Browse > Article
http://dx.doi.org/10.6106/KJCEM.2021.22.3.069

Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities  

Jung, Eui-Hyun (Department of Architectural Engineering, Inha University)
Yeom, Dong-Jun (Department of Construction Policy Research, Korea Institute of Civil Engineering and Building Technology)
Kim, Jun-Sang (Department of Architectural Engineering, Inha University)
Kim, Young Suk (Department of Architectural Engineering, Inha University)
Publication Information
Korean Journal of Construction Engineering and Management / v.22, no.3, 2021 , pp. 69-78 More about this Journal
Abstract
Estimated construction cost is an important index to secure an optimal budget which needs to go into construction projects in the previous of basic design phase. In order for public institutions to calculate the estimated construction cost, the cost per unit area of public buildings is used. However, the current calculation method of the estimated construction cost in public buildings is impossible to reflect the characteristics of many facilities and combinations. The purpose of this study is to develop an estimation model in the previous of basic design phase for the elementary, middle and high school facilities. it is expected that it is possible to estimate the construction cost of the elementary, middle and high schools in a reasonable and reliable manner through the estimation model developed in this study.
Keywords
Estimated Construction Cost; Estimation Model; Elementary.Middle.High School; School Facilities;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Durbin, J., and Watson, G.S. (1950). "Testing for Serial Correlation in Least Squares Regression. 1." Biometrika, 37(3-4). pp. 409-428.   DOI
2 Hegazy, T., and Moselhi, O. (1994). "Analogy-Based Solution to Markup Estimation Problem." ASCE Journal of Computing Civil Engineering, 8(1). pp. 72-87.   DOI
3 Kang, S.D. (2003). "A Study on the Prediction of Construction Costs by Regression Analysis by Building Areas in the Early Planning Stage." Master's thesis, Yeungnam University.
4 Kang, S.H. (2010). "A study on the estimation of the cost of the bridge construction." Doctoral dissertation, Korea Maritime University.
5 Kim, K.H., An, S.H., and Cho, H.G. (2006). "Comparison of the Accuracy between Cost Prediction Models based on Neural Network and Genetic Algorithm." Journal of the Architectural Institute of Korea Structure & Construction, 22(3), pp. 111-118.
6 Kim, S.K. (2008). "A study on the analysis and estimation of construction cost by using artificial neural network in the BTL project for educational facilities." Master's thesis, Hongik University.
7 Lim, S.Y. (2010). "A study on improving the estimation accuracy of apartment project cost." Master's thesis, Jeonnam university.
8 Kim, J.W. (2011). "A study on construction cost estimation model of educational facilities using regression analysis : for the BTL project in the Gyeonggi-do region." Master's thesis, Hanyang University.
9 KICT (Korea Institute of Civil Engineering and Building Technology) (2019). Construction cost index in September 2019.
10 Lee, K.H. (2014). Statistical Analysis using SPSS, Freeaca Press, Korea.
11 MOLIT (Ministry of Land, Infrastructure and Transport) (2018). Standards for reviewing the management methods of construction projects and guidelines for performance of duties.
12 MOEF (Ministry of Strategy and Finance) (2018). Guidelines for managing total business expenses.
13 PPS (Public Procurement Service) (2017). Analysis of construction costs by type of public buildings in 2017.
14 Park. S.H. (2011). "Judgement Model for Construction Cost Appropriateness of Multi-Family Housing Projects in Planning Phase." Master's thesis, Seoul City University.