Test results confirm the bridge foundation bearing capacity due to construction costs case

교량기초의 지지력확인 시험 결과에 따른 건설비 절감사례

  • 이수곤 (서울시립대학교 토목공학과) ;
  • 우재경 (서울시립대학교 토목공학과)
  • Published : 2010.03.25

Abstract

Case studies published in Korea versus the low ground fault is applied on the bridge based on theory or experience in the design of pile bearing capacity by the value of the expression is designed to conduct field tests Disclosure Load bearing capacity value, the result of applying a reasonable construction cost savings of approximately 10 eokyeowon Has, in the design of site investigation was insufficient to require additional efforts. Apply the appropriate value from the extra support in the design of accurate ground survey and air speed to cut the budget and social technology can ensure the reliability was unknown.