Browse > Article
http://dx.doi.org/10.6106/KJCEM.2016.17.1.018

Safety Management Factor Analysis of Expert Perceptions Based on 4M Method for Plant Construction Phase  

Kim, Kyujin (Department of Architectural Engineering, Dankook University)
Choi, Byungsun (Department of Architecture, Bucheon University)
Chun, Jaeyoul (Department of Architectural Engineering, Dankook University)
Publication Information
Korean Journal of Construction Engineering and Management / v.17, no.1, 2016 , pp. 18-27 More about this Journal
Abstract
The purpose of this study is to classify main risk factors on a construction phase of a plant project and analyze importance by the risk factors. Plant Industry is continuing boom and the increase in overseas plant orders in 2014 has showed a performance increase of 61% of the total orders, as the plant industry are risk factors for the construction phase, safety management target recognition and variety of accident prevention and safety factors by importance, etc. a situation that requires the development and introduction of management. So, it is performed that collected disaster conditions data on a construction phase of a plant project, is questioned by plant construction professional and is classified by 4M. Then, it is performed that is questioned by plant construction and safety professional in order to apply AHP method, and is presented from analyzing the risk factors, which are results of the survey, by importance and priority. This study will recognize from identifying the main risk factors in advance and will be utilized as a basic data is to prevent the risk factors.
Keywords
Plant; Construction phase; Expert; Risk factors; 4M method; AHP method; Important;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Kim, Hyoung-jean, and Park, Chan-cook. (2013). "Feasibility Study of Plant Safety Training System Technology." The Korean Society of Mechanical Engineers, pp. 3560-3562.
2 Kim, Ji-Hye, and Choi, Jae-Hyun. (2014). 'Risk Factor Identification of Overseas EPC Phases of Plant Projects' Korean Journal of Construction Engineering and Management, KICEM, 13, pp. 147-148
3 Kim, T. H. (2013). "A Study on the Hazard Identification of Laboratory using 4M & HAZOP." The Korean Society of Safety, 28(3), pp. 88-94.
4 Lee, Dong-Woo, and Kim Yong-Su. (2014). 'The Deduction and Analysis of Risk Factors at the EPC Phases of the Offshore Plant by Using AHP: Focused on FPSO Offshore Plant', University Students Conference, Korean Journal of Construction Engineering and Management, KICEM, pp. 70-73.
5 Noh, M. G. (2011). "Construction by Trade Risk Assessment Model." Korea Occupational Safety & Health Agency (June, 2011).
6 Park, K. S. (2011). "Based on the analysis of Plant Industry" Korea Instirute for Industrial Economics & Trade. .
7 Park, Jong-Keun. (2012). "Safety Management Information System in Plants Construction Work." The Journal of Korea Safety Management & Science, 14(4), pp. 23-29.   DOI
8 Park, S. Y. (2012). "Construction of Plant Safety Management System using IOT(Internet of Things) Technology." KSCE Journal of Civil Engineering, pp. 2084-2087.
9 Seo, Seong-Hwa, Weon, Jong-il, and Woo, Heung-sik. (2012). "Effective Detection Technique of Near Miss using 4M Risk Assesment Methodology." The Korean Society of Safety, 27(5), pp. 164-170.
10 "4M Risk Assessment Manual" Korea Occupational Safety & Health Agency. (May, 2010).