• Title/Summary/Keyword: Project Size

Search Result 917, Processing Time 0.029 seconds

A Study on Tire Pattern Design for Female Drivers′ Market (여성운전자시장을 위한 타이어패턴디자인연구 - 금호타이어의 ECSTA브랜드 디자인개발사례를 중심으로-)

  • 황영성;손장완;이진렬
    • Archives of design research
    • /
    • v.17 no.3
    • /
    • pp.273-282
    • /
    • 2004
  • This research emphasizes the role of design in tire pattern development by pointing out the problem causing by failure of brand identity establishment under the tire market circumstances, where has been focused more on companies' engineering sides in the past. The study is reorganized by the results of company-university project of Kumhotire Co. & Chosun University and design development is targeted for female drivers as new niche market whose size are rapidly increasing year by year, In the project, design concept is developed by analysis of consumer needs then, design development is performed in both sides of pattern and engineering simultaneously for realizing selected design concept. Generated ideas are screened by discussion with design team members of Kumhotire Co. and eventually, two design items are developed. The study results are expected to contribute to the motivation of more design development investment with engineering so that companies are able to establish effective brand identity in the more severely competing tire market in the future.

  • PDF

A Study on the Microcomputer Aided port Design Simulation and its Application to the Third Stage Busan Port Development Project. (컴퓨터 시뮬레이션을 이용한 항만설계 및 부산항 3단계 개발 계획에 대한 응용에 관한 연구)

  • 김환수
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1991.06a
    • /
    • pp.45-48
    • /
    • 1991
  • This work aims to introduce the concept of microcomputer aided port design simulation methodology including the analysis of the mathematical models to be implemented and apply it to the Third Stage Busan Part Development Project. In the Busan case study the size of the proposed turning basin of the new terminal together with the operational stra-tegies of berthing and unberthing was examined In addition the safety of ships' entry and exit through the projection new breakwaters was as-certained. From the application of simulation to the Busan project it was found that the proposed dredging area was not sufficiently wide enough for a modelled container ship to perform A type unberthing (in which the ship turns to port as she monoeuvres away from No.1 berth with the ass-istance of tuges) especially in a strong easterly wind., It is therefore recommended that Busan pilots should be advised to use B type unberthing strategy in which the ship goes astern from No.1 berth to the turning area in front of No.2 berth(where the ship turns 180 degrees clockwise) especially when the wind is very strong. It is also recommended that a sea buoy be placed outside the new breakwaters as this was found to im-prove the safety of ship manoeuvres through the breakwaters significant-ly. Another recommendation is that the Korean Hydrodynamic Office carry out a detailed survey of the currents in the water area near the new breakwaters. once they have been constructed. In addition it is to be recommended that a current meter be placed at the recommended sea buoy pardised by erroneous current information

  • PDF

The Role and Directions of Korean Urban Development Cooperation: A Review of Colombian Planning Systems and Case Studies of Urban Development Projects (콜롬비아 도시계획 제도와 도시개발사업 사례 분석을 중심으로 살펴본 한국 도시개발 협력 역할과 과제)

  • Choi, Junyoung
    • Land and Housing Review
    • /
    • v.12 no.4
    • /
    • pp.15-30
    • /
    • 2021
  • Korean urban development cooperation is gradually expanding into Latin America and the Caribbean (LAC) region, but strategies to encourage domestic market players to participate are insufficient. This paper investigated the Colombian urban planning system, urban development projects, and Korean projects in Colombia, which leads to implications for international cooperation in LAC. This research, first, compares the national and regional urban planning systems of Colombian major cities, Bogotá and Medellín. Second, case studies are carried out with a land readjustment project, a Macro project for large-scale public rental housing supply, and urban development cooperation between Korea and Colombia. By doing so, the role and the directions for Korean urban development cooperation with LAC such as Colombia are discussed and proposed. The findings suggest, first, aid projects through Official Development Assistance (ODA) should establish urban networks in recipient countries. Second, it is necessary to understand the financing structure for urban development cooperation projects that are different from infrastructure projects. Third, the successful case of urban development cooperation should be demonstrated by making the development period and size optimal and manageable.

Design, setup and routine operation of a water treatment system for the monitoring of low activities of tritium in water

  • C.D.R. Azevedo ;A. Baeza ;E. Chauveau ;J.A. Corbacho ;J. Diaz;J. Domange;C. Marquet ;M. Martinez-Roig ;F. Piquemal ;C. Roldan;J. Vasco ;J.F.C.A. Veloso ;N. Yahlali
    • Nuclear Engineering and Technology
    • /
    • v.55 no.7
    • /
    • pp.2349-2355
    • /
    • 2023
  • In the TRITIUM project, an on-site monitoring system is being developed to measure tritium (3H) levels in water near nuclear power plants. The quite low-energy betas emitted by 3H have a very short average path in water (5 ㎛ as shown by simulations for 18 keV electrons). This path would be further reduced by impurities present in the water, resulting in a significant reduction of the detection efficiency. Therefore, one of the essential requirements of the project is the elimination of these impurities through a filtration process and the removal of salts in solution. This paper describes a water treatment system developed for the project that meets the following requirements: the water produced should be of near-pure water quality according to ISO 3696 grade 3 standard (conductivity < 10 µS/cm); the system should operate autonomously and be remotely monitored.

Efficient Evaluation Method of Operation Cost for Wastewater Treatment Plant by BTL Contract Type (하수처리시설 BTL사업의 합리적인 운영비 산정방안)

  • Kang, Leen Seok;Yoon, Sun MI;Kwon, Joong Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.627-634
    • /
    • 2009
  • The BTL (Build-Transfer-Lease) contract of construction project serves as a part for early establishment of industrial foundation for social overhead capital. However, project cost of BTL contract is focused on initial construction cost. Accordingly, operation cost is lowly evaluated because there is no standard criterion for estimating maintenance cost for the facility. The low operation cost can be a factor that reduces service quality of facility operation. This study suggests a resonable method for estimating cost and manpower in the operation phase by using the existing practical data for wastewater treatment plant by BTL contract. The results of the study can be used for evaluating rough operation cost and manpower of similar plant project by facility size.

Effects of CYP1A2$^*$1C and CYP1A2$^*$1F Genotypes on the Activity and Inducibility of CYP1A2 Determined by Urinary Caffeine Metabolite Ratio in Koreans

  • Shin, Mi-Kyung;Yi, Hyeon-Gyu;Kwon, Yong-Hyun;Lee, Sung-Keun;Lim, Woo-Sung;Park, Chang-Shin;Kang, Ju-Hee
    • Molecular & Cellular Toxicology
    • /
    • v.3 no.4
    • /
    • pp.314-319
    • /
    • 2007
  • The effects of common variants of CYP1A2 gene (CYP1A2$^*$1C and CYP1A2$^*$1F) on the CYP1A2 activity and inducibility were controversial. The aim of the present study is to investigate the effects of CYP1A2$^*$1C and CYP1A2$^*$1F on the activity of CYP1A2 determined by urinary caffeine metabolite ratio in Koreans. As might be expected, there was large inter-individual variation (16-folds) of CYP1A2 activity ranged from 2.41 to 39.58. The mean CYP1A2 activity of smokers was significantly higher than that of non-smokers. The frequencies of CYP1A2$^*$1C (-3858A) and $^*$1F (-164A) alleles were 0.219 and 0.646, respectively. The effect of CYP1A2$^*$1C on the CYP1A2 activity was not significant. However, the CYP1A2 activity of subjects with AA genotype for CYP1A2$^*$1F allele was significantly lower than that of non-AA genotypes (CC, or CA). Interestingly, the significant effect of CYP1A2$^*$1F allele on CYP1A2 activity was not observed in nonsmokers. Our results suggest that CYP1A2$^*$1F allele rather than CYP1A2$^*$1C allele significantly influences on the inducibility of CYP1A2 in Koreans. Owing to small sample size of our study, further studies should be conducted to reveal the inter-ethnic difference or the gene-environmental interaction.

The effect of LiF-maleic acid added calcium aluminate hone cement & CA-PMMA composite bone cement on the healing of calvarial defect6) (LiF-maleic acid 첨가 calcium aluminate 골시멘트 및 CA-PMMA 복합 골시멘트가 백서 두개골 결손부 치유에 미치는 영향)

  • Shin, Jung-A;Yun, Jeong-Ho;Oh, Seung-Han;Baik, Jeong-Won;Choi, Se-Young;Kim, Chong-Kwan;Choi, Seong-Ho
    • Journal of Periodontal and Implant Science
    • /
    • v.32 no.4
    • /
    • pp.753-767
    • /
    • 2002
  • The purpose of this study was to evaluate histologically the effect of LiF-maleic acid added calcium aluminate(LM-CA) bone cement & CA-PMMA composite bone cement on the healing of calvarial defect in Sprague-Dawley rats. The critical size defects were surgically produced in the calvarial bone using the 8mm trephine bur. The rats were divided in three groups : In the control group, nothing was applied into the defect of each rat. LM-CA bone cement was implanted in the experimental group 1 and CA-PMMA composite bone cement was implanted in the experimental group 2. Rats were sacrificed at 2, 8 weeks after surgical procedure. The specimens were examined by histologic analysis, especially about the bone-cement interface and the response of surrounding tissue. The results are as follows; 1. In the control group, inflammatory infiltration was observed at 2 weeks. At 8 weeks, periosteum and duramater were continuously joined together in the defect area. But the center of defect area was filled up with the loose connective tissue. 2. In the experimental group 1, the bonding between implanted bone cement and the existing bone was seen, which more increased in 8 weeks than 2 weeks. Inflammatory infiltration and the dispersion of implanted bone cement particles were seen in both 2 weeks and 8 weeks. 3. In the experimental group 2, implanted bone itself had a dimensional stability and no bonding between implanted bone cement and the existing bone was seen in both 2 weeks and 8 weeks. Implanted bone cement was encapsulated by fibrous connective tissue. In addition, inflammatory infiltration was seen around implanted bone cement. On the basis of these results, when LM-CA bone cement or CA-PMMA composite bone cement was implanted in rat calvarial defect, LM-CA bone cement can be used as a bioactive bone graft material due to ability of bonding to the existing bone and CA-PMMA can be used as a graft material for augmentation of bone-volume due to dimensional stability.

Preliminary Analysis of the Bid Success Ratio according to the Characteristics of Overseas Construction Projects (해외건설 프로젝트 특성에 따른 입찰 성공률 분석에 관한 기초연구)

  • Kim, Seung-Won;Lee, Kang-Wook;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.122-133
    • /
    • 2019
  • In the construction industry, bidding competitiveness is the most basic and important competence of the company. Bidding competitiveness comes from competitive advantage, but the strategy of the company to capture bidding competitiveness varies with the characteristics of the project. In particular, overseas construction is where uniqueness of the construction industry and the specificity of international business coexist. This study analyzes the bidding success ratio and the level of bidding difficulty by project characteristics with 12,952 overseas construction bidding cases. Consequently, it was found that the bidding success ratio of Middle East and North Africa (MENA) and civil engineering was the lowest in each group of project characteristics, and therefore the level of bidding difficulty is high, respectively. In addition, it was confirmed that the bidding success ratio of small size or short duration project was relatively high, and the bidding success ratio of both the negotiated bidding in the bidding method group and the private sector in the client type group was respectively high. However, Kruskal-Wallis test in contract type and period shows that there is no statistically significant difference in the bidding success ratio by group.

Application Method of Phase Division of Fast Track for Construction Project with Complex Structures (복합공종으로 구성된 건설공사의 패스트트랙 단계구분 적용 방식 분석)

  • Kim, Hyun Soo;Hwang, Jae Yoeng;Kang, Hyo Jeong;Park, Sang Mi;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.1
    • /
    • pp.95-105
    • /
    • 2022
  • Recently, as the scale of a construction project has become larger and more complicated, there are many cases where construction projects with complex structures are carried out in a fast track method to save construction duration. In the fast track method, the proper division of construction phases is an important issue in determining the overall project period. This study presents a rational phase division method that can be applied when a construction project with complex structures is carried out as a fast track. For this study, a subdivided work breakdown structure (WBS) is developed using the construction of 4 soccer stadiums as application examples, and the schedule is analyzed by dividing the construction process of major phases. To this end, five proposals are applied to analyze the adequacy of the fast track phase division. For the draft with the minimum construction period, the fast track phase division and the schedule model of by each phase were presented. This methodology can have an application in the appropriate phase division and schedule model by construction phase when fast track is applied in large construction project of a similar size.

A Study on the Microcomputer Aided Port Design Simulation and its Application to the Third State Busan Port Development Project. (컴퓨터시뮬레이션을 이용한 항만설계 및 부산항 3단계 개발 계획에 관한 응용에 관한 연구)

  • 김환수
    • Journal of the Korean Institute of Navigation
    • /
    • v.15 no.1
    • /
    • pp.12-47
    • /
    • 1991
  • This work aims to introduce the concept of microcomputer aided port design simulation methodology including the analysis of the mathematical models to be implemented and apply it to the Third Stage Busan Port Development Project. In the Busan case study, the size of the proposed turning basin of the new terminal, together with the operational strategies of berthing and unberthing, was examined, In addition, the safety on ship's entry and exit through the projected new breakwaters was ascertained. From the application of simulation to the Busan project, it was found that the proposed dredging area was not sufficiently wide enough for the modelled container ship to perform A time unberthing (in which the ship turns to port as she manoeuvres away from N.1. Berth with the assistance of tugs), especially in a strong easterly wind. It is therefore, recommended that Busan pilots should be advised to sue B type unberthing strategy, in which the ship goes astern from no.1 berth tot he turning area in front of No.2 berth(where the ship turns 180 degrees clockwise), especially when the wind is very strong, It is also recommended that a sea buoy be placed outside the new breakwaters, as this was found to improve the safety of ship manoeuvres through the breakwaters significantly . Another recommendation is that the Korean hydrodynamic Office carry out a detailed survey of the currents in the water area near the new breakwaters once they have been constructed. In addition, it is to be recommended that a current meter be placed at the recommended sea buoy to improve the safety of ship manoeuvres which could otherwise be jeopardised by eeroneos current information.

  • PDF