State-of-practice and State-of-Art for the Project Cycle Time Reduction  

Hong, Tae Hoon (Construction Engineering & Management Research Department, Korea Institute of Construction Technology)
Publication Information
Architectural research / v.7, no.2, 2005 , pp. 69-79 More about this Journal
Abstract
There are no formal decision tools or guidelines to assist owners and contractors in choosing delivery systems and project strategies that would allow for a radical reduction in project cycle time - from the preplanning phase through project start up. Therefore, it is important to identify the state-of-practice and the state-of-art on methods of achieving radical reduction defined as a reduction of 25% or more in overall project cycle time. A comprehensive literature review, three questionnaire surveys, and the seven case studies were conducted and the data obtained from them were analyzed to establish the state-of-practice and state-of-art for project cycle time reduction techniques.
Keywords
Project Management; Radical Reduction; Construction Scheduling; Project Cycle Time; Questionnaire Surveys;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Eldin, E. (1996). 'An Investigation of Schedule Reduction Techniques for the Engineering and Construction Industry.' RR 41-11, Construction Industry Institute (CII), University of Texas, Austin, TX
2 Hastak, M., Gokhale, S., Goyani, K., Hong, T., and Safi, B. (2004). 'Radical Reduction in Project Cycle Time.' RR 193-11, Construction Industry Institute, the University of Texas at Austin, TX
3 Sanvido, V. and M. Konchar. (1998). 'Project Delivery Systems: CM at Risk, Design-Build, Design-Bid-Build.' RR 133-11. Construction Industry Institute (CII), University of Texas, TX
4 Songer, A. D., Diekmann, J., Hendrickson, W., and Flushing D. (2000). 'Situational Reengineering: Case Study Analysis.' Journal of Construction Engineering and Management, 126(3), 185-190   DOI   ScienceOn
5 National Institute of Standards and Technology (NIST) (2001). 'Building and Fire Research Labortory.' www.bfrl.nist.gov/goals_program/01prgmCIA.htm.
6 Back, W. E., K. Moreau, and J. Toon. (1998). 'Determining the Impact of Information Management on Project Schedule and Cost.' RR 125-11, Construction Industry Institute (CII), University of Texas, Austin, TX
7 Mathews, J. and Ashley B. (1986). 'Contract Clause Study Data.' SD-9, Construction Industry Institute, the University of Texas at Austin, TX