between experts and lay people. Especially, experts' perception of risk was commonly lower than other people's perception.
Journal of the Korea Institute of Building Construction
/
v.10
no.4
/
pp.83-93
/
2010
With construction projects continuously becoming more massive and complex, risk factors have been consistently increasing. To achieve a successful project, it is very important to identify and cope with such risk factors. Therefore, the purpose of this study is to suggest plans of reducing risk, not only for describing the drafting process for construction planning but also for systematically organizing constraints and risk factors in earth work, foundation work and reinforced concrete construction. To achieve these objectives, this study 1) analyzes previous theories about risk classification structure, 2) performs a case study of an actual project to embody the problems of safety management by analyzing the results of an interview with a construction engineer. In conclusion, the following factors were systematically organized: 1) characteristics of construction site (purpose, structure, floor, etc.); 2) the actual application conditions of the main construction methods; 3) the relationship between constraints and risk factors.
Objectives : To determine obesity for the screening of individuals at high risk of coronary heart disease in urban areas. Methods : Data were obtained from 4,137 adults between 19 and 85 years of age (2,372 males, 1,765 females), not recognized as taking medicines for cardiovascular diseases, who underwent a health check-up at the health promotion center of university hospitals in cities between Jan. 2003 and Dec. 2004. The variables studied were divided into two broad categories, and their relationships examined. obesity indices and risk factors for coronary heart disease. To reveal the relation between each of the obesity indices and the proportion of individuals at risk of coronary heart disease, the obesity indices were stratified and odds ratios obtained after age adjustment. Results : From a gender comparison of anthropometric measures, men were found to have significantly greater heights, weights, and waist and hip circumferences than women. From a gender comparison by the obesity indices, women were found to have significantly higher BMI, %Fat, waist to hip and waist to stature ratios than men. As obesity indices, the waist to stature ratio and the waist circumference were strongly correlated with coronary risk factors, both in men and women. The age-adjusted odds ratio of coronary risk factors increased significantly with increasing waist circumference, BMI, %fat, waist to hip and waist to stature ratios, and were highest specifically for the waist to stature ratio and the waist circumference. Conclusions : The study results showed that the waist to stature ratio and the waist circumference, as obesity indices, were most closely correlated with coronary risk factors. It is suggested that the waist to stature ratio and, specifically, the waist circumference can be effectively used in the field of health management for screening those with high levels of coronary risk factors.
Especially because of the distinctiveness that new experiments and research provoke coexistence of various risk factors, the researchers in university laboratory are being exposed to incidents that are difficult to predict. Due to the fact that the numbers of accidents that occur at the university laboratory are increasing, the necessity for laboratory safety management is on the rise. Most laboratory accidents are caused by the ability that can detect risk factors such as unsafe behavior or unsafe condition but is not working perfectly. In order to prevent researchers in advance from unsafe behavior or unsafe condition, effective safety education, systematic safety management, safe research environment, continuous safety check and proper measures after accident are the most important factors. In this study, survey was conducted in university laboratory to identify the factors that affect on safety management and to measure the safety management level. As a result, effective measures are proposed for the improvement of the safety management level.
International conference on construction engineering and project management
/
2009.05a
/
pp.1176-1182
/
2009
Due to recession in real estate market, interest of risk analysis is increasing. Feasibility study in the first stage takes a great role in a project. There are not objectified tools which are able to cope with uncertainty of project, and feasibility study based on selected method of determinism does not include liquidity of weight risk. Also, shortage of consideration for subjective and atypical external factors causes inappropriate results. Therefore, this study proposes feasibility study model focused on risk factor influences in construction cost and sales cost. Considering effective level of cost based on objective risk factors and probable weight of risk by this model, real workers are able to bring correct and scientific decisions better than former method based on selective analysis of real estate development.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.