1 |
Eldin, E. (1996). 'An Investigation of Schedule Reduction Techniques for the Engineering and Construction Industry.' RR 41-11, Construction Industry Institute (CII), University of Texas, Austin, TX
|
2 |
Hastak, M., Gokhale, S., Goyani, K., Hong, T., and Safi, B. (2004). 'Radical Reduction in Project Cycle Time.' RR 193-11, Construction Industry Institute, the University of Texas at Austin, TX
|
3 |
Sanvido, V. and M. Konchar. (1998). 'Project Delivery Systems: CM at Risk, Design-Build, Design-Bid-Build.' RR 133-11. Construction Industry Institute (CII), University of Texas, TX
|
4 |
Songer, A. D., Diekmann, J., Hendrickson, W., and Flushing D. (2000). 'Situational Reengineering: Case Study Analysis.' Journal of Construction Engineering and Management, 126(3), 185-190
DOI
ScienceOn
|
5 |
National Institute of Standards and Technology (NIST) (2001). 'Building and Fire Research Labortory.' www.bfrl.nist.gov/goals_program/01prgmCIA.htm.
|
6 |
Back, W. E., K. Moreau, and J. Toon. (1998). 'Determining the Impact of Information Management on Project Schedule and Cost.' RR 125-11, Construction Industry Institute (CII), University of Texas, Austin, TX
|
7 |
Mathews, J. and Ashley B. (1986). 'Contract Clause Study Data.' SD-9, Construction Industry Institute, the University of Texas at Austin, TX
|