Browse > Article
http://dx.doi.org/10.5345/JKIC.2010.10.4.083

Plans for Reducing Risk through a Case Study of Risk Factors at a Construction Site -Focused on Earth work, Foundation Work, Reinforced Concrete Construction-  

Kim, Jin-Ho (Department of Architectural Engineering, Tongmyong University)
Publication Information
Journal of the Korea Institute of Building Construction / v.10, no.4, 2010 , pp. 83-93 More about this Journal
Abstract
With construction projects continuously becoming more massive and complex, risk factors have been consistently increasing. To achieve a successful project, it is very important to identify and cope with such risk factors. Therefore, the purpose of this study is to suggest plans of reducing risk, not only for describing the drafting process for construction planning but also for systematically organizing constraints and risk factors in earth work, foundation work and reinforced concrete construction. To achieve these objectives, this study 1) analyzes previous theories about risk classification structure, 2) performs a case study of an actual project to embody the problems of safety management by analyzing the results of an interview with a construction engineer. In conclusion, the following factors were systematically organized: 1) characteristics of construction site (purpose, structure, floor, etc.); 2) the actual application conditions of the main construction methods; 3) the relationship between constraints and risk factors.
Keywords
risk factor; constraints; uncertainty; construction method; priority management;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Oh JJ, Cho HH. A study of Risk Breakdown Structure derived from Natural Hazards for Framework in Construction. Synopsis of the 5th Outstanding thesis 2009;5(1):79-82.
2 Lee JS, Moon SK, Jun YJ, Kim JH, Kim JJ. Study on Development of Construction Management Module based on Risk Factor Classification System at Construction Phase. Proceedings of Journal of the korean institute of building construction 2009;9(1):199-202.
3 Lee HS, Kim HS, Park MS, Lee KP, Lee SB. Construction Risk Assessment Methodology Using Site Risk Influence Factors. Korean journal of construction engineering and management 2009;10(6):117-26.   과학기술학회마을
4 Kim DC, Kim WJ. A study on the Risk Assessment Method by Accidents Analysis in Steel-Structure Work. Journal of the architectural institute of korea 2001;17(12):217-24.
5 Shin HJ, Choi JH, Hong WH. Guidelines on Performance-based Egress Design Criteria Considering the Risk Factors of a High-rise Building. Journal of the architectural institute of korea 2009;25(7):139-48.
6 Chu HK, Kim SG. A study for Re-establishment of the Existing Risk Identification System in Construction Project. Proceedings of Journal of the architectural institute of korea 2003;23(1):355-8.
7 Ahn HS. Fundamental Causes and Future Solution of the Sampoong Department Store Collapse. Review of architecture and building science 2005;49(7):51-4.
8 Kim DC, Kim JH, Kim WJ. The Improvement Plan of Safety Management Works and Safety Relation Laws in Korea. Journal of the architectural institute of korea 2001;17(10):111-20.
9 Lee CS. Execution of building work. Hansol-academy Publishing co;2006.
10 Kang KI, Kim GH, Kim JY, Park UY, Seo DS, An SH, Cho HH. Building Construction I. Daega Publishing co; 2004.
11 Shin SW, Kim HO. Construction safety management practice. Chongmunkak Publishing co;2005.