OFF-SITE MANUFACTURE OF APARTMENT BUILDINGS

  • Neville Boyd
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.304-310
    • /
    • 2011
  • The populations of major cities in Australia are increasing rapidly and facing an acute housing shortage. Traditional apartment procurement techniques involve lengthy lead-times and factory-based, or offsite manufactured (OSM) multi-storey apartment buildings may offer the opportunity to help fulfill the need by significantly reducing build times. Other advantages of OSM may include superior quality, low weight ratios, economies of scale achieved through repetition of prefabricated units, use on infill sites, sustainable design standards and better occupational health and safety. There are also positive labour and training implications, which may help to alleviate an industry-wide shortage of skills through use of semi-skilled labour. Previous uncertainties about the adoption of offsite due to the high capital costs and perception issues were generally based on pre-cast concrete structures, which are quite a different building type in terms of flexibility, construction, delivery and finishes. Identification of drivers and constraints assists in the determination of current industry status, allows for a benchmark to be established and future opportunities and directions for OSM to be determined.

  • PDF

LEAN CONSTRUCTION MEANS TO PROMOTE GOOD- AND ERADICATE BAD VARIATION

  • Iris D. Tommelein
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.51-59
    • /
    • 2009
  • Lean construction researchers and practitioners have established a new paradigm for managing construction projects. This paradigm stems from insights gained by viewing project delivery as one kind of production and, inspired by the success of the Toyota Production System, leveraging Toyota's 'lean thinking' in the context of such one-of production. Premises of lean construction are that (1) production systems are riddled with variation, (2) variation can be good or bad, but most of it is bad, (3) most of this variation-good or bad-is self-inflicted; consequently 'lean' passionately promotes good- and relentlessly eradicates bad variation. This paper surveys a few of many lean construction means to manage variation. Lean thinking encompasses a lot more than thinking about variation, but that is the lens used here through which construction project management is viewed. Pairing these premises with lean variation-management tools may help readers broaden the insights they can gain from reading the lean construction literature.

  • PDF

State-of-practice and State-of-Art for the Project Cycle Time Reduction

  • Hong, Tae Hoon
    • Architectural research
    • /
    • 제7권2호
    • /
    • pp.69-79
    • /
    • 2005
  • There are no formal decision tools or guidelines to assist owners and contractors in choosing delivery systems and project strategies that would allow for a radical reduction in project cycle time - from the preplanning phase through project start up. Therefore, it is important to identify the state-of-practice and the state-of-art on methods of achieving radical reduction defined as a reduction of 25% or more in overall project cycle time. A comprehensive literature review, three questionnaire surveys, and the seven case studies were conducted and the data obtained from them were analyzed to establish the state-of-practice and state-of-art for project cycle time reduction techniques.

인과관계체인 기반의 분석 결과를 활용한 비즈니스 프로세스 개선 과제 정의 (Defining Business Process Improvement(BPI) Projects with Analysis Results Based on the Cause-and-Effect Chain)

  • 강준규;임승길
    • 산업경영시스템학회지
    • /
    • 제38권1호
    • /
    • pp.101-109
    • /
    • 2015
  • This paper suggests a procedure to define business process improvement (BPI) projects with analysis results based on the cause-and-effect chain. The procedure developed in this paper focuses on eliminating root causes of business problems resulted from abnormal events occurred in business process executions. First, we develop three criteria used to make clusters of the root causes where a cluster of root causes will be eliminated together by a BPI project defined based on the cluster. Second, we develop a method to formulate desired expectations from the BPI project. Also, we suggest a method to calculate the relative importance of the BPI projects that help a BPI organization determine priorities of them. We illustrate the procedure and the methods with some examples for the domestic mail delivery process in the postal service industry.

건강가정지원센터 '가정헌법 만들기' 사업의 '가정헌법' 분석과 발전방안 : 서울 지역 건강가정지원센터를 중심으로 (An Analysis of 'Family Constitution' and the Development Plan for the 'Making Family Constitution' Project in Healthy Family Support Centers : With a Focus on Healthy Family Support Centers in Seoul)

  • 이은주;전미경
    • 가정과삶의질연구
    • /
    • 제31권2호
    • /
    • pp.93-108
    • /
    • 2013
  • This study aimed to analyze the functionality and healthiness of family rules through a relational analysis of the relationship between the rule frequency by sub-family system and the content properties shown in the 'family constitution', It also aimed to examine the relationship between the perception degree of healthy family elements and the family subsystem rules and prepare the project development plans. As a result, it was a found that there were many dysfunctional rules, and healthiness was not satisfied. Project development plans include specific project plans, delivery systems, an orientation for practitioners, the necessity of evaluation and feedback, family health diagnosis, association with other project areas, and small scale operations.

화공플랜트 프로젝트에서 통합관리 소프트웨어 적용에 관한 연구 (A Study on the Application of an Integrated Management Software for a Petrochemical Plant Project)

  • 김윤;이동언;유호선
    • 플랜트 저널
    • /
    • 제6권2호
    • /
    • pp.56-61
    • /
    • 2010
  • In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.

  • PDF

TOC-CCPM과 EVM을 통합한 Synchro-EVM 시스템 개발 연구 (Development of Synchro-EVM System Integrating TOC-CPM and EVM)

  • 이도헌;장길상
    • 대한안전경영과학회지
    • /
    • 제19권4호
    • /
    • pp.291-299
    • /
    • 2017
  • Recently, many business and government organizations have benefitted by executing projects using TOC-CCPM(Theory of Constraints-Critical Chain Project Management). In parallel, Earned Value Management(EVM) metrics have also become popular. Many organizations like US government requires that all large projects measure and report project progress status using EVM. Thus, project management in business fields such as plant construction, IT development, ship building need to integrate TOC-CCPM and EVM in oder to keep and reduce the delivery date of projects for improvement of customer satisfaction and enlargement of business opportunity. This paper proposes the scheme and case of developing the Synchro-EVM system which TOC-CCPM and EVM are connected.

공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구 (A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects)

  • 옥현;김성진;김태학;주기범
    • 한국도로학회논문집
    • /
    • 제20권2호
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

A Study on Performance Analyses of Korea's Bidding and Contract Systems for Public Construction Projects

  • Beak, Seung-Ho;Kang, Tai-Kyung;Park, Wonyoung;Lee, Yoo-Sub
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권3호
    • /
    • pp.18-28
    • /
    • 2015
  • Bidding and contract systems are used for public construction projects to select contractors following fair competition principles and to execute national budgets effectively. Many challenges have arisen due to a lack of transparency and fairness and because bidding practices have been luck-based. Few comprehensive or comparative analyses have been conducted on the performance and limitations of bidding and contract systems, and empirical analyses designed to improve policies on and the practice of such systems are lacking. This study empirically analyzed current bidding and contract systems to seek ways of improving them. The study proposes several alternatives to resolve the problems with and irrationalities of the current system: 1) improving bidding and selection systems by changing them from a luck-based price competition into a technical merit- and value-based competition; 2) improving the assessment criteria to meet the current market level of bid and winning prices; 3) adjusting contractual responsibilities and sharing structures to meet the current trend; and 4) strengthening the competitiveness and expanding the social responsibility-based procurement systems of construction companies.

공공 건설공사 발주방식에 따른 비용성과 비교연구 (Comparison of Cost Performance for Delivery Methods on Public Construction Projects)

  • 이유섭;강태경;신은영;박원영
    • 대한토목학회논문집
    • /
    • 제33권6호
    • /
    • pp.2575-2582
    • /
    • 2013
  • 공공건설공사 발주제도 운영에 있어 기술경쟁을 지향하는 턴키 및 대안방식 등 설계 시공일괄방식의 경우, 시설물의 품질향상 및 건설기술 발전에 기여하였음에도 불구, 계약되는 공사비가 설계 시공 분리발주방식을 적용하는 공사보다 높아 예산낭비 우려가 있다는 지적과 함께 수주독점, 입찰담합, 심의비리 등의 문제가 쟁점이 되고 있다. 그러나 실제 발주방식별 사업성과와 효과에 대해 정밀 비교분석한 사례가 없는 실정이며, 단순히 낙찰률 등 사업의 한정된 일반적 정보만으로 사업효과를 논의하고 판단하는 것은 자칫 오류를 범할 우려가 있다. 이에 공공 건설공사를 대상으로 계약에서 준공에 이르기까지 실제 집행한 공사비 자료를 광범위하게 조사하여 비용의 투입구조 및 변동추세 등 발주방식별 특성을 비교분석하고 공공건설공사 발주제도의 올바른 이해와 효율적 운영을 도모하고자 한다.