A Study on the Microcomputer Aided port Design Simulation and its Application to the Third Stage Busan Port Development Project.

컴퓨터 시뮬레이션을 이용한 항만설계 및 부산항 3단계 개발 계획에 대한 응용에 관한 연구

  • Published : 1991.06.01

Abstract

This work aims to introduce the concept of microcomputer aided port design simulation methodology including the analysis of the mathematical models to be implemented and apply it to the Third Stage Busan Part Development Project. In the Busan case study the size of the proposed turning basin of the new terminal together with the operational stra-tegies of berthing and unberthing was examined In addition the safety of ships' entry and exit through the projection new breakwaters was as-certained. From the application of simulation to the Busan project it was found that the proposed dredging area was not sufficiently wide enough for a modelled container ship to perform A type unberthing (in which the ship turns to port as she monoeuvres away from No.1 berth with the ass-istance of tuges) especially in a strong easterly wind., It is therefore recommended that Busan pilots should be advised to use B type unberthing strategy in which the ship goes astern from No.1 berth to the turning area in front of No.2 berth(where the ship turns 180 degrees clockwise) especially when the wind is very strong. It is also recommended that a sea buoy be placed outside the new breakwaters as this was found to im-prove the safety of ship manoeuvres through the breakwaters significant-ly. Another recommendation is that the Korean Hydrodynamic Office carry out a detailed survey of the currents in the water area near the new breakwaters. once they have been constructed. In addition it is to be recommended that a current meter be placed at the recommended sea buoy pardised by erroneous current information

Keywords