1 |
Bae, D.H. and Cho, C.Y.(2000), "Samsung construction EVMS case.", Construction Engineering and Management, 1(2):8-10.
|
2 |
Hong, S.Y.(2013), "Comparative study on feeding buffer estimation in plant construction project with CCPM." Dept. of Project Management, Graduate school of Engineering, Hanyang University.
|
3 |
Peng, W. and Huang, M. (2013), "A critical chain project scheduling method based on a differential evolution algorits." International Journal of Production Research, 52(13):3940-3949.
DOI
|
4 |
Shin, K.Y.(2009), "A study on the method of applying CCPM to shipbuilding industry", Department of Naval Architecture and Ocean engineering Graduate School, Pusan National University.
|
5 |
Song, J.H.(2014), "A study on the reflection of actual man hour using earned value management system for the production project management.", Institute Of e-Vehicle Technology, University of Ulsan.
|
6 |
Shin, M.S.(2013), "A study on the application method of EVMS control account to construction projet of thermal power plant & nuclear powerplant." Department of Project Management, Graduate School of Soongsil University.
|
7 |
Tatebe, K. and Seki, T.(2006), "On an EVM Application in CCPM-scheduled projects.", Journal of the Society of Project Management, 8(1):29-32.
|
8 |
Realization Technologies, Inc.(2012), "Integrating Earned Value Management with Critical Chain Execution.",
|
9 |
Sharma, V.K.(2013), "Earned Value Management : A tool for project performance.", Advances In Management, 6(5):37-42,
|