물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구 (A Study on the Escalation Method for Contract Adjustment Public Construction Project)

  • 배경태;최동수;황치원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 추계 학술논문 발표대회
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

도시 가로수 관리 품셈 개선에 관한 연구 (A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees)

  • 도윤택;한봉호;박석철
    • 한국조경학회지
    • /
    • 제50권4호
    • /
    • pp.20-36
    • /
    • 2022
  • 본 연구는 가로수 관리의 합리적인 표준품셈 항목 및 적정 단가 설정을 통한 고품질 가로수 관리의 기초자료 제공을 목적으로 하였다. 현재 가로수 관리항목은 가로수 전정을 제외하고, 일반 조경수 품셈을 가로수 관리 품셈으로 활용하고 있다. 또한 한국전력공사에서는 표준전기품셈의 가지치기 항목을 적용하여 표준품셈 대비 강전정의 경우 평균 51%, 약전정의 경우 평균 39% 낮은 단가로 사업을 수행하고 있다. 이는 가로수 관리 품질을 유지하거나 향상시킬 수 없는 한계로 판단되었으며, 가로수 관리의 적정 단가 기준이 필요함을 뜻한다. 가로수 관리 품셈을 개선하기 위해 현업에서 투입되는 비용을 검토할 필요가 있었다. 하지만 국내의 조경 분야 실적공사비에 대한 데이터의 부재로 미국 RSMeans Building Construction Cost Data(RSMeans)의 세부항목을 검토하였다. RSMeans란 1942년부터 누적된 미국의 실적기반 적산방식으로 주로 연방교통부와 각 주정부의 도로국을 중심으로 공사비를 산정하는 데이터베이스이다. RSMeans는 지속적인 신기술 도입과 노동 및 재료비용의 계속된 변경을 반영하기 위해 매해 건설제품과 방법을 찾고 수량화하며, 생산성 비율을 조정하고 있다. 본 연구에서는 국내 조경 관리 방법과 큰 차이가 없는 RSMeans의 세부항목과 현행 인건비 등을 적용하여 실적공사비를 산출하였다. 적용 결과 표준품셈은 실적공사비와 비교하면 가로수 전지의 강전정의 경우 107%로의 양호한 비율이었지만, 약전정은 59%로 과소 설계가 되어 있었다. 또한, 관목 전정은 82%, 제초는 92%, 교목 시비는 87%, 방풍벽 설치는 91% 수준으로 과소 설계되어 있었다. 살수차 관수와 약제 살포는 각각 118%와 124%의 비율로 실적공사비와 비교하면 과대 설계된 부분도 확인하였다. 과소평가된 항목들은 가로수의 특수성으로 도로 안전통제 등으로 인건비 및 장비의 투입비 상승이 주요 원인으로 판단되었다. 향후 표준품셈의 조경 유지 관리항목에 일반 조경수뿐만 아니라 가로수에 관한 항목 추가가 필요하다.

초·중·고등학교 시설물별 추정공사비 산정모델 개발 (Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities)

  • 정의현;염동준;김준상;김영석
    • 한국건설관리학회논문집
    • /
    • 제22권3호
    • /
    • pp.69-78
    • /
    • 2021
  • 추정공사비는 기본설계 이전단계에서 건설사업에 투입되어야 하는 적정 예산의 확보를 위해 산정되는 중요한 건설공사비 지표이다. 여러 공공기관에서는 추정공사비를 산정하기 위해 공공건축물 세부 유형별 단위면적당 공사비를 도출하고, 이를 해당 건축물의 연면적에 곱하는 방식을 사용하고 있다. 그러나 일부 공공건축물들은 그 시설물의 구성 및 조합이 다양하여 세부 유형별로 단위면적당 공사비를 산정하는 획일화된 현행 추정공사비 산정방법으로는 공공건축물 내 여러 시설물 조합에 따른 특성을 반영할 수 없어 신뢰성 있는 추정공사비를 산정하는데 한계성을 지니고 있는 것으로 조사 및 분석되었다. 본 연구의 목적은 발주 빈도수 및 누적사업비용의 규모가 크고 시설물의 구성 및 종류가 다양한 초·중·고등학교를 대상으로, 시설물 조합에 따른 추정공사비 산정방안을 제시하는 것이다. 본 연구에서 개발한 초·중·고등학교 시설물별 추정공사비 산정모델 및 분석 방법론을 실무에 적용할 경우 공공발주자는 보다 합리적이고도 신뢰성 있는 초·중·고등학교의 추정공사비 산정이 가능할 것으로 기대된다.

RF Power Detector for Location Sensing

  • Kim, Myung-Sik;Kubo, Takashi;Chong, Nak-Young
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.1771-1774
    • /
    • 2005
  • Recently, RFID has become popular in the field of remote sensing applications. Location awareness is one of the most important keys to deploying RFID for advanced object tracking. Generally, multiple reference RF stations or additional sensors are used for the location sensing with RFID, but, particularly in indoor environments, spatial layout and cost problems limit the applicability of those approaches. In this paper, we propose a novel method for location sensing with active RFID systems not requiring the need for reference stations or additional sensors. The system triangulates the position of RF signal source using the signal pattern of the loop antenna connected to the power detector. The power detector consists of a signal strength detector and a signal analysis unit. The signal analysis unit indicates the signal strength and serial number using the signal from the strength detector, and provides the direction of the signal to the application target. We designed three different signal analysis units depending on the threshold type. The developed system can sense the direction to the transponder located over 10 m away within the maximum error of $5^{\circ}$. It falls within a reasonable range in our normal office environment.

  • PDF

다이아몬드 트러스 벽면으로 구성된 P-TDC 모델의 강성 및 강도 연구 (Study of Effective Stiffness and Effective Strength for a Pinwheel Model combined with Diamond Truss-Wall Corrugation (P-TDC))

  • 최정호
    • 한국산업융합학회 논문집
    • /
    • 제19권3호
    • /
    • pp.109-124
    • /
    • 2016
  • The objective of this paper is to find the density, stiffness, and strength of truss-wall diamond corrugation model combined with pinwheel truss inside space. The truss-wall diamond corrugation (TDC) model is defined as a unit cell coming from solid-wall diamond corrugation (SDC) model. Pinwheel truss-wall diamond corrugation (P-TDC) model is made by TDC connected with pinwheel structure inside of the space. Derived ideal solutions of P-TDC is based on truss-wall and pinwheel truss model at first. And then it is compared with Gibson-Ashby's ideal solution. To validate the ideal solutions of the P-TDC, ABAQUS software is used to predict the density, strength, and stiffness, and then each of them are compared to the ideal solution of Gibson-Ashby with a log-log scale. Applied material property is stainless steel 304 because of having cost effectiveness. Applied parameters for P-TDC are 1 thru 5 mm diameter within fixed opening width as 4mm. In conclusion, the relative Young's modulus and relative yield strength of the P-TDC unit model is reasonable matched to the ideal expectations of the Gibson-Ashby's theory. In nearby future, P-TDC model is hoped to be applied to make sandwich core structure by advanced technologies such as 3D printing skills.

교량기초의 지지력확인 시험 결과에 따른 건설비 절감사례 (Test results confirm the bridge foundation bearing capacity due to construction costs case)

  • 이수곤;우재경
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.1065-1072
    • /
    • 2010
  • Case studies published in Korea versus the low ground fault is applied on the bridge based on theory or experience in the design of pile bearing capacity by the value of the expression is designed to conduct field tests Disclosure Load bearing capacity value, the result of applying a reasonable construction cost savings of approximately 10 eokyeowon Has, in the design of site investigation was insufficient to require additional efforts. Apply the appropriate value from the extra support in the design of accurate ground survey and air speed to cut the budget and social technology can ensure the reliability was unknown.

  • PDF

비모수 검정기반 공공부문 실적단가 선정모델 개발 -공동주택 철근콘크리트 공종을 중심으로- (Development of Historical Data Selection Model Using Non-parametric test in Public Sector - focused on Reinforced Concrete Works of Multi-housing Projects -)

  • 이현기;전재용;박성철;홍태훈;구교진;현창택
    • 한국건설관리학회논문집
    • /
    • 제9권1호
    • /
    • pp.87-95
    • /
    • 2008
  • 정부는 2004년 상반기부터 실적단가집을 발행하여 실적공사비에 의한 예정가격 작성방안을 적극 활용하고자 하였다. 그러나, 건설업계에서는 현행 실적공사비제도가 내포하고 있는 문제점으로 인해 사업성 악화를 우려하며 실적공사비제도의 개선을 요구하고 있다. 본 논문은 철근콘크리트 공사의 실적단가와 시장단가의 흐름을 관찰하여 실적공사비제도의 문제점을 확인하고 현행 실적단가 선정 모델을 개선한 새로운 모델을 제시하고자 한다. 개선된 실적단가 선정 모델은 합리 적인 공사비 예측을 통해 관련업체를 효율적으로 지원하여 건설업체의 수익성을 확보하고 실적단가의 신뢰성을 제고할 수 있을 것으로 기대된다.

통계적 기법을 활용한 ILM압출공법 교량 상부공사 개략공사비 산정모델 개발 연구 (Development of the Approximate Cost Estimating Model Using Statistical Inference for PSC Box Girder Bridge Constructed by the Incremental Launching Method)

  • 김상범;조지훈
    • 대한토목학회논문집
    • /
    • 제33권2호
    • /
    • pp.781-790
    • /
    • 2013
  • 본 연구에서는 평균건설단가를 적용하여 개략 공사비를 산출하는 기존 방식에서 벗어나 대표공종을 이용한 입력변수 도출 모델을 구축하여 기본설계단계에서 고려되어지는 여러 입력변수들을 활용하여 P.S.C(Prestressed Concrete) Box Girder 교량에서 널리 활용되고 있는 I.L.M(Incremental Launching Method) 공법에 연구 모델을 적용하고자 한다. 2000년부터 설계된 공사비 데이터와 설계자료 등을 분석하여 상부공사 중 총 공사비대비 누적비율 95%이상을 차지하는 공종을 대표공종으로 도출하였다. 각 대표공종의 하위공종에 대한 내역 분기를 실시하여 각 항목들의 Database를 구축하였다. 본 연구에서는 다각적인 측면에서 개략공사비 산정 모델을 개발 및 제시하였으며, 사용자 입장에서 보다 쉽게 접근할 수 있도록 대표공종을 기초로 단위물량을 사용한 개략공사비 산정모델(I)과 상관성이 높은 입력변수를 선택한 개략공사비 산정모델(II)과 상관계수 0.6이상의 입력변수들을 모두 포함하는 다중회귀분석을 통한 개략공사비 산정모델(III)을 제시한다. 실제 총공사비와 본 연구에서 제시하는 개략공사비 산정모델들을 비교하고, 신뢰성을 검증함으로써 현재 국내에서 사용되는 산정방법에 비해 정밀도 측면에서 효율적인 공사비 관리방법을 제시한다.

기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구 (A study on the normal project duration development for the construction of multi-utility tunnel in the existing city)

  • 이성원;이필윤;변요셉;조중연;이민재
    • 한국산학기술학회논문지
    • /
    • 제19권12호
    • /
    • pp.677-685
    • /
    • 2018
  • 건설공사에서 공정관리는 기본적으로 가장 중요한 단계이며, 효율적인 공정관리를 위해서는 합리적 공정표 작성이 우선시 되어야 한다. 설계단계에서는 기상조건과 현장 특성을 고려한 다양한 조건과 공법의 비교 검토를 통해 최적의 공사 기간을 산정할 수 있으나, 기획단계에서 기본적인 자료(D/B) 분석만으로는 효율적 공법 선정과 적정한 공사 기간 산정이 어렵다. 따라서, 기획단계에서 기존시가지의 공동구 건설시 표준공기 분석을 위하여, 본 논문에서는 공동구 형식을 개착식 및 터널식으로 구분하고, 각 형식의 특성과 기존시가지의 조건을 고려한 공법을 선정 하도록 하였다. 합리적인 공기 계산을 위하여 외부 공사에 영향을 주는 기상조건을 고려하여 년 간 가동율을 산정 하였으며, 개착식은 RC 공법/터널식은 Shield TBM 공법에 대한 단위공정을 분석하였다. 각 단위공정을 종합하여 연장 1,200m, 환기구 200m 간격으로 가정한 공사의 표준공기를 산정한바, 개착식은 893일, 터널식은 616일이 소요되는 것으로 분석 되었다. 본 연구의 결과는 기획단계에서 보다 쉽게 공동구 형식 선정과 표준공기 산정에 도움이 될 것이며, 추후 설계단계에 연계하면 공정 및 공사비 산정이 용이할 것으로 판단된다.

교량 안전성과 공용년수를 고려한 적정 보수보강 예산 배분 (Bridge Appropriate Maintenance Budget Allocation Considering Safety and Service Life)

  • 선종완;이후석;박경훈
    • 한국산학기술학회논문지
    • /
    • 제18권11호
    • /
    • pp.130-137
    • /
    • 2017
  • 교량의 목표 수명 동안 통행 안전성을 유지하기 위해서는 적정한 보수보강 예산의 확보와 확보된 예산의 합리적인 배분이 필요하다. 기존의 단순 교량 규모 기반 예산 배분 방식을 개선하여 다양한 영향인자를 고려한 합리적인 예산 배분 결정 체계를 제안하였다. 전체 교량을 하위 관리주체별로 일정한 관리 수준이 확보되도록 교량의 보수보강 예산을 적정하게 배분하기 위하여 과거 보수보강 이력에 기초한 조치율 모델과 단위 비용 모델을 개발하였다. 제안된 모델을 이용하여 관리주체별 적정 예산 배분 비율 결정 방법을 제안하고 사례 분석을 수행하였다. 교량의 보수보강 예산 배분의 영향 인자로 교량 규모뿐만 아니라 종별 현황과 현재 안전등급, 공용년수가 고려되어야 적정 예산 배분이 이루어지는 것으로 나타났다. 개발된 방법을 활용하여 관리 주체별 예산 소요를 명확하게 반영한 예산 분배를 시행함으로서 불필요한 예산 낭비를 방지하고 예산 배분의 합리적인 근거를 제공할 수 있을 것으로 판단된다.